Elevator and Escalator Installation Template

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 17

Duration

TASK DATE Progress Start End


(TeamDays) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2
Lifting, Preparation, Mobilization 2% 1 1-Feb-21 2-Feb-21
Plumbing 2% 1 3-Feb-21 4-Feb-21
Template Installation 6% 3 5-Feb-21 8-Feb-21
M/C Room Installation & Wiring 8% 4 9-Feb-21 13-Feb-21
Slow Speed Test 4% 2 14-Feb-21 16-Feb-21
Master Rail Installation 4% 2 17-Feb-21 19-Feb-21
Pit Work & Governer Installation 4% 2 20-Feb-21 22-Feb-21
Car Frame Installation 2% 1 23-Feb-21 24-Feb-21
Counter Weight Frame Installation 2% 1 25-Feb-21 26-Feb-21
Car & CW Balancing & Roping 4% 2 27-Feb-21 1-Mar-21
Working Platform Fixing 2% 1 2-Mar-21 3-Mar-21
Balance Bracket and Rail Installation 8% 4 4-Mar-21 8-Mar-21
Inspection 2 (Rail QC) 2% 1 9-Mar-21 10-Mar-21
Entrance Sill, Jamb & Hatch Door Fixing 6% 3 11-Mar-21 14-Mar-21
Inspection 3 (Entrance QC) 2% 1 15-Mar-21 16-Mar-21
Hoistway & Pit Wiring 4% 2 17-Mar-21 19-Mar-21
Hall Fixtures (Button and Lantern) 4% 2 20-Mar-21 22-Mar-21
Cabin Assembly 8% 4 23-Mar-21 27-Mar-21
Car top wiring 2% 1 28-Mar-21 29-Mar-21
Cabin Wiring with COP 2% 1 30-Mar-21 31-Mar-21
Limit Switches level plate Installation 2% 1 1-Apr-21 2-Apr-21
Hoistway Cleaning 2% 1 3-Apr-21 4-Apr-21
Final T&C and High Speed Test 8% 4 5-Apr-21 9-Apr-21
Internal Inspection & Adjustments 2% 1 10-Apr-21 11-Apr-21
Third Party Inspection 2% 1 12-Apr-21 13-Apr-21
Interior, Wall & Flooring 4% 2 14-Apr-21 16-Apr-21
Handing Over 2% 1 17-Apr-21 18-Apr-21
100% 50
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Duration July August
TASK DATE
(TeamDays) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
Lifting, Preparation, Mobilization 1
Plumbing 1
Template Installation & Inspection 3
Bracket and Rail Installation 4
Rail QC Inspection 1
M/C Beam Installation & Wiring 4
Slow Speed Test 2
Governer Installation & Pit Work 2
Car Frame Installation 1
Counter Weight Frame Installation 1
Car & CW Balancing & Roping 2
Entrance Sill, Jamb & Hatch Door Fixing 3
Entrance QC Inspection 1
Hoistway & Pit Wiring 2
Hall Fixtures 2
Cabin Assembly 4
Car top wiring 1
Cabin Wiring with COP 1
Limit Switches level plate Installation 1
Hoistway Cleaning 1
High Speed Test 4
Internal Inspection & Adjustments 1
Third Party Inspection 1
Interior, Wall & Flooring 0
Handing Over 1
24 25 26 27 28 29 30 31
Number of Floors 4.0
Number of Stops 4.0
Number of Opens
Shaft Height (m) 16.0

Generalized Detailed Duration (As per Experience)


SCOPE PROGRESS Duration in TeamDays Rounded Duration SCOPE PROGRESS Duration in TeamDays Rounded Duration Nature of Variation Days Qty per day
Mobilization and Commencement of work 2% 1.00 1 Lifting, Preparation, Mobilization 2% 1.00 1 Depeding on the location 1
Plumbing 2% 0.27 1 Shaft length 15.0 Floors per day
Template Work 9% 3.27 4
Template Installation 6% 3.00 3 Fixed 3
Inspection 1 (Template)
M/C Room Installation & Wiring 8% 4.00 4 Fixed 4
Machine Work 13% 6.00 6
Slow Speed Test 4% 2.00 2 Fixed 2
Master Rail Installation 4% 2.00 2 Fixed 2
Master rail, Governer and Pit installation 9% 4.00 4
Pit Work & Governer Installation 4% 2.00 2 Fixed 2
Car Frame Installation 2% 1.00 1 Fixed 1
Car frame, CW frame installation and Roping 9% 4.00 4 Counter Weight Frame Installation 2% 1.00 1 Fixed 1
Car & CW Balancing & Roping 4% 2.00 2 Fixed 2
Working Platform Fixing 2% 1.00 1 Fixed 1
Working platform fixing and Completetion of 11% 4.60 5 Balance Bracket and Rail Installation 8% 3.20 4 Shaft length 5.0 Meter per day
brackets and rails installation
Inspection 2 (Rail QC) 2% 0.40 1 Shaft length 40.0 Meter per day
Entrance Sill, Jamb & Hatch Door Fixing 6% 2.67 3 Number of Entrance 1.5 Entrance per day
Entrance Installation 7% 2.93 3
Inspection 3 (Entrance QC) 2% 0.27 1 Number of entrance 15.0 Entrance per day
Hoistway and Pit Wiring 4% 1.33 2 Hoistway & Pit Wiring 4% 1.33 2 Shaft length 3.0 Floors per day
Hall Fixtures 4% 1.33 2 Hall Fixtures (Button and Lantern) 4% 1.33 2 Number of Entrance 3.0 Floors per day
Cabin Assembly 8% 4.00 4 Fixed 4
Cabin assembly and wiring, Cabin top wiring 13% 6.00 6 Car top wiring 2% 1.00 1 Fixed 1
Cabin Wiring with COP 2% 1.00 1 Fixed 1
Limit switches and level plate installation 2% 0.20 1 Limit Switches level plate Installation 2% 0.20 1 Shaft length 20.0 Floors per day
Hoistway Cleaning 2% 0.50 1 Hoistway Cleaning 2% 0.50 1 Shaft length 8.0 Floors per day
High Speed Test 9% 4.00 4 Final T&C and High Speed Test 8% 4.00 4 Fixed 4
Load Test, Brake test, Governer test
Internal Inspection & Adjustments 2% 0.40 1 Internal Inspection & Adjustments 2% 0.40 1 Shaft length 10.0 Floors per day
Third Party Inspection 2% 1.00 1 Third Party Inspection 2% 1.00 1 Fixed 1
Interior, Wall & Flooring 0% Interior, Wall & Flooring 4% 2.00 2 Depending on Clients Requirement Contact client for more details
Handing Over 2% 1.00 1 Handing Over 2% 1.00 1 Fixed 1

100% 41.57 46 100% 43.57 50 31


Number of Floors 4.0
Number of Stops 4.0
Number of Opens
Shaft Height (m) 16.0

Generalized Detailed Duration (As per Experience)


SCOPE PROGRESS Duration in TeamDays Rounded Duration SCOPE PROGRESS Duration in TeamDays Rounded Duration Nature of Variation Days Qty per day
Mobilization and Commencement of work 1% 1.00 1 Lifting, Preparation, Mobilization 2% 1.00 1 Depeding on the location 1
Plumbing 2% 0.27 1 Shaft length 15.0 Floors per day
Template Work 4% 3.27 4
Template Installation & Inspection 7% 3.00 3 Fixed 3
Bracket and Rail Installation 9% 3.20 4 Shaft length 5.0 Meter per day
Bracket and Rail Installation 3.60 4
Rail QC Inspection 2% 0.40 1 Shaft length 40.0 Meter per day
M/C Beam Installation & Wiring 9% 4.00 4 Fixed 4
Machine Work 6% 6.00 6
Slow Speed Test 4% 2.00 2 Fixed 2
Governer and Pit Installation 2.00 Governer Installation & Pit Work 4% 2.00 2 Fixed 2
Car Frame Installation 2% 1.00 1 Fixed 1
Car frame, CW frame installation and Roping 8% 4.00 4 Counter Weight Frame Installation 2% 1.00 1 Fixed 1
Car & CW Balancing & Roping 4% 2.00 2 Fixed 2
Entrance Sill, Jamb & Hatch Door Fixing 7% 2.67 3 Number of Entrance 1.5 Entrance per day
Entrance Installation 19% 2.93 3
Entrance QC Inspection 2% 0.27 1 Number of entrance 15.0 Entrance per day
Hoistway and Pit Wiring 6% 1.33 2 Hoistway & Pit Wiring 4% 1.33 2 Shaft length 3.0 Floors per day
Hall Fixtures 3% 1.33 2 Hall Fixtures 4% 1.33 2 Number of Entrance 3.0 Floors per day
Cabin Assembly 9% 4.00 4 Fixed 4
Cabin assembly and wiring, Cabin top wiring 10% 6.00 6 Car top wiring 2% 1.00 1 Fixed 1
Cabin Wiring with COP 2% 1.00 1 Fixed 1
Limit switches and level plate installation 2% 0.20 1 Limit Switches level plate Installation 2% 0.20 1 Shaft length 20.0 Floors per day
Hoistway Cleaning 1% 0.50 1 Hoistway Cleaning 2% 0.50 1 Shaft length 8.0 Floors per day
High Speed Test 8% 4.00 4 High Speed Test 9% 4.00 4 Fixed 4
Internal Inspection & Adjustments 5% 0.40 1 Internal Inspection & Adjustments 2% 0.40 1 Shaft length 10.0 Floors per day
Third Party Inspection 1% 1.00 1 Third Party Inspection 2% 1.00 1 Fixed 1
Interior, Wall & Flooring 2% Interior, Wall & Flooring 0% Depending on Clients Requirement Contact client for more details
Handing Over 1% 1.00 1 Handing Over 2% 1.00 1 Fixed 1

77% 38.57 41 100% 38.57 45 28


Unit

Lifting,
Preparation,

2%
Mobilization

Plumbing
2%

Template
6%

Installation

M/C Room
Installation &
8%

Wiring

Slow Speed Test


4%

Master Rail
4%

Installation

Pit Work &


Governer
4%

Installation

Car Frame
2%

Installation

Counter Weight
2%

Frame Installation
Car & CW
Balancing &

4%
Roping

Working Platform

2%
Fixing

Balance Bracket
and Rail
8%

Installation

Inspection 2 (Rail
2%

QC)

Entrance Sill,
Jamb & Hatch
6%

Door Fixing

Inspection 3
2%

(Entrance QC)

Hoistway & Pit


4%

Wiring

Hall Fixtures
(Button and
4%

Lantern)

Cabin Assembly
8%

Car top wiring


2%
Cabin Wiring with

2%
COP

Limit Switches
level plate

2%
Installation

Hoistway Cleaning
2%

Final T&C and


8%

High Speed Test

Internal
Inspection &
2%

Adjustments

Third Party
2%

Inspection

Interior, Wall &


4%

Flooring

Handing Over
2%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100%
Elevator
Scope Task Name

Mobilization & Commencement of the


Installation

Template and Rail Installation

Entrance Installation

Car frame, CWT frame, Roping

Sub-Contractor

Hoist-way Wiring

Machine work

Platform & Cabin Installation


Testing and Commissionning

Abans

Handing Over

Number of Cabin Doors X


Number of Floors Y
Number of Stops Z

Average Floors Height h


Average Rail Length l

Number of Entrance X*Z


Number of Rails (Y*h)/l
Rail length per floor

Escalator
Scope Task Name
Mobilization and Survey
Escalator void measures & mark chipping and core cutting (if needed)
Bearing plate installation
Phase I Truss joining
(Installation) Escalator hoisting and placing
Escalator leveling and mid support installation (base on budge floor level,
grid line and centre line)
QC inspection
Tack joining, Connecting steps rail and steps chain
Steps removing, lubricating and re-fixing
Truss cleaning and lubricating
QC inspection
Skirt panel installation, steps installation and adjustment and outer deck
Sub-Contractor Phase II installation
(Installation)
Sub-Contractor Phase II
(Installation)
Glass holder allignment and glass installation
QC inspection
Hand rail guard and hand rail installation
Comb plate, Inner deck and platform adjustment
Safety switch installation and adjustment
Automode testing nad programming
Load test
Phase III (T&C) Removing cladding protection and inner deck protection
Outer deck protection, cleaning and polishing
QC inspection
Phase IV
Escalator cladding (Scaffolding and cladding fixing)
(Installation)
Elevator
Percentage of Percentage of
Work Done Payment

Scaffolding installation 10% 8%

Tempalate installation, plumb chart and


approval. Bracket installation, rail installation,
rail allignment. 15% 12%
Rail QC inspection
Sill support, sill jamb, header fixing and
alignment 15% 12%
Entrance QC inspection

Safety channel, stall beam, top channel


installation. Guide shoe and suspention sleeve
installation. Oil buffer and buffer support
installation. CWT frame and suspension sleeve
installation. Zgoverner tention pulley
installation. Main rope and governer rope
installation with governer rope guard. Sub 15% 12%
weight and compensation weight installation
and pit partition. Compensation pulley and
roping. balancing chine equipment and
installation.

80%
Cabin and CWT QC inspection

Harness cable drop and wiring, hatch door


wiring, clamping,lop,lip,looping cable wiring.
Top and bottom limit switch installation and
wiring. ETS/SDS switch installation and wiring.
15% 12%
Pit electrical switch installation and wiring.
Travelling cable and guard installation. Hall
lantern and call button box & button
installation.

Machine equipments, speed governer


installation, Control pannel,ELD, group pannel
installation. Machine room trunking and wiring. 15% 12%
U Angle testing
Machine QC inspection
Platform installation and allignment. Cabin(car
wall, ceiling, cop pannel, kick plate, hand rail,
door motor, door pannel, car top electrical
equipment and duck installation, car top and 15% 12%
cabin wiring)
QC inspection
Re-checking wiring and connections. U Angle
testing, Slow speed testing. Car balancing and
guid shoe alignmnet. Mechanical adjustment-
hoistway cleaning, rail washing, painting,
landing door and car door adjustment. Car vane
installation, face plate fixing and connection,
group control connection. FCC room
arrangement and connection with function 20% 20% …… 20%
testing. Load Testing

Final QC inspection
Removing stickers of entrance,jamb,car wall
protection. Cleaning and polishing SUS. Clean
hoisway and cabin
100%

Escalator
Percentage of Percentage of
Task Name
Work Done Payment
nd Survey
measures & mark chipping and core cutting (if needed)
installation
40%
ting and placing
ling and mid support installation (base on budge floor level,
entre line)

Connecting steps rail and steps chain


ng, lubricating and re-fixing
and lubricating

tallation, steps installation and adjustment and outer deck


40%
40%
llignment and glass installation

d and hand rail installation


nner deck and platform adjustment
installation and adjustment
ting nad programming

dding protection and inner deck protection


otection, cleaning and polishing

ding (Scaffolding and cladding fixing) 10%

0%
Detailed
SCOPE PROGRESS Duration in TeamDays

Lifting, Preparation, Mobilization


Core Cutting (If Needed)
Survey and Plumbing
Marking and Chipping
Truss joining
Hoisting and Placing
Duration (As per Experience)
Rounded Duration Nature of Variation Days Qty per day

0%