Vol Slurry tank 5150-

T-014, m3 9175

Day from SCC RD date


35
to RFCC RD date

Source SCC RFCC

RD date 19 December, 2021 23 January, 2022


RD flow, m3/hr 10 32 42
RD flow, m3/day 240 768 1008
Vol filled after 35 day,
8400
m3
Balance vol left, m3 775
Day to max tank after
combine RD 0.8

Internal
*Total vol to be filled up for both tank is 9176 m3

Vol to be filled
Duration, RD flow, RD flow,
Period Source after 35 day,
days m3/hr m3/day
m3
19 Dec 2021 to
SCC 35 10 240 8400
23 Jan 2022
24 Jan 2022 RFCC 1 32 768 776
42 1008 9176