FIELD BOREHOLE DRILLING Date: 22-12-2020 Project: MULTLSTOREY BUILDING Contractor : SAGAF ALAMAN COMPANY v Location: GHOUT ALSHAAL / TRIPOLI 32.8474012 Project No: ETZ-eport 56/12-020 Method: DRILLING BY AUGAR : 130812443 Borehole No: BH 1 sor sery.| SPE SURVE ROCK SAMPLE lwerer| ELEV. m [00 30 600 Z] = |e | supo. SOIL DESCRIPTION mate] 2/3 2 oo mls 110 [fll 2 od =| 20 | 3 a =| Gers msi it bows towzary Sty SAND Sh sao Il Pane ee ees women 260 | 5 230: » ed 200 || 7 =| Garza oe ON oe Say SLT igual sao Mls eee 200 | s 260 | 10 04 zo || nq i 24.0. 12 nd TGR Sia the total length of the core revovered expressed aa a percentage ofthe cove run length, SCR is te cumulative length of pieces of solla core recovered expressed as per nage ofthe cove tun lengtly RQDY% Is defined as ihe cumulative lengi ef sola core plces areater than 100mm in lenath mobile: 0913210354 wwrwinfo@aletezanly _Tripol-Libya