PART COSTING SHEET PART PHOTOGRAPH

CUSTOMER NAME : SUNBEAM


PART NAME KUEHLROHR
PART NUMBER 2515-00:01 SAP CODE
A) Material Breakup
Part Name Spec. Dim. Length in Mtr. RM@ Cost
DIN EN
Aluminium Alloy Pipe Ø16X1 0.72 mtr 35/ mtr 25.20
1706

Total 25.20
B) Process/ Machining Breakup
Process M/C Nos Rate/Nos Cost
Pipe Cutting & Chamfering (One End) Troub M/C 1 2.50 2.50
Deburring Lathe Adda 1 0.75 0.75
Flaring & Bulging (One End) Hyd. Press 1 3.00 3.00
Forming (One end) Hyd. Press 1 3.00 3.00
Flaring other end Hyd. Press 1 3.00 3.00
Forming Other end Hyd. Press 1 3.00 3.00
Bending (3 bend) Manual 3 4.00 12.00

C) Total 27.25
Process/ Machining Breakup
Process M/C %age of A& B Cost

ICC Raw Material Cost 2% of A 0.50


Rejection 2% RM + Process cost 2% of A+B 1.05
Over Head 25% of Process cost 25% of B 6.81
Profit 10% of RM + Process cost 10% of A+B 5.25
Packing & Forwoding 2.50
Total 16.11
68.56
D) Tooling Cost Cost
Flaring Tool 25,000.00
Forming Tool 25,000.00
Bending Tool 25,000.00
Receiving Gauge 15,000.00

Total 90,000.00