Adb Portfolio and Opportunities Bangladesh
Adb Portfolio and Opportunities Bangladesh
Adb Portfolio and Opportunities Bangladesh
and Opportunities
in Bangladesh
Asian Development Bank
• Established in 1966
• Headquarters in Manila
• 68 members; 49 in the
region – 31 field offices
• 40 borrowing members
• Over 3,000 employees
from 60 nationalities
INTERNAL. This information is accessible to ADB Ma nagement a nd s taff. It may be shared outside ADB with appropriate permission.
7 Operational Priorities
Making cities more
Addressing remaining
livable
poverty and reducing
inequalities
Promoting rural
development and
Accelerating progress in
food security
gender equality
Strengthening
governance and
Tackling climate
institutional capacity
change, building
climate and disaster
resilience, and
Fostering regional
enhancing
cooperation and
environmental
integration
sustainability
3
INTERNAL. This information is accessible to ADB Ma nagement a nd s taff. It may be shared outside ADB with appropriate permission.
Other key priorities
4
INTERNAL. This information is accessible to ADB Ma nagement a nd s taff. It may be shared outside ADB with appropriate permission.
ADB Operations in 2018
(in $ billion)
5
INTERNAL. This information is accessible to ADB Ma nagement a nd s taff. It may be shared outside ADB with appropriate permission.
Growing ADB Sovereign Operations
(in $ billion)
6 6
INTERNAL. This information is accessible to ADB Ma nagement a nd s taff. It may be shared outside ADB with appropriate permission.
7
ADB Sovereign Operations
Active Portfolio by Sectors (2018)
7
INTERNAL. This information is accessible to ADB Ma nagement a nd s taff. It may be shared outside ADB with appropriate permission.
Bangladesh
• Bangladesh became ADB member in 1973
• Bangladesh Resident Mission established in 1982
- first field office of ADB
Since 1973, ADB committed:
9
INTERNAL. This information is accessible to ADB Ma nagement a nd s taff. It may be shared outside ADB with appropriate permission.
Growth of ADB Portfolio in Bangladesh
(2009-2018)
11000
10,087
10000
9000
8000
$ million
7000
6000 6,086
5000 4,482
4000
3000
2009 2010 2011 2012 2013 2014 2015 2016 2017 2018
10
INTERNAL. This information is accessible to ADB Ma nagement a nd s taff. It may be shared outside ADB with appropriate permission.
Current Portfolio: About $10.22 billion
51 Projects with 93 Loans and Grants
(as of 31 October 2019)
Water &
Agri., NR &
Urban
Rural Dev.
1,627.67
543.42
16% Education and
5%
Health
Transport 1,571.17
2,487.47 16%
24%
Energy
Finance & Public 3,075.08
Sector Mgt. 30%
917.96
9%
11
INTERNAL. This information is accessible to ADB Ma nagement a nd s taff. It may be shared outside ADB with appropriate permission.
Indicative Resource Envelope
2022-2024: About $8 billion planned pipeline
2021
2021
Committed
(remaining
20%
approvals
due for
commitment)
3%
Remaining
77%
2,145.00
2,000 1,999.00
1,976.19
1,611.10
1,500
1,285.05
1,000
689.15
500
0
2016 2017 2018 2019 2020 2021
13
INTERNAL. This information is accessible to ADB Ma nagement a nd s taff. It may be shared outside ADB with appropriate permission.
Business Opportunities
14
INTERNAL. This information is accessible to ADB Ma nagement a nd s taff. It may be shared outside ADB with appropriate permission.
Ongoing Procurement: 2020
Sector/EA/Loan/Grant: Estimated
S. N. Remarks
Package Number and Name Price ($, M)
Agriculture, Natural Resources and Rural
Development (ANR) Sector
1 Local Government Engineering Department 78.36 Total 33
(LGED): Loan 3731/3732-BAN Rural Connectivity Packages
Improvement Project (RCIP) through e-GP.
- 27 Packages
Invitation for Bids (IFB) published through
e-Tendering (e-GP): $58.99m, and
- 6 Packages
Bidding Documents being prepared tor
e-Tendering (e-GP): $19.37m.
15
INTERNAL. This information is accessible to ADB Ma nagement a nd s taff. It may be shared outside ADB with appropriate permission.
Ongoing Procurement: 2020
(contd..)
Sector/EA/Loan/Grant: Estimated
S. N. Remarks
Package Number and Name Price ($, M)
Urban and Water Sector
1 Dhaka Water Supply & Sewerage Authority 35.00 Bidding
(DWASA): Loan 3051-BAN: Dhaka documents
Environmentally Sustainable Water Supply Project, being
Package 3.2: Feeder Line (46 km) - under new prepared.
loan
2 Khulna Water Supply & Sewerage Authority 53.53 Bidding
(KWASA): Khulna Sewerage System Improvement documents
Project (Pipeline project): KWASA/STP-1(W-1): being
Construction of 2-Sewage Treatment Plant prepared.
16
INTERNAL. This information is accessible to ADB Ma nagement a nd s taff. It may be shared outside ADB with appropriate permission.
Ongoing Procurement: 2020
(contd..)
Sector/EA/Loan/Grant: Estimated
S. N. Remarks
Package Number and Name Price ($, M)
Urban and Water Sector
3 KWASA: Khulna Sewerage System Improvement 54.76 Bidding
Project (Pipeline project): KWASA/SN-1: documents
Construction of Sewage Network (Group 1), being
Gravity Mains and 2-Sewage Pumping Stations prepared.
17
INTERNAL. This information is accessible to ADB Ma nagement a nd s taff. It may be shared outside ADB with appropriate permission.
Ongoing Procurement: 2020
(contd..)
Sector/EA/Loan/Grant: Estimated
S. N. Remarks
Package Number and Name Price ($, M)
Transport Sector
1 Roads and Highways Department (RHD): Loan 32.00 Bidding
3592/93: SASEC-DNCRP, Phase 2-Tranche 1: documents
Procurement of Civil Works- Improvement of being
Hatikamrul Interchange, ICB, 1S2E, ADB finance prepared.
excludes maintenance
18
INTERNAL. This information is accessible to ADB Ma nagement a nd s taff. It may be shared outside ADB with appropriate permission.
2022-2024 Program
INTERNAL. This information is accessible to ADB Ma nagement a nd s taff. It may be shared outside ADB with appropriate permission.
Energy
20
INTERNAL. This information is accessible to ADB Ma nagement a nd s taff. It may be shared outside ADB with appropriate permission.
Indicative Pipeline: Energy
Amount
Year Sector/ Project Name
($M)
21
INTERNAL. This information is accessible to ADB Ma nagement a nd s taff. It may be shared outside ADB with appropriate permission.
Indicative Pipeline: Energy (contd.)
Amount
Year Sector/ Project Name
($M)
22
INTERNAL. This information is accessible to ADB Ma nagement a nd s taff. It may be shared outside ADB with appropriate permission.
Transport
o Transport capacity expansion (railways,
roads, ports)
o Regional connectivity (corridor
development, capacity expansion and
rehabilitation)
o Urban transport
23
INTERNAL. This information is accessible to ADB Ma nagement a nd s taff. It may be shared outside ADB with appropriate permission.
Indicative Pipeline: Transport
Amount
Year Sector/ Project Name
($M)
2022 SASEC Integrated Trade Facilitation Project 100.0
INTERNAL. This information is accessible to ADB Ma nagement a nd s taff. It may be shared outside ADB with appropriate permission.
Indicative Pipeline: Transport (contd..)
Amount
Year Sector/ Project Name
($M)
2023 SASEC Chittagong-Cox's Bazar Railway Project Phase 1 (tranche 3) - 500.0
Standby
Pipeline Total in 2023 (excluding 3 Standby projects) 800.0
2024 MFF Dhaka Mass Rapid Transit Development Project (Line 5, Southern 300.0
Route) (tranche 1)
2024 Road Safety Improvement Program (RBL) 100.0
2024 Development of Dhirasram Inland Container Depot Project (from 100.0
Standby)
2024 SASEC Dhaka-Northwest Corridor Road Project Phase 3 (tranche 1) 400.0
(from Standby)
2024 SASEC Railway Connectivity Dhaka-Cumilla Chord-line Project (tranche 300.0
1) – Standby
2024 SASEC South Corridor Improvement Project (Daulatdia–Faridpur– 400.0
Barishal) (Phase 1) (tranche 1) - Standby
INTERNAL. This information is accessible to ADB Ma nagement a nd s taff. It may be shared outside ADB with appropriate permission.
Indicative Pipeline: Transport (contd..)
Amount
Year Sector/ Project Name
($M)
INTERNAL. This information is accessible to ADB Ma nagement a nd s taff. It may be shared outside ADB with appropriate permission.
Water and Urban Infrastructure
and Services
o Municipal services (water, sanitation)
o Urban governance
27
INTERNAL. This information is accessible to ADB Ma nagement a nd s taff. It may be shared outside ADB with appropriate permission.
Indicative Pipeline: Water and Urban
Amount
Year Sector/ Project Name
($M)
2022 Second Coastal Towns Environmental Infrastructure Improvement Project 250.0
2022 Secondary Towns Water Supply and Sanitation Project 150.0
2022 Integrated Urban Development Project (RBL) - Standby 300.0
Pipeline Total in 2022 (excluding 1 standby project) 400.0
2023 Integrated Urban Development Project (RBL) (from Standby) 300.0
28
INTERNAL. This information is accessible to ADB Ma nagement a nd s taff. It may be shared outside ADB with appropriate permission.
Indicative Pipeline: Water and Urban
(contd.)
Amount
Year Sector/ Project Name
($M)
2024 Khulna Water Supply Project (Phase-2) (from Standby) 90.0
29
INTERNAL. This information is accessible to ADB Ma nagement a nd s taff. It may be shared outside ADB with appropriate permission.
Education & Health
o Higher education
o Skills development
o Health care
o Social protection
30
INTERNAL. This information is accessible to ADB Ma nagement a nd s taff. It may be shared outside ADB with appropriate permission.
Indicative Pipeline: Education & Health
Amount
Year Sector/ Project Name
($M)
2022 Advanced Skills for Boosting Employment Project - Phase 1 (RBL) 300.0
2023 Support for Health Care Improvement Project (from standby) 500.0
INTERNAL. This information is accessible to ADB Ma nagement a nd s taff. It may be shared outside ADB with appropriate permission.
Indicative Pipeline: Education & Health
(contd.)
Amount
Year Sector/ Project Name
($M)
INTERNAL. This information is accessible to ADB Ma nagement a nd s taff. It may be shared outside ADB with appropriate permission.
Agriculture, Natural Resources
and Rural Development
o Water resource management
o Rural road update and maintenance
o Flood and riverbank strengthening and
protection
o Irrigation management
o Agriculture commercialization and value
chain development
33
INTERNAL. This information is accessible to ADB Ma nagement a nd s taff. It may be shared outside ADB with appropriate permission.
Indicative Pipeline: Agriculture, Natural
Resources and Rural Development
Amount
Year Sector/ Project Name
($M)
INTERNAL. This information is accessible to ADB Ma nagement a nd s taff. It may be shared outside ADB with appropriate permission.
Indicative Pipeline: Agriculture, Natural
Resources and Rural Development
Amount
Year Sector/ Project Name
($M)
2023 Flood and Riverbank Management (SDP) including Aricha to Chauhali - 250.0
Standby
Pipeline Total in 2023 (excluding 2 standby projects) 250.0
2024 Ganges–Kobadak Irrigation Project (from Standby) 180.0
2024 Flood and Riverbank Management (SDP) including Aricha to Chauhali 250.0
(from Standby)
2024 Climate and Disaster Resilience in Southwest Coastal Region 70.0
2024 Integrated Water Resources and Flood Management Sector Project – 300.0
Standby
Pipeline Total in 2024 (excluding 1 standby project) 500.0
INTERNAL. This information is accessible to ADB Ma nagement a nd s taff. It may be shared outside ADB with appropriate permission.
Finance and Public Sector
Management
o Public private partnership support
o SMEs development
o Public financial management
o Banking sector strengthening
36
INTERNAL. This information is accessible to ADB Ma nagement a nd s taff. It may be shared outside ADB with appropriate permission.
Indicative Pipeline: Finance and Public Sector
Management
Amount
Year Sector/ Project Name
($M)
37
INTERNAL. This information is accessible to ADB Ma nagement a nd s taff. It may be shared outside ADB with appropriate permission.
Indicative Pipeline: Finance and Public Sector
Management
Amount
Year Sector/ Project Name
($M)
2024 Economic Zone Development Program (with OPPP support) 150.0
38
INTERNAL. This information is accessible to ADB Ma nagement a nd s taff. It may be shared outside ADB with appropriate permission.