FIELD BOREHOLE DRILLING Date: 22-12-2020
Project: MULTLSTOREY BUILDING Contractor : SAGAF ALAMAN COMPANY v
Location: GHOUT ALSHAAL / TRIPOLI 32.8474012 Project No: ETZ-eport 56/12-020
Method: DRILLING BY AUGAR : 130812443 Borehole No: BH 1
sor
sery.| SPE SURVE ROCK SAMPLE lwerer| ELEV.
m [00 30 600 Z] = |e | supo. SOIL DESCRIPTION mate]
2/3 2
oo mls
110 [fll 2
od =|
20 | 3
a =|
Gers msi it bows towzary Sty SAND Sh
sao Il Pane ee ees women
260 | 5
230: »
ed
200 || 7
=|
Garza oe ON oe Say SLT igual
sao Mls eee
200 | s
260 | 10
04
zo ||
nq i
24.0. 12
nd
TGR Sia the total length of the core revovered expressed aa a percentage ofthe cove run length, SCR is te cumulative length of pieces
of solla core recovered expressed as per nage ofthe cove tun lengtly RQDY% Is defined as ihe cumulative lengi ef sola core plces
areater than 100mm in lenath
mobile: 0913210354 wwrwinfo@aletezanly _Tripol-Libya