REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS & HIGHWAYS


REGION IV-A
QUEZON 2ND DISTRICT ENGINEERING OFFICE
LUCENA CITY

C.Y. 2021 PROJECT


DETAILED ENGINEERING DESIGN PLAN FOR THE
LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM,
BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/
FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDING
(BARANGAY HALL) BARANGAY ISABANG, LUCENA CITY, QUEZON

SUBMITTED: RECOMMENDED: APPROVED:

FAUSTINO MARK ANTHONY S. DE LA CRUZ MA. CHYMBELIN D. IBAL ROGELIO S. CRESPO


CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
DATE: DATE:
DATE:
TABLE OF CONTENTS REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE BUILDING OFFICIAL
TITLE PAGE
G-1 COVER PAGE

ARCHITECTURAL
A-1 PERSPECTIVE DISTRICT / CITY / MUNICIPALITY
TABLE OF CONTENTS
SUMMARY OF QUANTITIES
SITE DEVELOPMENT PLAN
LOCATION & VICINITY MAP

A-2 GROUND FLOOR PLAN


SECOND FLOOR PLAN
ROOF PLAN
GROUND FLOOR REFLECTED CEILING PLAN
SECOND FLOOR REFLECTED CEILING PLAN
PROJECT SITE FRONT & RIGHT SIDE ELEVATION
REAR & LEFT SIDE ELEVATION
RAMP PLAN & SECTION DETAIL LAND USE & ZONING
TYPICAL TOILET DETAIL
SIGNAGE DETAIL

A-3 SCHEDULE OF DOORS & WINDOWS


STAIR DETAIL & WINDOWSILL DETAIL
CANOPY DETAIL & RAILING 1 & 2 DETAIL
N TYPICAL ARCHITRAVE & KEYSTONE DETAIL
DETAIL OF MOLDING 1, 2 & 3
3 VICINITY MAP W E
CROSS SECTION
LONGITUDINAL SECTION
A-1 SCALE NTS
S A-4 FIELD OFFICE DETAIL
LINE & GRADE
A-5 PROJECT BILL BOARD DETAIL

A-6 SANITATION TENT PLAN


SUMMARY OF QUANTITIES
STRUCTURAL
S-1 GENERAL CONSTRUCTION NOTES

PERSPECTIVE
S-2 GENERAL CONSTRUCTION NOTES

S-3 FOUNDATION PLAN ARCHITECTURAL


SECOND FLOOR FRAMING PLAN
ROOF FRAMING PLAN

S-4 RC FOOTING SCHEDULE


N TYPICAL FOOTING DETAIL, DETAIL OF BEAM
SCHEDULE OF BEAMS, COLUMN & RC SLAB
WALL FOOTING DETAIL
W E
S-5 ENDWALL DETAIL
S STAIR DETAIL, ROOFING FIXER
J-BOLT SPACING
ROOF PANEL SIDE LAP DETAIL
ISOMETRIC VIEW OF CONNECTION OF
STRUCTURAL
ROOFING TO PURLINS

S-6 DETAIL ELEVATION OF TRUSS 1


REFERENCE WELD DETAIL

S-7 SPOT DETAIL OF TRUSS


DETAIL OF TRUSS ANCHORAGE & PURLIN
CONNECTION DETAILS

E L E C T R I C A L
E-1 ELECTRICAL NOTES
ELECTRICAL LEGENDS & SYMBOL
SANITARY
SPECIFICATION
ELECTRICAL RISER DIAGRAM
SINGLE LINE DIAGRAM
LOAD SCHEDULE
GROUND FLOOR LIGHTING LAYOUT
SECOND FLOOR LIGHTING LAYOUT
GROUND FLOOR POWER LAYOUT
SECOND FLOOR POWER LAYOUT

PROJECT SITE P L U M B I N G
P-1 PLUMBING NOTES & LEGENDS
ELECTRICAL
GROUND FLOOR SEWER LINE LAYOUT
SECOND FLOOR SEWER LINE LAYOUT
SEWER LINE ISOMETRIC DIAGRAM
GROUND FLOOR WATER LINE LAYOUT
SECOND FLOOR WATER LINE LAYOUT
WATER LINE ISOMETRIC DIAGRAM
SEPTIC TANK DETAIL

1 SITE DEVELOPMENT PLAN 2 LOCATION MAP P-2 CATCH BASIN DETAIL


GROUND FLOOR DRAINAGE LAYOUT
A-1 SCALE 1:500 MTS A-1 SCALE NTS SECOND FLOOR DRAINAGE LAYOUT
ROOF DRAINAGE LINE LAYOUT
DRAINAGE LINE ISOMETRIC DIAGRAM
MECHANICAL
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED:
REPUBLIC OF THE PHILIPPINES
REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
C.Y. 2021 PROJECT PERSPECTIVE
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR THE SITE DEVELOPMENT PLAN CESAR ANTONIO P. JADER
REGION IV-A LOCATION MAP ARCHITECT II
LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, VICINITY MAP CHARLOTTE KAYE A. A 2
QUEZON II DISTRICT ENGINEERING OFFICE BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, SUMMARY OF QUATITIES PREPARED:
CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ MA. CHYMBELIN D. IBAL ROGELIO S. CRESPO
LUCENA CITY CONSTRUCTION OF MULTI-PURPOSE BUILDING ( BARANGAY HALL ) TABLE OF QUANTITIES
ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 2 7 17
BARANGAY ISABANG, LUCENA CITY, QUEZON JIM PAUL K. ABRIL SECTION
ENGINEER II DATE: DATE: DATE: DATE:
A A' B B' C A A' B B' C A A' B B' C A A' B B' C A A' B B' C
7000
3500 1750 1750

W W
1 1
1 1 1 1 1
W W W W
3 3 3 3
W W STORAGE 2 TOILET 2
STORAGE 1 TOILET 1

2250
1 STORAGE 1 TOILET 1 1 STORAGE 2 TOILET 2

SESSION
SESSION

4500
ROOM
D D ROOM D D
OFFICE OF THE W
5 5 5 5 OFFICE OF THE
SK CHAIRMAN 4
W PANTRY W W SK CHAIRMAN PANTRY

2250
HALLWAY
1 D 1 HALLWAY 1
SERVICE D
4 3 D
DOOR D
3

9000
2 D D
2 2
DOWN 2 2 2
SLIDE SLIDE
3 6
W W W
1 UTILITY 1 1 UTILITY
BARANGAY ROOM ROOM
STAIRWELL
BARANGAY
COMMITTEE AREA OFFICE OF THE
OPEN
COMMITTEE INFORMATION / BRGY. CHAIRMAN
OFFICE OF THE

4500

4500
INFORMATION / BELOW
AREA WAITING AREA
WAITING AREA BRGY. CHAIRMAN

W W W
1 1 1
UP D
1
3 D
3 3 3 3
W W W W
1

1500

1500
RAMP 1 1 2 2
UP

4 4 4 4 4
2250 2500 2250
UP

GROUND FLOOR SECOND FLOOR


1 GROUND FLOOR PLAN 2 SECOND FLOOR PLAN 3 ROOF PLAN 4 REFLECTED CEILING PLAN 5 REFLECTED CEILING PLAN
A-2 SCALE 1:100 MTS A-2 SCALE 1:100 MTS A-2 SCALE 1:100 MTS A-2 SCALE 1:100 MTS A-2 SCALE 1:100 MTS

A A' B B' C 4 3 2 1 C B' B A' A 1 2 3 4

SEE MOLDING-3
DETAIL
SEE MOLDING-2
DETAIL

SEE CANOPY
DETAIL

6 FRONT ELEVATION 7 RIGHT SIDE ELEVATION 8 REAR ELEVATION 9 LEFT SIDE ELEVATION
A-2 SCALE 1:100 MTS A-2 SCALE 1:100 MTS C 1
A-2 SCALE 1:100 MTS A-2 SCALE 1:100 MTS

300mm X 300
UNGLAZED W
FLOOR TILE FIN. 3

A STAINLESS STEEL A' A' A A'


STAINLESS STEEL 250mm HIGH, 25mm THK CONCRETE
SCHEDULE OF FINISHES:
GRAB RAIL 300mm X 300
STAINLESS STEEL GRAB RAIL 1 GLAZED WALL SIGNAGE LETTERING
GRAB RAIL
TILE FIN. FONT STYLE: TIMES NEW ROMAN
W
1 FLOOR FINISH:
400X400mm GLAZED FLOOR TILE FINISH
3 (SIZE & COLOR FOR APPROVAL BY THE END USER)

A PLAIN CEMENT FINISH


(COLOR FOR APPROVAL BY THE END USER)

RAMP
UP WALL FINISH:
150mm THK CHB EXTERIOR WALL
D
B 7 W/ PLAIN CEMENT PLASTER PAINTED FINISH
(COLOR FOR APPROVAL BY THE END USER)
P L A N T B O X 4 100mm THK CHB EXTERIOR WALL
W/ PLAIN CEMENT PLASTER PAINTED FINISH
(COLOR FOR APPROVAL BY THE END USER)

PLAN SECTION A 14 SIGNAGE DETAIL CEILING FINISH:


A-2
RAMP PLAN DETAIL
SCALE 1:30 MTS FIBER CEMENT BOARD ON METAL
10 11 RAMP SECTION B 12 RAMP SECTION A 13 TYPICAL TOILET DETAIL FURRING FRAME W/ PAINT FINISH
A-2 SCALE 1:50 MTS
A-2 SCALE 1:50 MTS A-2 SCALE 1:50 MTS A-2 SCALE 1:50 MTS
EXPOSED UNDERSLAB W/ PAINT FINISH

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED:


REPUBLIC OF THE PHILIPPINES
REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
C.Y. 2021 PROJECT GROUND FLOOR PLAN
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR THE CESAR ANTONIO P. JADER
SECOND FLOOR PLAN
REGION IV-A ARCHITECT II
ROOF PLAN
LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, CHARLOTTE KAYE A. A 3
QUEZON II DISTRICT ENGINEERING OFFICE
GROUND & SECOND FLOOR REFLECTED CEILING PLAN
PREPARED:
BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, FRONT, RIGHT SIDE, REAR & LEFT SIDE ELEVATION CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ MA. CHYMBELIN D. IBAL ROGELIO S. CRESPO
LUCENA CITY CONSTRUCTION OF MULTI-PURPOSE BUILDING ( BARANGAY HALL ) RAMP PLAN & SECTION DETAIL, TYPICAL TOILET DETAIL
SIGNAGE DETAIL
ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 3 7 17
BARANGAY ISABANG, LUCENA CITY, QUEZON JIM PAUL K. ABRIL SECTION
ENGINEER II DATE: DATE: DATE: DATE:
TYPICAL DETAIL OF DETAIL OF
9 KEYSTONE 10 MOLDING-1
A-3 SCALE 1:10 MTS A-3 SCALE 1:15 MTS

DOUBLE-LEAF MULTI ACTION SWING WOODEN DOUBLE MULTI ACTION SLIDING GLASS DOOR W/ 12mm THK. SINGLE-LEAF MULTI ACTION SWING GLASS SINGLE-LEAF SWING MARINE SINGLE-LEAF SWING MARINE SINGLE-LEAF SWING MARINE
D PANEL DOOR W/ 6mm THK. TEMPERED GLASS D TINTED TEMPERED GLASS & 6mm THK. TINTED FIXED D DOOR W/ 6mm THK. TEMPERED GLASS ON D PLYWOOD FLUSH DOOR D PLYWOOD FLUSH DOOR D PLYWOOD FLUSH DOOR
1 2 3 POWDER COATED ALUMINUM FRAME (3 SETS) 4 5 6
(2 SETS) GLASS ON POWDER COATED ALUMINUM FRAME (1 SET) (4 SETS) (1 SET)
(1 SET)

1 SCHEDULE OF DOORS
A-3 SCALE 1:30 MTS
A A' B B' C

FRONT VIEW SIDE VIEW SEE MOLDING-1


SLIDE SLIDE DETAIL

4 WINDOWSILL DETAIL OFFICE OF THE


BRGY. CHAIRMAN HALLWAY
A-3 SCALE 1:10 MTS
POWDER COATED ON ALUM. FRAME POWDER COATED ON ALUM. FRAME POWDER COATED ON ALUM. FRAME POWDER COATED ON ALUM. FRAME
W CASEMENT AND FIXED TYPE GLASS W CASEMENT AND FIXED TYPE GLASS W AWNING TYPE GLASS WINDOW W AWNING TYPE GLASS WINDOW
1 WINDOW W/ 6mm THK. BROWN GLASS 2 WINDOW W/ 6mm THK. BROWN GLASS 3 W/ 6mm THK. BROWN GLASS 4 W/ 6mm THK. BROWN GLASS
(15 SETS) (2 SETS) (4 SETS) (1 SETS) BARANGAY
DETAIL OF COMMITTEE

2 SCHEDULE OF WINDOWS 11 MOLDING-2


AREA
UTILITY
A-3 SCALE 1:30 MTS
A-3 SCALE 1:10 MTS
PANTRY ROOM

B' C
13 CROSS SECTION
A-3 SCALE 1:100 MTS
C
2
4 3 2 1
DOWN
15 SPOT DETAIL
A-3 SCALE 1:15 MTS
2 3
W
1
50mmØ G.I. PIPE NEWEL POST
S E E T R U S S D E T A I L
50mmØ G.I. PIPE HANDRAILS TYPICAL
OPEN
BELOW
25mmØ G.I. PIPE INT. HANDRAILS
5 CANOPY DETAIL 6 ARCHITRAVE DETAIL
A-3 SCALE 1:25 MTS A-3 SCALE 1:25 MTS DETAIL OF
12 MOLDING-3
A-3 SCALE 1:10 MTS
TOILET 2
W
1
HALLWAY

W SEE SPOT DETAIL


2
3
TOILET 1

INFORMATION / UTILITY ROOM


WAITING AREA

PLAN SECTION A
3 STAIR DETAIL 7 RAILING-1 DETAIL 8 RAILING-2 DETAIL 14 LONGITUDINAL SECTION
A-3 SCALE 1:50 MTS A-3 SCALE 1:25 MTS A-3 SCALE 1:25 MTS A-3 SCALE 1:100 MTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED:


REPUBLIC OF THE PHILIPPINES
REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
C.Y. 2021 PROJECT SCHEDULE OF DOORS & WINDOWS
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR THE CESAR ANTONIO P. JADER
REGION IV-A STAIR DETAIL, WINDOWSILL DETAIL
ARCHITECT II
CANOPY DETAIL, TYPICAL ARCHITRAVE DETAIL
LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, CHARLOTTE KAYE A. A 4
QUEZON II DISTRICT ENGINEERING OFFICE BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES,
RAILING 1 & 2 DETAIL
TYPICAL DETAIL OF KEYSTONE
PREPARED:
CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ MA. CHYMBELIN D. IBAL ROGELIO S. CRESPO
LUCENA CITY CONSTRUCTION OF MULTI-PURPOSE BUILDING ( BARANGAY HALL ) DETAIL OF MOLDING 1, 2 & 3 ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 4 7 17
BARANGAY ISABANG, LUCENA CITY, QUEZON CROSS & LONGITUDINAL SECTION JIM PAUL K. ABRIL SECTION
ENGINEER II DATE: DATE: DATE: DATE:
W W W
1 2 1

D
1

3 FRONT ELEVATION 4 RIGHT SIDE ELEVATION 5 REAR ELEVATION 6 LEFT SIDE ELEVATION
A-4 SCALE 1:150MTS A-4 SCALE 1:150MTS A-4 SCALE 1:150MTS A-4 SCALE 1:150MTS

W
1

P E R S P E C T I V E 2

D W
1 1

1 FLOOR PLAN
GENERAL NOTES: A-4 SCALE 1:75MTS D-1 W-1 W-2

1. ALL PLUMBING WORKS INCLUDED HEREIN SHALL BE EXECUTED ACCORDING TO THE


PROVISIONS OF THE PHILIPPINE PLUMBING CODE, THE NATIONAL BUILDING
CODE, AND THE RULES AND REGULATIONS OF THE LOCAL GOVERNMENT.
2. COORDINATE THE DRAWING WITH OTHER RELATED DRAWINGS AND SPECIFICATIONS. PLAN 9 SCHEDULE OF DOOR & WINDOWS
THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCY FOUND A-4 SCALE 1:100MTS
HEREIN.
3. ALL PIPES SHALL BE INSTALLED AS INDICATED ON PLANS. ANY RELOCATIONS 11 ROOF FRAMING PLAN
REQUIRED FOR PROPER EXECUTION ON OTHER TRADES SHALL BE WITH PRIOR A-4 SCALE 1:150MTS
APPROVAL OF THE ARCHITECT OR ENGINEER.
4. PROPOSED SANITARY UTILITIES SHALL CONFORM TO THE ACTUAL LOCATION DEPTHS
a b
AND INVERT ELEVATIONS OF ALL EXISTING PIPES AND STRUCTURES VERIFIED BY
THE CONTRACTOR.
20W 20W
5. ALL SLOPES FOR HORIZONTAL DRAINAGE SHALL MAINTAIN 0.5% MINIMUM UNLESS
OTHERWISE SPECIFIED.
Sab
6. SIZES OF WATER SUPPLY PIPES TO FIXTURES SHALL BE IN ACCORDANCE WITH THE
MANUFACTURERS INSTRUCTIONS.
7. THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES AT SITE AND COORDINATE 2 ROOF PLAN 14 ELECTRICAL LAYOUT
THE WORKS WITH THE SEWER EFFLUENT DISPOSAL POINT AND WATER LINE SERVICE A-4 SCALE 1:150MTS A-4 SCALE 1:150MTS
CONNECTING POINT.
8. ALL PIPE SIZES ARE IN MILLIMETERS AND ALL DIMENSIONS ARE IN METERS UNLESS
OTHERWISE SPECIFIED.

LEGEND & SYMBOLS: SECTION

1-40 WATTS,
FLOURESCENT LAMP 12 DET. SEC. OF WALL FTG. (WF) 13 DET. OF PEDESTAL FOOTING (PF) LPP
SP/WP SOIL PIPE/ WASTE PIPE
A-4 SCALE 1:50MTS A-4 SCALE 1:50MTS
CEILING LIGHT OUTLET DP DRAIN PIPE
VP VENT PIPE
Sa ONE-GANG SWITCH CWL COLD WATER LINE

Sab TWO-GANG SWITCH


GV GATE VALVE 10 FOUNDATION PLAN
CV CHECK VALVE A-4 SCALE 1:150MTS
FC FLEXIBLE CONNECTOR
Sabc THREE-GANG SWITCH
M WATER METER
SS SOIL STACK 15
S2W TWO WAY SWITCH
VS VENT STACK A-4 SCALE NTS

VAC VENT ABOVE CEILING


CONDUIT (FELXIBLE PVC) PANELBOARD LPP
VSTR VENT STACK THRU ROOF
LOAD SCHEDULE POWER SUPPLY : 230V, 60Hz, SINGLE PHASE, LINE TO LINE SERVICE
FCO FLOOR CLEANOUT
CONDUIT (uPVC) NO. OF OUTLET SIZE OF CONDUCTORS AND
CO CLEANOUT CKT NO. LOAD DESCRIPTION VA VOLTS AMPERES PROTECTION CONDUITS
LO CO SW SCO
PANEL BOARD (LPP) FV FLOAT VALVE
WC WATER CLOSET
CONVENIENCE OUTLET LAV LAVATORY
FD FLOOR DRAIN
CIRCUIT HOMERUN AD/CB AREA DRAIN/CATCH BASIN
F FAUCET
TB TUB DRAIN
KILOWATT-HOUR METER KS KITCHEN SINK

SERVICE ENTRANCE
DS DOWN SPOUT 8 SEC. DET. OF WINDOW 7 DETAIL OF RAFTER TRUSS (5-SETS)
PVC POLYVINYL CHLORIDE A-4 SCALE 1:150MTS
CB CATCH BASIN
A-4 SCALE 1:50MTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED:


REPUBLIC OF THE PHILIPPINES
REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
C.Y. 2021 PROJECT FIELD OFFICE DETAIL
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR THE CESAR ANTONIO P. JADER
REGION IV-A ARCHITECT II
LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, CHARLOTTE KAYE A. A 5
QUEZON II DISTRICT ENGINEERING OFFICE BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES,
PREPARED:
CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ MA. CHYMBELIN D. IBAL ROGELIO S. CRESPO
LUCENA CITY CONSTRUCTION OF MULTI-PURPOSE BUILDING ( BARANGAY HALL ) ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 5 7 17
BARANGAY ISABANG, LUCENA CITY, QUEZON JIM PAUL K. ABRIL SECTION
ENGINEER II DATE: DATE: DATE: DATE:
1 DPWH STANDARD PROJECT BILL BOARD
A-5 SCALE NTS

OPTION 1 OPTION 2
2 BILLBOARD ORIENTATION 3 TYPICAL FARM ELEVATION 4 FRONT ELEVATION 5 FRONT ELEVATION
A-5 SCALE NTS A-5 SCALE NTS A-5 SCALE NTS A-5 SCALE NTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED:


REPUBLIC OF THE PHILIPPINES
REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
C.Y. 2021 PROJECT PROJECT BILL BOARD DETAIL
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR THE CESAR ANTONIO P. JADER
REGION IV-A ARCHITECT II
LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, CHARLOTTE KAYE A. A 6
QUEZON II DISTRICT ENGINEERING OFFICE BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES,
PREPARED:
CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ MA. CHYMBELIN D. IBAL ROGELIO S. CRESPO
LUCENA CITY CONSTRUCTION OF MULTI-PURPOSE BUILDING ( BARANGAY HALL ) ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 6 7 17
BARANGAY ISABANG, LUCENA CITY, QUEZON JIM PAUL K. ABRIL SECTION
ENGINEER II DATE: DATE: DATE: DATE:
1 PERSPECTIVE
A-6 SCALE NTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED:


REPUBLIC OF THE PHILIPPINES
REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
C.Y. 2021 PROJECT SANITATION TENT PLAN
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR THE CESAR ANTONIO P. JADER
REGION IV-A ARCHITECT II
LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, CHARLOTTE KAYE A. A 7
QUEZON II DISTRICT ENGINEERING OFFICE BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES,
PREPARED:
CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ MA. CHYMBELIN D. IBAL ROGELIO S. CRESPO
LUCENA CITY CONSTRUCTION OF MULTI-PURPOSE BUILDING ( BARANGAY HALL ) ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 7 7 17
BARANGAY ISABANG, LUCENA CITY, QUEZON JIM PAUL K. ABRIL SECTION
ENGINEER II DATE: DATE: DATE: DATE:
GENERAL CONSTRUCTION NOTES
GENERAL NOTES NOTES ON CONCRETE MIXES & PLACING
1. ALL CONCRETE SHALL DEVELOP A\ MIN. COMPRESSIVE STRENGTH AT THE END OF TWENTY EIGHT 3. IF SLABS AR E REINFORCED BOTHWAYS BARS ALONG THE SHORTER SPAN SHALL BE PLACED
1.0 STANDARDS AND REFERENCES
(28) DAYS W/ CORRESPONDING MAXIMUM SIZE AGGREGATE & SLUMP AS FOLLOWS. BELOW THOSE ALONE THE LONG SPAN AT THE CENTER AND OVER THE LONGER SPAN FOR
THE FOLLOWING SHALL GOVERN THE DESIGN FABRICATION AND CONSTRUCTION OF THE PROJECT.
MAX. SIZE OF REINFORCING BARS NEAR THE SUPPORTS. THE SPACING OF THE BARS AT THE COLUMN STRIPS
1.1 NATIONAL STRUCTURAL CODE OF THE \ PHILIPPINES (N.S.C.P 2015) VOL. 1, SEVENTH EDITION. 28 DAYS STRENGTH MAX SLUMP
LOCATION AGGREGATE SHALL NOT BE MORE THAN ONE AND A\ HALF (1 12 ) SLAB THICKNESS.
2.0 DESIGN CRITERIA ALL OTHERS, INCLUDING 20 mm 100mm 4. TEMPERATURE BARS FOR SLAB SHALL BE GENERALLY PLACED NEAR THE FACE IN TENSION AND
4000 PSI (27.6 MPa)
2.1 LOADINGS SHALL NOT BE LESS THAN 0.0025 X\ GROSS-SECTIONAL AREA (Ag) OF THE SLAB.

CONF. REINF.
SUSPENDED SLABS JOINT HOOP SPACE @ "2Sh" WHEN
4000 PSI (27.6 MPa) 20 mm 100mm SEE SCHEDULE BELOW)
A. DEAD LOAD COLUMNS THERE ARE BEAMS HAVING WIDTH OF
4000 PSI (27.6 MPa) 20 mm 100mm
23.56 kN/m3 BEAMS AT LEAST ONE-HALF THE COLUMN

D JOINT REINF. D
CONCRETE
2500 PSI (17.5 MPa) 20 mm 100mm WIDTH &\ DEPTHS NOT LESS THAN
STEEL 76.93 kN/m3 SLAB ON FILL SCHEDULE OF MINIMUM SLAB REINFORCEMENT
THREE QUARTERS OF THE DEEPEST
150 CHB WALL 3.11 kPa 2. MAINTAIN MINIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS. MINIMUM TEMPERATURE BARS
BEAM THAT FRAME INTO FOUR

CONF. REINF.
100 CHB WALL 2.98 kPa SUSPENDED SLABS 20mm 100 mm 10 mm ø @ 250 mm EACH WAY SIDES OF THE COLUMN. ALL OTHER
SLAB ON GRADE 40mm 125 mm 10 mm ø @ 250 mm EACH WAY CONDITIONS USE HOOPS @ "Sh" CENTERS.
B. LIVE LOAD
25mm

Sh
WALLS ABOVE THE GRADE
ROOF DECK 1.90 kPa 150 mm 10 mm ø @ 250 mm EACH WAY
BEAM STIRRUPS AND COLUMN TIES 40mm
OFFICE 2.40 kPa

COLUMN TIES AS
175 mm 10 mm ø @ 250 mm EACH WAY

PER SCHEDULE
WHERE CONCRETE IS EXPOSED TO FOR COL. BAR SPLICES SEE TABLE
TOILETS 1.90 kPa 200 mm 10 mm ø @ 250 mm EACH WAY
CORRIDORS ABOVE, STAIRS 3.80 kPa EARTH BUT POURED AGAINST FORMS 50mm OF MIN. LAP SPLICE LENGTH OF
WHERE CONCRETE IS DEPOSITED COLUMN REINFORCEMENT
CORRIDORS ON GROUND 4.80 kPa 5. UNLESS OTHERWISE NOTED IN THE PLANS ALL BEDDED SLABS SHALL BE REINFORCED WITH 10 mm ø
DIRECTLY AGAINST EARTH 75mm
AT 250mm O.C. EACH WAY TO CENTER OF SLAB AND CONSTRUCTION JOINTS FOR SAME SHALL

CONF. REINF.
C. WIND LOAD
NOT BE LESS THAN 3.65 METER APART.
BUILDING CATEGORY = 1 (ESSENTIAL FACILITIES)

Sh
3. CONCRETE SHALL BE DEPOSITED IN ITS FINAL POSISITON WITHOUT SEGREGATION. RE-HANDLING

D
(URBAN OR SUBURBAN AREAS WITH OR PLACING SHALL BE DONE PREFERABLY WITH BUGGIES , BUCKETS OR WHEELBARROWS, 6. PROVIDE EXTRA REINFORCEMENTS FOR CORNER SLAB ( TWO ADJACENT DISCONTINUOES EDGES) NOTE:
EXPOSURE CAT.

D JOINT REINF.
B NUMEROUS CLOSELY SPACED OBSTRUCTIONS) NO CHUTES WILL BE ALLOWED EXCEPT TO TRANSFER CONCRETE FROM HOPPERS TO BUIGGIES, AS SHOWN BELOW. ALL CONCRETE REINF. DETAIL SHOULD
BE DONE IN ACCORDANCE WITH ACI
WHEELBARROWS OR BUCKETS IN WHICH CASE THEY SHALL NOT \ EXCEED SIX (6) METERS 7. CONCRETE SLAB REINFORCEMENT BE PROPERLY SUPPORTED WITH 10mm STEEL CHAIR
WIND VELOCITY V=250 KPH DETAILING MANUAL (LATEST EDITION)

CONF. REINF.
IN AGGREGATE LENGTH. OR APPROVED EQUIVALENT SPACED AT 1.0 METER ON CENTER BOTHWAYS.
P = qh [(GCpf)-(GCpi)] (DESIGN WIND PRESSURE) 4. NO DEPOSITING OF CONCRETE SHALL BE ALLOWED WITHOUT THE USE OF VIBRATORS UNLESS
WHERE: qh = VELOCITY PRESSURE (kPa) AUTHORIZED IN WRITING DESIGNER AND ONLY FOR UNUSUAL CONDITIONS WHERE VIBRATIONS
ø12x1000 LONG AT
GCpf = EXTERNAL PRESSURE COFFECIENT ARE EXTREMELY DIFFICULT TO ACCOMPLISH. MID-DEPTH OF SLAB
GCpf = INTERNAL PRESSURE COFFECIENT 5. ALL ANCHOR BOLTS, DOWELS, AND OTHER INSERTS SHALL BE PROPERLY POSITIONED & SECURED TYPICAL COLUMN ELEV. SHOWING
D. SEISMIC LOAD DOWN INTO EDGE BEAM. EXTENDED
IN PLACE PRIOR TO PLACING OF CONCRETE.
4- ø12 @ 1800 LONG TOP BARS BEND AT EACH CORNER DOWELS AND TIES SPACING
Cvl 6. ALL CONCRETE SHALL BE KEPT MOST FOR A MINIMUM OF SEVEN CONSECUTIVE DAYS IMMEDIATELY BARS MIN. OF 1,200 (4'-0") INTO BARS. 1- ø12 TOP &
V= W DESIGN BASE SHEAR) BOTT. BARS
RT AFTER POURING BY THE USE O\ WET BURLAP, FOG SPRAYING, CURING COMPOUNDS OR OTHER
APPROVED METHODS. 4- ø12 BOTT BARS
2.50CaI
Vmax = W Vmin = 0.11 CalW

400
RT 7. STRIPPING OF FORMS AND SHORES: LAP SPLICE LENGTH:
0.80 ZNvI
Vmin = W ZONE 4) FOUNDATION 24 HOURS AT ANY LEVEL NO MORE THAN
R

0
SLAB 38mm ALTERNATE BARS SHOULD BE

60
SUSPENDED SLAB EXCEPT WHEN 8 \ DAYS
WHERE: W =\ TOTAL DEAD LOAD OPENING CLEAR SPLICED. MIN. DISTANCE BET.
ADDITIONAL LOADS ARE IMPOSED

0
60
T = NATURAL PERIOD = Ct (h) 21 DAYS TWO ADJACENT BARS SPLICES
WALLS
SHALL BE 600mm.

H (CLEAR HEIGHT OF COL.)


WHERE: C\ = NUMERICAL COEFFICIENT 14 DAYS

400
BEAMS
h = BUILDING HEIGHT 21 DAYS L
COLUMNS
I = IMPORTANCE FACTOR = 1.00
IN TWO WAY SLAB EXTEND

WITHIN CENTER
8. THE CONTRACTOR SHALL SUBMIT THE SCHEDULE OF POURING AND THE LOCATION OF THE

HALF OF "H"
R =NUMERICAL FACTOR = 8.50 BARS UP TO BEAM SUPPORT

60
SEISMIC COEFFICIENT Cv = 0.44 Nv CONSTRUCTION JOINTS TO THE STRUCTURAL ENGINEER AT LEAST (4) DAYS PRIOR TO THE 0.25L

0
POURING FOR APPROVAL. OMIT TRIMMER BARS WHERE
Ca = 0.64 Nv OPENING IS FRAMED BY BEAM TOP BARS @ SUPPORT (CONT.)
NEAR SOURCE FACTOR (5 km) Nv = 1.0 9. THE CONTRACTOR SHALL FURNISH AND MAITAIN ADEQUATE FORMS AND SHORINGS UNTIL THE TYPICAL CORNER SLAB DETAIL REQ'D. BOTT. BARS @ SUPPORT
Na = 1.0 CONCRETE MEMBERS HAVE ATTAINED THEIR WORKING CONDITION AND STRENGTH. TYPICAL SLAB

JT. REINF.
Z = SEISMIC ZONE = 0.40 (ZONE 4) OPENING DET.

CONF. REINF. TIES LAT. TIES


S = SOIL TYPE = D
NOTES ON FOOTINGS
2.2 DESIGN STRESSES 1. FOOTINGS ARE DESIGNED FOR AN ALLOWANCE SOIL BEARING PRESSURE OF 96 KPa (2000psf).
NOTES ON COLUMNS 0.165L SPLICE
BOTTOM BARS
A. CONCRETE COMPRESSIVE STRENGTH @ 28 DAYS: CONTRACTOR SHALL REPORT TO THE ENGINEER, IN WRITING ,THE ACTUAL SOIL CONDITIONS AT MID SPAN
a. FOOTINGS, COLUMNS, BEAMS AND SLABS f'c = 20.7 MPa (3,000 psi) UNCOVERED AND CONFIRM ACTUAL BEARING CAPACITY OF SOIL BEFORE DEPOSITING CONCRETE. 1. PROVIDE EXTRA SETS OF TIES AT 100 O.C. FOR TIED COLUMN REINFORCEMENT ABOVE EXTRA TOP BARS
0.22L
2. FOOTING SHALL REST AT LEAST 1500mm BELOW NATURAL GRADE LINE UNLESS \ OTHERWISE @ SUPPORT
b. SLAB ON FILL f'c =17.5 MPa (2,500 psi) AND BELOW BEAM-COLUMN CONNECTIONS FOR A DISTANCE FROM FACE OF CONNECTION
C. SLAB f'c = 20.7 MPa (3,000 psi) INDICATED IN PLANS. NO FOOTING SHALL REST ON FILL EQUAL TO GREATER OF THE OVERALL THICKNESS OF COLUMN, 1/6 THE CLEAR HEIGHT OF
3. MINIMUM CONCRETE PROTECTION FOR REINFORCEMENT SHALL BE 75mm CLEAR FOR CONCRETE. COLUMN OR 450mm.
B. REINFORCING STEEL BARS
4. IN CASES WHERE THE SOIL CONDITION IS SUCH THAT THE MINIMUM ALLOWABLE SOIL PRESSURE
a. FOR BARS 16mm AND GREATER (INTERMEDIATE GRADE DEFORMED BAR) fy = 414 MPa (60,000 psi) 2. COLUMN TIES SHALL BE PROTECTED EVERYWHERE BY A COVERING OF CONCRETE CAST
OF 96KPa (2000 psf) CAN NOT BE ATTAINED AT A\ PRACTICAL DEPTHS THE USE OF MICROPILES , TYP. DETAIL OF COL. LAP SPLICE
b. FOR BARS LESS THAN 16mm (STRUCTURAL GRADE DEFORMED BAR) fy = 275 MPa (40,000 psi) MONOLITHICALLY WIT HTHE CORE WITH A\ MINIMUM THICKNESS OF 40mm AND NOT LESS
C. STRUCTURAL STEEL ASTM-A36
BORED PILES, OR DRIVEN PILES MAY BE ADOPTED IN LIEU OF STANDARD ISOLATED FOOTINGS.
THAN 40 TIMES THE MAXIMUM SIZE OF COARSE AGGREGATE IN MILLIMETERS.
& EXT. GIRDER TO COL. CONNECT.
FOR TRUSSES, BRACINGS , & STRUTS fy = 248 MPa (36,000 psi) 3. WHERE COLUMNS CHANGE IN SIZE ,VERTICAL REINFORCEMENT SHALL BE OFFSET AT A
D. MASONRY UNIT (CHB) SLOPE MONOLITHICALLY WITH THE CORE WITH MINIMUM THICKNESS OF 40mm AND
NON -LOADING BEARING CHB WALLS fm' = 3.45 MPa (500 psi) NOTES ON REINFORCEMENT NOT LESS THAN 40 TIMES THE MAXIMUM SIZE COARSE AGGREGATE IN MILLIMETERS
E. WELDS E 60XX ELECTRODE
F. STRUCTURAL BOLTS ASTM- A307 a. Ft = 96.60 mPa (14, 000 psi)
1. UNLESS OTHERWISE NOTED IN PLANS, THE YIELD \ STRENGTH OF REINFORCING BARS SHALL BE: 4. UNLESS OTHERWISE INDICATED IN THE PLANS, LAP SPLICES FOR VERTICAL COLUMN NOTES ON BEAMS AND GIRDERS
A. FOOTINGS , FOOTING BEAMS AND GIRDERS fy = 414 MPa ( 60,000 psi )
REINFORCEMENT SHALL BE MADE WITHIN THE CENTER HALF OF COLUMN HEIGHT, AND
b. Fv= 69.00 mPa (10, 000 psi)
3.0 IN THE INTERPRETATION OF THE DRAWING, INDICATED DIMENSIONS SHALL GOVERN. B. COLUMNS AND SHEAR WALLS fy = 414 MPa ( 60,000 psi ) 1. UNLESS, OTHERWISE NOTED IN PLANS , CAMBER ALL BEAMS AND GIRDER AT
THE SPLICE LENGTH SHALL BE LESS THAN 40 BAR DIAMETERS. WELDING OR APPROVED
DISTANCES AND SIZES SHALL NOT BE SCALED FOR CONSTRUCTIONS PURPOSES C. BEAMS AND GIRDER fy = 414 MPa ( 60,000 psi ) LEAST 6 mm ø FOR EVERY 4.50 M OF SPAN, EXCEPT CANTILEVERS FOR WHICH
MECHANICAL DEVICES MAY BE USED PROVIDED THAT NOT MORE THAN ALTERNATE BARS
4.0 IN REFERENCES TO OTHER DRAWINGS, SEE ARCHITECTURAL DRAWINGS FOR DEPRESSIONS IN FLOOR D. NON-LOAD BEARING WALL PARTITIONS ,BEDDED SLABS , FLOOR & ROOF SLABS, THE CAMBER SHALL BE AS NOTED IN PLANS OR AS ORDERED BY THE ENGINEER
ARE WELDED OR MECHANICALLY SPLICED AT ANY LEVEL AND THE VERTICAL DISTANCES
PARAPETS ,CATCH BASIN,SIDE WALK fy = 275 MPa ( 40,000 psi ) BUT IN NO CASE LESS THAN 20 mm FOR EVERY 3.0 M\ OF FREE SPAN.
SLABS, OPENINGS IN THE WALLS AND SLABS, INTERIOR PARTITIONS, LOCATIONS OF DRAINS ETC. BETWEEN THESE WELDS OR SPLICES OF ADJACENT BARS IS NOT LESS THAN 600mm.
2. ALL REINFORCING BARS SIZE 10mm OR LARGER SHALL BE DEFORMED IN ACCORDANCE WITH THE ASTM A-706
5.0 IN CASE OF DISCREPANCIES AS TO THE LAYOUT, DIMENSIONS AND ELEVATIONS BETWEEN THE 2. TYPICAL BARS BENDING AND CUTTING DETAILS FOR BEAMS SHALL BE AS
BARS SMALLER THAN 10mm MAY BE PLAIN.
STRUCTURAL PLANS AND ARCHITECTURAL DRAWINGS, THE CONTRACTORS SHALL NOTIFY BOTH THE SHOWN IN FIG. B-1
3. SPLICES SHALL BE SECURELY WIRED TOGETHER & SHALL LAP OR EXTEND IN ACCORDANCE w/ (TABLE B
STRUCTURAL ENGINEER AND ARCHITECTS. TABLE OF LAP SPLICE & ANCHORAGE LENGTH) UNLESS OTHERWISE SHOWNON DRAWINGS , SPLICES SHALL BE H
6.0 ALL CONCRETE WORKS AND CONCRETE REINFORCEMENTS SHALL BE DONE IN ACCORDANCE WITH THE
STAGGERED WHENEVER POSSIBLE.
ACI.318-14M BUILDING CODE REQUIREMENT AND ALL STRUCTURAL STEEL WORKS ACCORDING WITH THE CROSS-TIE
AISC-05 IN SOFAR AS THEY DO NOT CONFLICT WITH THE LOCAL BUILDING CODE REQUIREMENT.
NOTES ON CONCRETE SLABS

350mm. MAX.
L1 L2
7.0 ACI REFERS TO AMERICAN CONCRETE INSTITUTE, AISC REFERS TO AMERICAN INSTITUTE OF STEEL 1
1. ALL SLAB REINFORCEMENTS SHALL BE 20mm CLEAR MINIMUM FROM BOTTOM AND FROM THE TOP OF SLAB.
1
L1 3 L1 3 L2 1 L2 1
CONSTRUCTION AND ASTM REFERS TO AMERICAN SOCIETY FOR TESTING MATERIALS. 3 3
2. UNLESS OTHERWISE SHOWN, REINFORCEMENT IN CONTINUOUS ELEVETED SLAB SHALL BE CUT AS FOLLOWS: 10
8.0 CONSTURCTION NOTES AND TYPICAL DETAILS APPLY TO ALL DRAWINGS UNLESS OTHERWISE SHOWN OR d

H
m
in
NOTED. MODIFY TYPICAL DETAILS AS DIRECTED TO MEET SPECIAL CONDITIONS. .
9.0 SHOP DRAWING WITH ERECTION AND PLACING DIAGRAMS OF ALL STRUCTURAL STEELS, MISCELLANEOUS BENT BAR
IRON, PRE-CAST CONCRETE, ETC. SHALL BE SUBMITTED FOR ENGINEERS APPROVAL BEFORE FABRICATION. L1 L2 1 1 L2 1 L2 1
L1 5 L1 5 5 5
10. CONTRACTOR SHALL NOTE AND PROVIDE ALL MISCELLANEUOS CURBS, SILLS ,STOOLS EQUIPMENT AND L1/4 L1/4 L2/4 TOP BARS
MECHANICAL BASES THAT ARE REQUIRED BY THE ARCHITECTURAL ,ELECTRICAL AND MECHANICAL DRAWINGS. TOP BAR 2-12mmø SIDE BARS WEB BARS
BOTTOM BARS
11. ALL RESULTS OF THE MATERIAL TESTING FOR CONCRETE, REINFORCING BARS & STRUCTURAL STEEL MUST
BE NOTED &\ APPROVED BY THE MATERIALS ENGINEER/STRUCTURAL DESIGNER. FIGURE B-1

BOTTOM BAR

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED:


REPUBLIC OF THE PHILIPPINES
REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
C.Y. 2021 PROJECT GENERAL CONSTRUCTION NOTES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR THE CESAR ANTONIO P. JADER
REGION IV-A ARCHITECT II
LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, CHARLOTTE KAYE A. S 8
QUEZON II DISTRICT ENGINEERING OFFICE BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES,
PREPARED:
CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ MA. CHYMBELIN D. IBAL ROGELIO S. CRESPO
LUCENA CITY CONSTRUCTION OF MULTI-PURPOSE BUILDING ( BARANGAY HALL ) ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 1 7 17
BARANGAY ISABANG, LUCENA CITY, QUEZON JIM PAUL K. ABRIL SECTION
ENGINEER II DATE: DATE: DATE: DATE:
GENERAL CONSTRUCTION NOTES
4- ø16 VERT. BARS

TABLE 'A' TABLE 'B'


REINFORCING CONCRETE LINTEL BEAMS IN NOTES ON STIRUPS
TENSION BARS COMPRESSION BARS CONCRETE BLOCK WALLS SEE CONSTRUCTION NOTES
FOR MASONRY WALL REIN- 4- ø16 VERT. BARS
1. ALL REINFORCEMENT SHALL BE BENT COLD UNLESS

550
TABLE OF LAP SPLICE & ANCHORAGE LENGTH (mm) FORCEMENTS (TYPICAL) OTHERWISE PERMITTED BY THE STRUCTURAL ENGINEER.
TABLE OF LAP SPLICE & NCHORAGE LENGTH (mm)

550
LINTELS IN BLOCK WALLS FIN. FLR. LVL.

600 (MIN.) VARIES


2. AS SHOWN IN THE DESIGN DRAWINGS OR
BAR SIZES fc`= 20.7MPa(3000psi) fc`= 27.6 MPa (4000psi) BAR SIZES fc`= 20.7MPa(3000psi) fc`= 27.6 MPa (4000psi)
PERMITTED BY THE STRUCTURAL ENGINEER.
(DEFORMED MM)
EMBEDMENT LAPPED EMBEDMENT LAPPED
(DEFORMED MM)
EMBEDMENT LAPPED EMBEDMENT LAPPED
CLEAR TOTAL MIN. HEIGHT OF REINFORCEMENT NAT. GRD. LVL.
SPAN LENGTH fc' LINTEL DOWEL BARS TO MATCH 3. TIES & CLOSE STIRRUPS MUST BE AT 135.
Ø10 300 300 300 300 Ø10 225 300 300 L L+0.40M MPa mm BOTTOM TOP STIRRUPS CHB VERTICAL BARS 550 550
300 250
ø10 BOTT. BARS
Ø12 300 300 300 Ø12 275 300 300
@ 300 O.C. 180 DEG. HOOKS

250
ø6mm @ 200 mm

Dbar
1.20 M 1.60 M 200 1- ø10 1- ø10
Ø16 300 400 300 400 Ø16 350 400 325 400 3- ø10 BOTT. BARS TYPICAL CONNECTION DETAIL

D+12db
1.50 M 1.90 M 14.0 200 1- ø10 1- ø10 ø6mm @ 200 mm
350 475 1.80 M 2.20 M 200 1- ø12
OF R.C. WALL AT CORNERS
Ø20 400 550 500 Ø20 450 500 500 1- ø10 ø6mm @ 200 mm

Ø25 600 800 550 750 Ø25 550 625 550 625 400
2.10 M 2.50 M 250 1- ø12 1- ø10 ø6mm @ 200 mm
Ø28 750 1000 650 850 Ø28 625 675 625 675 2.40 M 2.90 M 17.0 250 1- ø12 1- ø10 4db OR 65mm
ø6mm @ 200 mm
Ø32 950 1300 850 1100 Ø32 700 775 700 775 2.70 M 3.10 M 250 1- ø16 1- ø12 ø10mm @ 200 mm
DOWEL TO MATCH
NOTES ON WELDS
90 DEG. HOOKS

Dbar
NOTES: NOTES:
3.00 M 3.40 M 300 1- ø16 1- ø12 ø10mm @ 200 mm CHB VERT. BARS 1. USE E60xx ELECTRODES FOR ALL MEMBERS WELDED.
1. TOP PLAIN BARS, MULTIPLY VALUE BY 2 1. TOP PLAIN BARS, MULTIPLY VALUE BY 2 3.30 M 3.70 M 20.0 300 1- ø16 1- ø12 ø10mm @ 200 mm
2. NOT MORE THAN 33% OF THE BARS SHALL BE 2. NOT MORE THAN 33% OF THE BARS SHALL BE 3.60 M 4.00 M 300 1- ø20 1- ø12 ø10mm @ 200 mm 300 2. WELDS SHALL DEVELOP THE FULL STRENGTH OF MEMBERS JOINED UNLESS
OTHERWISE SHOWN OR DETAILED IN THE DRAWINGS.

L
SPLICED WITHIN THE REQUIRED LAP LENGTH SPLICED WITHIN THE REQUIRED LAP LENGTH (TYP.)

12db
DOWEL
3. VALUES GIVEN ABOVE CAN ALSO BE USED FOR COLUMNS

400
12 THK. EXPANSION JOINT)
FIN. FLR. LVL.
WITH MASTIC FILLER
NOTES ON STRUCTURAL STEEL D

250
1. STRUCTURAL STEEL TO BE USED FOR FABRICATION AND ERECTION OF THIS
3. IF THE BEAM REINFORCING BARS END IN A WALL, THE CLEAR DISTANCE FROM THE BAR TO THE FARTHER FACE OF THE 1- ø16 VERT. BARS 6- ø10 BARS (AS SHOWN) STRUCTURE SHALL COMPLY WITH ALL THE PERTINENT PROVISION OF AISC

DOWEL)
ø10 BOTT. BARS @300 O.C MAIN BAR END HOOKS
WALL IS NOT LESS THAN 25mm. EMBEDMENT LENGTH SHALL BE SHOWN IN A TABLE 'A' FOR TENSION BARS AND TABLE 'B'

400
CHB WALL SPECIFICATION FOR THE DESIGN, FABRICATION AND ERECTION OF STRUCTURAL ALL GRADES
1- ø16 VERT. BARS
FOR COMPRESSION BARS UNLESS UNLESS SPECIFIED IN PLAN. TOP BARS AND SHALL NOT BE SPLICED WITHIN THE FOR SIZE AND SPACING STEEL FOR BUILDING LATEST EDITION. BAR SIZE DIAMETER 180 HOOK 90 HOOK
COLUMN OR TWO STIRRUPS SHALL BE PROVED AT ALL SPLICES. OF HOR. &\ VERT. BARS DEFORMED mm
SEE CONSTRUCTION NOTES. 2. ALL STRUCTURAL STEEL SHAPES SHALL CONFORM TO ASTM A36 STRUCTURAL D+2db L L
FOR SIZE AND SPACING
4. IF THERE ARE TWO OR MORE LAYERS OF REINFORCING BARS, USED 25mm BAR SEPARATORS SPACED AT 1.0M ON OF HOR. & VERT. BARS DOWEL TO MATCH STEEL UNLESS OTHERWISE INDICATED. 10 mm ø 60 75 125 150
SEE CONSTRUCTION NOTES. CHB VERT. BARS
ON CENTER ON NO CASE SHALL THERE BE THAN TWO (2) SEPARATORS BETWEEN LAYERS OF BARS 3. ALL WELDED CONNECTIONS SHALL DEVELOP THE FULL STRENGTH OF THE 12 mm ø
WHERE DEPRESSED 75 100 150 200
CHB WALL MEMBERS CONNECTED.
5. MINIMUM CONCRETE PROTECTION FOR REINFORCING BARS OR STEEL SHAPES SHALL BE AS SHOWN IN FIGURE B-2 300 SLAB OCCURS
16 mm ø 95 125 175 250
(TYP.) 4. UNLESS OTHERWISE SPECIFIED ALL WELDING RODS SHALL CONFORM WITH

DOWEL
UNLESS ELSEWHERE.
CORNER WALL OPENING OR END WALL 20 mm ø 115 150 200 300

400
E60 ELECTRODES.
FIN. FLR. LVL. 5. ALL BOLTS USED UNLESS OTHERWISE SPECIFIED SHALL BE ASTM A 307 BOLTS. 25 mm ø 150 200 230 450

250
28 mm ø 240 300 350 550
MAIN REINFORCEMENT MAIN REINFORCEMENT
CHB WALL R.C. COLUMN OR WALL
6- ø10 BARS (AS SHOWN)
ø10 BOTT. BARS @300 O.C
NOTES ON EMBBED PIPES 32 mm ø 300 335 450 600
t OR 1\/4 D

t OR 1\/4 D
SLEEVES FOR UTILITY 400
SLEEVES FOR UTILITY DOWEL BARS TO MATCH C. THAT PASS THRU BEAMS SHALL NOT
t

1- ø16 VERT BARS


PIPES MAX. 1\/5 D PIPES MAX. 1\/5 D CHB HOR. BARS
EXCEED 100mm IN DIAMETER OR 1/3 BEAM DETPH WHICHEVER IS LESS, UNLESS
D

( EXPANSION JOINT)
WITH MASTIC FILLER
12 THK. EXPANSION JOINT
WITH MASTIC FILLER
TYPICAL CHB FOOTING DETAILS OTHERWISE APPROVED IN WRITING BY THE STRUCTURAL ENGINEER.
PROVIDE 3- ø10 EXTRA STIRR PROVIDE 33- ø10 EXTRA STIRR
EACH SIDE OF SLEEVES EACH SIDE OF SLEEVES ( WHERE APPLICABLE ) 2. NO PIPES SHALL BE ALLOWED TO PASS THRU BEAMS VERTICALLY. 135 DEG. HOOKS

L
3. NO PIPES SHALL BE EMBEDDED IN COLUMNS.

DOWEL
LE
TYP. DET. FOR SLEEVES TYP. DET. FOR SLEEVES

400
THRU CONCRETE BEAM THRU CONCRETE BEAM
FOR SIZE AND SPACING
OF HOR. &\ VERT. BARS NOTES ON CONSTRUCTION JOINTS IN CONCRETE D
400 6d
FIG. B-2 FIG. B-3 SEE CONSTRUCTION NOTES.
DOWEL 1. WHERE A CONSTRUCTION JOINT IS TO BE MADE, THE SURFACE OF CONCRETE b
SHALL BE CLEANED AND ALL LAITANCE AND STANDING WATER REMOVED SHEAR
INTERSECTION WALL INTERSECTINGR.C. COLUMN OR WALL KEY SHALL BE PROVIDE AT THE JOINT. L1

VERIFY DEPRESSION
30 BAR DIA. 30 BAR DIA. L
TYPICAL CONNECTION DETAIL OF MASONRY WALL min. min. MAIN REINFORCEMENTS TO BE
CONTINUOUS (TOP & BOTT. BARS)

D=FOR BEAM
6. WHEN A\ BEAM CROSSES A GIRDER , REST BEAM ON TOP OF GIRDER BARS, BEAM REINFORCING BARS SHALL BE

t=FOR SLAB
SYMMETRICAL ABOUT THE CENTER LINE WHENEVER POSSIBLE. WHERE JOINTS IS AT POINT OF
MAIN REINFORCEMENTS
TO BE CONTINUOUS STRESS, PROVIDE SHEAR RODS
7. GENERALLY, NO SPLICES SHALL BE PERMITTED AT POINTS WHERE CRITICAL BENDING STRESSES OCCUR, SPLICES WITH ENGINEERS APPROVAL STIRRUP AND THE TIE HOOKS
WHERE SO PERMITTED SHALL BE INDICATED IN TABLE 'A' AND 'B'. WELDED SPLICES SHALL DEVELOP IN TENSION AT ALL GRADES
200(MIN) 200(MIN) ø10x1000 LONG
@ 300 O.C. 180 HOOK 90 HOOK
LEAST 125% OF THE SPLICED YIELD STRENGTH OF THE BAR NOT MORE THAN 50% OF THE BARS AT ANY ONE SECTION 30 ø BAR 30 ø BAR BAR SIZE DIAMETER
50 DEFORMED mm
MIN.) MIN.) D+2db L L
IS ALLOWED TO BE SPLICED THEREIN. D=FOR BEAM 40

D/3
ø10 STIRRUPS 2t=FOR SLAB 10 mm ø 40 125 85 100
@ 150 O.C. 30 BAR DIA. (min.)

D/3
t/3 t/3
10 mm ø 50 165 115 115

t/3

D/3
10 mm ø 65 200 140 150
NOTES ON CONCRETE HOLLOW BLOCKS WALLS CHB WALL FOR SIZE AND SPACING TYPICAL DETAIL FOR BEAM SLAB BEAM
OF HOR. & VERT. BARS 10 mm ø 115 300 165 300
1. UNLESS OTHERWISE SHOWN IN PLANS ALL CONCRETE HOLLOW BLOCKS AND CERAMIC BLOCKS SHALL BE REINFORCED OPENING 1- ø16 VERT
SEE CONSTRUCTION NOTES OR SLAB CHANGE SOFFIT TYPICAL SLAB & BEAM 10 mm ø 150 335 230 405

DOWEL)
AS SHOWN IN THE SCHEDULE OF CONCRETE HOLLOW BLOCKS AND CERAMIC BLOCK REINFORCEMENT. BARS TYPICAL
CONSTRUCTION JOINT DET.

400
DOWEL BARS TO MATCH
2. PROVIDE 150 mm x 300 mm STIFFERNER COLUMN REINFORCED WITH 4-12mm WITH 10 mm ø TIES AT 150mm ON CENTER CHB VERT. BARS
WHERE CONCRETE HOLLOW BLOCK TERMINATES AND AT EVERY 3.0M LENGTH OF CONCRETE HOLLOW BLOCK 2- ø12 TOP BARS NOTES ON CONCRETE WALLS

200
WALLS UNLESS NOTED IN STRUCTURAL PLANS. FIN. FLR. LVL.
2- ø12 BOTT BARS 1. ALL WALLS SHALL BE REINFORCED ACCORDING TO THE FOLLOWING SCHEDULE OF WALL
REINFORCEMENT UNLESS OTHERWISE INDICATED IN THE PLANS.
NOTE:
ELEVATION SECTION PROVIDE THESE ADDITIONAL BARS FOR
ALL OPENINGS PLUS BARS (NOT
TYP. DET. OF LINTEL BEAM AT CHB WALL OPENING WALL REINFORCEMENT
VERTICAL
SHOWN) PARALLEL TO SIDE OF OPENING
EQUAL TO THE NUMBER OF TERMINATED
THICKNESS HORIZONTAL VERTICAL REMARKS SECTION BARS AT OPENING
NOTES ON CONCRETE HOLLOW BLOCKS WALLS REINFORCEMENTS 100mm ø10mm @250mm O.C ø10mm @300mm O.C HORIZONTAL BARS
VER. BARS SEE ARCHITECTURAL &\ MECHANICAL
125mm ø 10mm @250mm O.C ø10mm @250mm O.C AT CENTERS VERTICAL PLANS FOR SLAB OPENING LOCATION.
BLOCK THICKNESS REINFORCEMENT NOTES DOWEL BARS TO BARS STAGGED OUT
MATCH VERT. BARS 150mm ø12 mm @ 250mm O.C ø12mm @300mm O.C HOR. BARS
FLR. SLAB OR BEAM
HORIZONTAL LAPPED A. MINIMUM LAPS AT SPLICE= 0.25 M
DOOR
75 mm 10mm ø EVERY 3RD LEVEL 10mm ø 500 mm O.C B. PROVIDE RIGHT ANGLED REINFORCEMENT 1. ALL JOINTS AND CELLS REINFORCING BARS SHALL HAVE 25mm CLEAR CONCRETE COVER FROM FACE OF WALL EXCEPT FOR OPENING
AT CORNERS 0.92 m LONG CONTAINING REINFORCING WALLS IN CONTACT WITH THE GROUND WHERE A MINIMUM OF 60mm SHALL BE PROVIDED AND FOR
125 mm 10mm ø EVERY 3RD LEVEL 10mm ø 500 mm O.C
C. WHERE CHB OR CER. BLK WALL DOWELS BARS SHALL BE FILLED EXPOSED FACES OF FORMED WALLS WHERE THE MINIMUM SHALL BE 50mm CLEAR.
150mm 10mm ø EVERY 3RD LEVEL 10mm ø 500 mm O.C WITH THE SAME SIZE AS VER. OR HOR. WITH CONCRETE GROUT. 38mm CLEAR WINDOW
REINFORCEMENT SHALL BE \ PROVIDED 2. FOR REINFORCEMENTS SEE 2. CARRY VERTICAL BARS AT LEAST 60mm ABOVE FLOOR LEVEL TO PROVIDE FOR SPLICES WHEN NECESSARY OPENING
200 mm 10mm ø EVERY 3RD LEVEL 10mm ø 500 mm O.C
CONSTRUCTION NOTES. STOP AT 50mm BELOW TOP SLAB OR SOLID BAND WHERE THE WALL ENDS VERTICAL AND HORIZONTAL BARS
SHALL BE SPLICED BY LAPPING A DISTANCE EQUAL TO 30 DIAMETERS AND WIRED SECURELY WITH 16 G.I. WIRE
1- ø16 CONT. HOR. BARS PROVIDED THAT SPLICES IN ADJACENT BARS ARE STAGGERED AT LEAST 1.50M O.C.
FOR FLOOR SLAB ONLY
3. UNLESS OTHERWISE NOTED IN THE PLANS, ALL OPENINGS IN WALLS 250mm OR THICKER SHALL BE REINFORCED
AROUND WITH 2-20mm ø BARS. FOR 225mm, 200 mm, 175mm, 150mm THICK WALLS, USE 2-16mm ø. FOR 125mm AND
100mm THICK WALLS, USE 2-12m ø BARS. ALL WALLS SPANNING SHALL HAVE VERTICAL REINFORCEMENT BENT
TYP. EXTERIOR WDW. & DOOR OPENING
TYP. SECTION OF MASONRY A U-FORM LIKE STIRRUPS AND SPACED ACCORDING TO THE SCHEDULE UNLESS OTHERWISE NOTED..
PARTITION REINFORCEMENTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED:


REPUBLIC OF THE PHILIPPINES
REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
C.Y. 2021 PROJECT GENERAL CONSTRUCTION NOTES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR THE CESAR ANTONIO P. JADER
REGION IV-A ARCHITECT II
LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, CHARLOTTE KAYE A. S 9
QUEZON II DISTRICT ENGINEERING OFFICE BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES,
PREPARED:
CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ MA. CHYMBELIN D. IBAL ROGELIO S. CRESPO
LUCENA CITY CONSTRUCTION OF MULTI-PURPOSE BUILDING ( BARANGAY HALL ) ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 2 7 17
BARANGAY ISABANG, LUCENA CITY, QUEZON JIM PAUL K. ABRIL SECTION
ENGINEER II DATE: DATE: DATE: DATE:
A A' B B' C A A' B B' C A A' B B' C

RB-2/LRB-1 RB-2/LRB-1
1'
PC-1 PC-2 PC-1

F-1, C-1 F-1, C-1 F-1, C-1

RB-2

RB-2

RB-2
FTB-1 FTB-1 B-1 B-1 RB-2 RB-1 RB-1 RB-2
1 1 1
TRUSS-1
16MMØ CROSS BRACING

WF-1
S-1 S-1 WITH STD. TURNBUCKLE

B-1

RB-2

RB-2
FTB-1
WF-1 WF-1 B-2 B-2
FTB-1

FTB-1

RB-1

RB-1
B-1
B-1

B-1
S-1
S-1
F-1, C-1 F-1, C-1 F-1, C-1
FTB-1 FTB-1 B-1 B-1 RB-1 RB-1 RB-2
RB-2
2 2 2
TRUSS-1

12MMØ PLAIN BAR SAG ROD


S-1 STAGGERED (WITH NUTS AND BOLTS)

B-1
WF-1

RB-2

RB-1

RB-1

RB-2
B-2

FTB-1

B-1
B-1
FTB-1

B-1
SLAB ON FILL S-1
t=100mm + FINISH W/
10mmØ @300mm O.C.
EACHWAY TEMP. BARS

B-1
S-1
F-1, C-1 F-1, C-1 F-1, C-1 F-1, C-1
FTB-1 FTB-1 FTB-1 RB-2 RB-1 RB-1 RB-1 RB-2
3 3 3 TRUSS-1
B-1 B-1

RB-2
B-1

RB-2
RB-2
RB-2 RB-2/LRB-1 RB-2/LRB-1 RB-2
WF-1

WF-1

RB-2
B-3
3'

B-3

RB-2

RB-2
S-1 PC-1 PC-2 PC-1
WF-1
WF-1 WF-1
4 4 4

RB-2
RB-2
B-2 RB-2
F-2, C-1 F-2, C-1 2"x6"x1.5mm C-PURLIN SPACED
4' PC-1 PC-2 PC-1 @0.50m O.C. WITH 2"x2"x4.5mm
ANGLE CLEATS

1 FOUNDATION PLAN 2 SECOND FLOOR FRAMING PLAN 3 ROOF FRAMING PLAN


S-3 SCALE 1:100 MTS S-3 SCALE 1:100 MTS S-3 SCALE 1:100 MTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED:


REPUBLIC OF THE PHILIPPINES
REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
C.Y. 2021 PROJECT FOUNDATION PLAN
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR THE CESAR ANTONIO P. JADER
REGION IV-A SECOND FLOOR FRAMING PLAN
ARCHITECT II
ROOF FRAMING PLAN
LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, CHARLOTTE KAYE A. S 10
QUEZON II DISTRICT ENGINEERING OFFICE BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES,
PREPARED:
CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ MA. CHYMBELIN D. IBAL ROGELIO S. CRESPO
LUCENA CITY CONSTRUCTION OF MULTI-PURPOSE BUILDING ( BARANGAY HALL ) ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 3 7 17
BARANGAY ISABANG, LUCENA CITY, QUEZON JIM PAUL K. ABRIL SECTION
ENGINEER II DATE: DATE: DATE: DATE:
COLUMN SCHEDULE
R. C. FOOTING SCHEDULE C-1 PC-1 PC-2
FOOTING DIMENSIONS REINFORCEMENTS REMARKS
MARK

N.G.L

F.T.B F.T.B

PLAN SECTION

1 TYPICAL FOOTING DETAIL


S-4 SCALE NTS TOP BAR REINFORCEMENT BOTTOM BAR REINFORCEMENT

R. C. S L A B S C H E D U L E

4 R.C. SLAB SCHEDULE


S-4 SCALE NTS
2 DETAIL OF BEAM
S-4 SCALE NTS

4" CHB WITH 12mmØ


SPACED @ 0.6m VERTICAL

BEAM SCHEDULE AND EVERY 3 CHB'S HORIZONTAL BAR

BEAM STEEL REINFORCEMENT


DIMENSIONS STIRRUPS
BEAM
( in / mm ) REBAR SUPPORT MID SPAN Ø 10mm
MARK
( mm Ø ) UNLESS NOTED OTHERWISE
b h TOP BOTTOM TOP BOTTOM
3-12mmØ

12mmØ SPACED @ 0.4m O.C.

5 WALL FOOTING DETAIL


3 SCHEDULE OF BEAMS S-4 SCALE NTS

S-4 SCALE NTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED:


REPUBLIC OF THE PHILIPPINES
REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
C.Y. 2021 PROJECT RC FOOTING SCHEDULE
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR THE CESAR ANTONIO P. JADER
TYPICAL FOOTING DETAIL
REGION IV-A ARCHITECT II
DETAIL OF BEAM
LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, CHARLOTTE KAYE A. S 11
QUEZON II DISTRICT ENGINEERING OFFICE
COLUMN SCHEDULE
PREPARED:
BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, SCHEDULE OF BEAMS CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ MA. CHYMBELIN D. IBAL ROGELIO S. CRESPO
LUCENA CITY CONSTRUCTION OF MULTI-PURPOSE BUILDING ( BARANGAY HALL ) RC SLAB SCHEDULE
WALL FOOTING DETAIL
ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 4 7 17
BARANGAY ISABANG, LUCENA CITY, QUEZON JIM PAUL K. ABRIL SECTION
ENGINEER II DATE: DATE: DATE: DATE:
TOP OF PARAPET

CHB WALL
APEX OF LRB-1

A A' B' C
LR
B-1 B-1
LR

TOP OF ROOF BEAM


PC-1 PC-2 PC-1
TOP OF PARAPET
RB-2
TOP OF LRB-1

4" CHB WALL


PLASTERED/PAINTED FINISH

-1 LRB
LRB
END WALL DETAIL (GRID 4')
-1
PC-1
2
S-5 SCALE 1:25MTS

TOP OF ROOF BEAM

RB-2 RB-2 RB-2 RB-2 2


RB-2 RB-2

4" CHB WALL


PLASTERED/PAINTED FINISH 10 mmØ BAR 7
S-5

10 mmØ BAR

1 END WALL DETAIL (GRID 1' & 3') 12mmØ SPACED @ 0.20 O.C.
Temperature Bars
7-10mmØ ( EACH STEP )
S-5 SCALE 1:40 MTS

7-10 mmØ BAR each step 7-16mmØ Main bar


12 mmØ BAR @ 0.20 O.C.
Temperature Bars

7-16 mmØ BAR MAIN BAR

4 DETAIL SECTION OF STAIR 3 STAIR DETAIL


S-5 SCALE 1:20 MTS S-5 SCALE 1:50 MTS

0.49 mm (BMT) LONGSPAN


PRE-PAINTED CORR. ROOFING
(0.50 mm TCT) ROOFING

.LC PURLIN
PANEL 1 PANEL 2
LC PURLIN
6mmØ J-BOLT SPACED
AS SHOWN AT ALL
PURLINS

ISOMETRIC VIEW OF
5 ROOFING FIXER 6 J-BOLT SPACING 7 ROOF PANEL SIDE LAP DETAIL 8 CONNECTION OF ROOFING TO PURLINS
S-5 SCALE NTS S-5 SCALE 1:10 MTS S-5 SCALE 1:10 MTS S-5 SCALE NTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED:


REPUBLIC OF THE PHILIPPINES
REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
C.Y. 2021 PROJECT ENDWALL DETAIL (GRID 6 & 5)
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR THE ENDWALL DETAIL (GRID 7) CESAR ANTONIO P. JADER
REGION IV-A STAIR DETAIL, ROOFING FIXER ARCHITECT II
LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, J-BOLT SPACING, ROOF PANEL SIDE LAP DETAIL CHARLOTTE KAYE A. S 12
QUEZON II DISTRICT ENGINEERING OFFICE BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, ISOMETRIC VIEW OF CONNECTION OF ROOFING TO PURLINS PREPARED:
CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ MA. CHYMBELIN D. IBAL ROGELIO S. CRESPO
LUCENA CITY CONSTRUCTION OF MULTI-PURPOSE BUILDING ( BARANGAY HALL ) ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 5 7 17
BARANGAY ISABANG, LUCENA CITY, QUEZON JIM PAUL K. ABRIL SECTION
ENGINEER II DATE: DATE: DATE: DATE:
NOTES ON ROOF CONSTRUCTION :

1. IN ACTUAL FABRICATION OF STEEL TRUSSES, MEMBERS MEETING AT POINT SHALL HAVE


THEIR GRAVITY AXIS INTERSECT AS NEARLY AS PRACTICABLE AT A COMMON POINT.
2. THE CONTRACTOR SHALL PROVIDE TEMPORARY ERECTION BRACINGS AND SHORING, AND
MAKE ACTUAL MEASUREMENTS IN THE FIELD PRIOR TO FABRICATION/INSTALLATION OF
ALL TRUSSES.
3. THE FABRICATOR/CONTRACTOR SHALL SUBMIT SHOP DETAILED DRAWINGS PRIOR TO
FABRICATION OF TRUSSES FOR APPROVAL OF THE DIRECTOR, BUREAUS OF DESIGN.

2 REFERENCE WELD DETAIL


S-6 SCALE 1:10 MTS

A A' B' C
1
S-6

APEX OF ROOFING
2
APEX OF TRUSS - 1 S-7

TOP OF ROOF BEAM

4 3
S-7 S-7

1 DETAIL ELEVATION OF TRUSS 1


S-6 SCALE 1:20 MTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED:


REPUBLIC OF THE PHILIPPINES
REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
C.Y. 2021 PROJECT DETAIL ELEVATION OF TRUSS 1
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR THE CESAR ANTONIO P. JADER
REGION IV-A REFERENCE WELD DETAIL
ARCHITECT II
LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, CHARLOTTE KAYE A. S 13
QUEZON II DISTRICT ENGINEERING OFFICE BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES,
PREPARED:
CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ MA. CHYMBELIN D. IBAL ROGELIO S. CRESPO
LUCENA CITY CONSTRUCTION OF MULTI-PURPOSE BUILDING ( BARANGAY HALL ) ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 6 7 17
BARANGAY ISABANG, LUCENA CITY, QUEZON JIM PAUL K. ABRIL SECTION
ENGINEER II DATE: DATE: DATE: DATE:
W.M.
T.C.
T.C. W.M. W.M.

W.M.

T.C. T.C.
W.M.
W.M.
6mm THICK GUSSET PLATE B.C.
B.C.
W.M. W.M.
6mm THICK GUSSET PLATE
W.M. 6mm THICK GUSSET PLATE
6mm THICK GUSSET PLATE

2 SPOT DETAIL 2 3 SPOT DETAIL 3 4 SPOT DETAIL 4


S-7 SCALE S-7 SCALE S-7 SCALE
SPOT DETAIL 1
1:10 MTS 1:10 MTS 1:10 MTS
1
S-7 SCALE 1:10 MTS

6mm
FULL
WELD

FULL 6mm
WELD T.C.

TYP. 6mm

25mm THK. LEVELING GROUT

6mm
TYP.

FULL
WELD 6mm
300 x 300 x 16mm THK. STEEL BASE
⅊, W/ 2 - 20mm Ø x 300mm LONG ANCHOR BOLTS; EACH SIDE
LC PURLINS
FULL
10mm THICK STEEL ,⅊
W/ 18mmØ HOLES; TYPICAL
WELD 6mm
16mm Ø CROSS-BRACINGS,
T.C. W/ STANDARD TURN-BUCKLE
ELEVATION 16mm Ø STEEL CROSS-BRACINGS, 10mm THICK STEEL , ⅊
W/ STANDARD TURN-BUCKLE W/ 18mmØ HOLES; TYPICAL

4 - 6mm Ø x 40mm MACHINE


RB-1
BOLTS W/ STD. NUTS & WASHERS, SPACED AS SHOWN

6 DETAIL OF PURLIN SPLICE 7 DETAIL CONN. OF CROSS BRACING


S-7 SCALE 1:10 MTS S-7 SCALE 1:10 MTS

FULL WELD

. 12mmØ SAGRODS W/

125 x 125 x 50 x 6mm STEEL JOINT STANDARD NUT & WASHER
CONNECTOR, FULL WELD TO TOP CHORD

LC PURLINS

ROO
FIN
G

300 x 300 x 12mm THK. STEEL BASE T.C.


10mm Ø SAG RODS @ LC PURLINS
⅊, W/ 4 - 20mm Ø x 300mm LONG ANCHOR BOLTS; EACH SIDE T.C.
MID-POINT, STAGGERED
4 - 6mm Ø x 40mm MACHINE BOLTS W/ STD.
NUTS & WASHERS, SPACED AS SHOWN

PLAN

5 DETAIL OF TRUSS ANCHORAGE 8 DETAIL CONN. OF PURLIN TO TOP CHORD 9 DETAIL CONN. OF PURLIN TO SAG ROD
S-7 SCALE 1:10 MTS S-7 SCALE 1:10 MTS S-7 SCALE 1:10 MTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED:


REPUBLIC OF THE PHILIPPINES
REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
C.Y. 2021 PROJECT SPOT DETAIL 1, 2, 3 & 4
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR THE CESAR ANTONIO P. JADER
DETAIL OF TRUSS ANCHORAGE
REGION IV-A ARCHITECT II
DETAIL OF PURLIN
LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, CHARLOTTE KAYE A. S 14
QUEZON II DISTRICT ENGINEERING OFFICE
DETAIL CONNECTION OF CROSS BRACING
PREPARED:
BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, DETAIL CONN. OF PURLIN TO TOP CHORD CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ MA. CHYMBELIN D. IBAL ROGELIO S. CRESPO
LUCENA CITY CONSTRUCTION OF MULTI-PURPOSE BUILDING ( BARANGAY HALL ) DETAIL CONN. OF PURLIN TO SAGROD
ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 7 7 17
BARANGAY ISABANG, LUCENA CITY, QUEZON JIM PAUL K. ABRIL SECTION
ENGINEER II DATE: DATE: DATE: DATE:
ELECTRICAL NOTES: SPECIFICATION
· TYPE OF SERVICE SHALL BE 230V, 1Ø, 3W, 60HZ.

· METHODS OF WIRING SHALL BE IN RSC, AND TYPE OF CONDUCTOR SHALL BE TW


COPPER FOR BRANCH CIRCUIT AND THWN FOR SERVICE ENTRANCE.
A A' B B' C A A' B B' C
· ALL MATERIALS AND EQUIPMENT SHALL BE EFFECTIVELY BONDED AND JOINDED.
7000 7000
· ELECTRICAL INSTALLATION SHALL BE DONE THE DIRECT SUPERVISION OF A DULY 3500 1750 1750 3500 1750 1750
LICENSED ELECTRICAL ENGINEER MASTER ELECTRICIAN.

· ALL WORKS HERE UNDER SHALL COMPLY IN ACCORDANCE WITH THE LATEST
PROVISION OF THE PEC, NBC, LOCAL ORDINANCE AND MERALCO REQUIREMENTS.
1 1
LEGENDS & SYMBOLS:
STORAGE 1 TOILET 1 STORAGE 2 TOILET 2

SESSION

4500

4500
Sab ROOM
Sabc OFFICE OF THE PANTRY
S2W SK CHAIRMAN
HALLWAY
SERVICE
DOOR

9000

9000
2 2 DOWN
SLIDE SLIDE

UTILITY
BARANGAY ROOM
COMMITTEE AREA OPEN
OFFICE OF THE

4500

4500
INFORMATION / BELOW

WAITING AREA BRGY. CHAIRMAN

UP

3 3

1500

1500
RAMP
UP

KWHM
4 4
UP

2250 2500 2250 2250 2500 2250

100 AT
GROUND FLOOR POWER LAYOUT SECOND FLOOR POWER LAYOUT
30 AT 30 AT
1 2
SCALE 1:100 MTS SCALE 1:100 MTS
30 AT 30 AT
3 4
60 AT 60 AT
6
60 AT 60 AT
7 8
Ø
9
SPARE SPARE
10
A A' B B' C
A A' B B' C
7000
7000 3500 1750 1750
3500 1750 1750
RISER DIAGRAM POWER RISER DIAGRAM

ELECTRICAL RISER DIAGRAM 2 SINGLE LINE DIAGRAM 1


1
SCALE NTS SCALE NTS
STORAGE 2 TOILET 2
STORAGE 1 TOILET 1
SESSION

4500
ROOM

4500
OFFICE OF THE PANTRY
HALLWAY
SK CHAIRMAN
SERVICE
NO. OF OUTLET

9000
SIZE OF CONDUCTORS AND DOOR 2
CKT NO. LOAD DESCRIPTION VA VOLTS AMPERES PROTECTION CONDUITS
DOWN

9000
2
SLIDE SLIDE
LO CO SW SCO

UTILITY
BARANGAY ROOM OPEN
OFFICE OF THE

4500
BELOW
COMMITTEE AREA
BRGY. CHAIRMAN

4500
INFORMATION /
WAITING AREA

UP
3
3

1500
1500
RAMP
UP
4
4
UP
2250 2500 2250
2250 2500 2250

GROUND FLOOR LIGHTING LAYOUT SEOND FLOOR LIGHTING LAYOUT


SCALE 1:100 MTS SCALE 1:100 MTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED:


REPUBLIC OF THE PHILIPPINES
REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
C.Y. 2021 PROJECT ELECTRICAL NOTES, SPECIFICATION, LEGENDS &
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR THE CESAR ANTONIO P. JADER
SYMBOLS
REGION IV-A ARCHITECT II
ELECTRICAL RISER DIAGRAM
LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, CHARLOTTE KAYE A. E 15
QUEZON II DISTRICT ENGINEERING OFFICE
SINGLE LINE DIAGRAM
PREPARED:
BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, LOAD SCHEDULE CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ MA. CHYMBELIN D. IBAL ROGELIO S. CRESPO
LUCENA CITY CONSTRUCTION OF MULTI-PURPOSE BUILDING ( BARANGAY HALL ) GROUND & SECOND FLOOR POWER LAYOUT
GROUND & SECOND FLOOR LIGHTING LAYOUT
ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 1 1 17
BARANGAY ISABANG, LUCENA CITY, QUEZON JIM PAUL K. ABRIL SECTION
ENGINEER II DATE: DATE: DATE: DATE:
1 A
PLUMBING NOTES:

100mmØ PVC VS
R
VST
A'
35
A A' B B' C A A' B B' C 00
00
B
45 70
7000 7000
2 00 B'
00 17
90 50
3500 1750 1750 3500 1750 1750 S LAV
ROESS
OMION 17 C
50
0 ST
DC LC 450 OR
100mmØ 3 SL
ID
E
AG
E2 C
O
PVC SP TOD
SS
4 SL FIL WC
1 CO 1 CO 0 0
IDE
HA
ET
15 BR OFF 2
LAV 100mmØ LAV GY IC LL
WA CO UR
FD WC PVC SP FD WC .CEO Y
HA F T
IR HE
STORAGE 1 TOILET 1 STORAGE 2 TOILET 2 MA DO
UR UR N WN

100mmØ PVC SS
BEOPE
LO N
SESSION 22 W

4500

4500
CO 50
S ROOM
OFFICE OF THE PANTRY 25
SK CHAIRMAN CO 00
HALLWAY 1 A
SERVICE
DOOR 22
50
A'

9000

9000
2 2 35
SLIDE SLIDE
DOWN
45
00
00
B
70
2 00 B'
00 17
UTILITY 90 50
BARANGAY ROOM LAV
COMMITTEE AREA OPEN
O
SK FFI 17 C
OFFICE OF THE 0 CHCE 50

4500

4500
INFORMATION / BELOW
0 AIROF ST
BRGY. CHAIRMAN 45 MA THE
OR
WAITING AREA 3 N E1
AG CO
DC
CO B TOD
4 MMARA S FIL WC LC
ITT NG ET
00 PA 1
15 EE AY NT UR
UP AR RY
R
UPAMP
EA S
I DOERV CO
WANFO OR ICE
3 3 ITI RM
PLUMBING LEGENDS: NG AT
AR ION U
ROTILI C ANA
L

1500

1500
AGE
RAMP 22 EA /
50 OM TY
SEW
UP
UP
TO
4 4 25
UP
UP 00

2250 2500 2250 2250 2500 2250 22


50

GROUND FLOOR SECOND FLOOR


1 SEWER LINE LAYOUT 2 SEWER LINE LAYOUT 3 SEWER LINE ISOMETRIC DIAGRAM
P-1 SCALE 1:100 MTS P-1 SCALE 1:100 MTS P-1 SCALE NTS

1 A

A'
35
00
45
00 B
70
2 00 B'
A A' B B' C A A' B B' C 00 17
90 50
S
ROESS C
7000 7000
0
OMION LAV 17
50
50 ST
3500 1750 1750 3500 1750 1750 4 OR
3 SL
ID
E
AG
E2
TO C
4 SL
IDE ILER W
100mmØ UT V
00 BR OFF HA 2 G
PVC 15 LL
GY IC WA
.CEO Y
1 1 HA F T
IR HE

12mmØ uPVC BLUE PIPE


MA
LAV LAV N DO
WN
WC 100mmØ WC BEOPE
PLAN STORAGE 1 TOILET 1
PVC
STORAGE 2 TOILET 2
22
50
LO N
W

UR UR
SESSION 25
4500

4500
00
ROOM 1 A
OFFICE OF THE PANTRY S
22
SK CHAIRMAN 50
HALLWAY A'
35
SERVICE 00
DOOR 45
00 B
70
2 00 B'
9000

9000
2 2 DOWN 00 17
SLIDE SLIDE 90 50
O
SK FFI C
UTILITY 0 CHCE LAV 17
50
50 AIROF ST
BARANGAY 4 OR
ROOM
3 MA THE AG
COMMITTEE AREA N E1
OPEN
CO B TO C
OFFICE OF THE
4 MMARA ILUER W
4500

4500
INFORMATION / BELOW

WAITING AREA BRGY. CHAIRMAN 00 ITT NG PA T1


15 EE AY N S
AR TR
R EA Y
UPAMP S
I
WANFO DOERV
OR ICE
ITI RM
UP NG AT
AR ION U
ROTILI
22 EA / OM TY E
3 3 50 PIP
UP
LUE
CB
UP uPV

1500

1500
RAMP
25
UP 00 12m
4 4 WM
UP
22
50 GV

TER
2250 2500 2250 2250 2500 2250
M WA Y
FRO SUPPL
SECTION
GROUND FLOOR SECOND FLOOR
7 SEPTIC TANK DETAIL 4 WATER LINE LAYOUT 5 WATER LINE LAYOUT 6 WATER LINE ISOMETRIC DIAGRAM
P-1 SCALE P-1 SCALE 1:100 MTS P-1 SCALE 1:100 MTS P-1 SCALE NTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED:


REPUBLIC OF THE PHILIPPINES
REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
C.Y. 2021 PROJECT PLUMBING NOTES & LEGENDS
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR THE CESAR ANTONIO P. JADER
GROUND & SECOND FLOOR SEWER LINE LAYOUT
REGION IV-A ARCHITECT II
SEWER LINE ISOMETRIC DIAGRAM
LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, CHARLOTTE KAYE A. P 16
QUEZON II DISTRICT ENGINEERING OFFICE PREPARED:
GROUND & SECOND FLOOR WATER LINE LAYOUT
BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, WATER LINE ISOMETRIC DIAGRAM CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ MA. CHYMBELIN D. IBAL ROGELIO S. CRESPO
LUCENA CITY CONSTRUCTION OF MULTI-PURPOSE BUILDING ( BARANGAY HALL ) SEPTIC TANK DETAIL
ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 1 2 17
BARANGAY ISABANG, LUCENA CITY, QUEZON JIM PAUL K. ABRIL SECTION
ENGINEER II DATE: DATE: DATE: DATE:
1 0 A
85 16
00
RD A'
00 35
45 00 B
2 00
70
00 B'
90
RD 35
0
00 C
450
3 16
PLAN SECTION 4 00
15 850 RD
00

RD

1 CATCH BASIN DETAIL


RD
P-2 SCALE 1:10 MTS
RD10700

RD 1 A
RD
A'
35
45
00 00
00
B
15 70
2 00 B'
00 17
A A' B B' C A A' B B' C A A' B B' C 90 50
S
ROESS
OMION 17 C
7000 7000 50
00 ST
7000 45 OR
3500 1750 1750 3500 1750 1750 3 SL
IDE AG
E
1600 3500 3500 1600 2T
OI
4 SL
IDE LE
T2
00 BR OFF HA
15 GY IC LL
.CEO WA

850
HA F Y
1 CB CB 1 1 IR THE
MA
DS DS RD RD N DO
WN
DS DS
BEOPE
LO N
22 W
50
STORAGE 2 TOILET 2 STORAGE 1 TOILET 1

25
SESSION 00
A
4500

4500

4500
ROOM 1
OFFICE OF THE PANTRY 22
50
SK CHAIRMAN CB A'
HALLWAY 35
SERVICE
45
00
00
B
70
DOOR 2 00 B'

10700
00
9000

9000

9000
2 CB DOWN
CB 2 DS DS
2 RD RD 90
17
50
SLIDE SLIDE
DS DS
CB O
SK FFI 17 C
0 CHCE ST
50
UTILITY 450 AIROF OR
BARANGAY ROOM 3 MA THE AG
N E1
OPEN COMMITTEE AREA CO B TO
OFFICE OF THE 4 MMARA ILE
4500

4500

4500
BELOW
INFORMATION / ITT NG T1
00 PA
BRGY. CHAIRMAN WAITING AREA 15 CB EE AY NT
RY CB
AR
R
UPAMP
EA S
I DOERV
WANFO OR ICE
ITI RM
EST NG AT
UP
N EAR TLET CB AR ION U
ROTILI
DS DS
DS DS RD RD P TO E OU 22
5
EA / OM TY
TA INAG 0 CB
3 3 3 EST
UP
CB CB
DRA N EAR UTLET

850
UP
TO O 25
TAP INAGE
1500

1500

1500
RAMP 00
CB
DRA
UP
DS DS
T
4 4 4 RES T22

1500
CB CB DS DS RD RD
NEA UTLE 50 CB
UP
T O O
TAP INAGE
A EST
2250 2500 2250 2250 2500 2250 D R
N EAR TLET
TO OU
TAP INAGE
DRA

GROUND FLOOR SECOND FLOOR ROOF


2 DRAINAGE LAYOUT 3 DRAINAGE LINE LAYOUT 4 DRAINAGE LINE LAYOUT 5 DRAINAGE LINE ISOMETRIC DIAGRAM
P-2 SCALE 1:100 MTS P-2 SCALE 1:100 MTS P-2 SCALE 1:100 MTS P-1 SCALE NTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED:


REPUBLIC OF THE PHILIPPINES
REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
C.Y. 2021 PROJECT CATCH BASIN DETAIL
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR THE CESAR ANTONIO P. JADER
GROUND FLOOR DRAINAGE LAYOUT
REGION IV-A ARCHITECT II
SECOND FLOOR DRAINAGE LAYOUT
LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, CHARLOTTE KAYE A. P 17
QUEZON II DISTRICT ENGINEERING OFFICE PREPARED:
ROOF DRAINAGE LINE LAYOUT
BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, DRAINAGE LINE ISOMETRIC DIAGRAM CONSTANTINO FAUSTINO MARK ANTHONY S. DE LA CRUZ MA. CHYMBELIN D. IBAL ROGELIO S. CRESPO
LUCENA CITY CONSTRUCTION OF MULTI-PURPOSE BUILDING ( BARANGAY HALL ) ENGINEER II CHIEF, PLANNING AND DESIGN ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 2 2 17
BARANGAY ISABANG, LUCENA CITY, QUEZON JIM PAUL K. ABRIL SECTION
ENGINEER II DATE: DATE: DATE: DATE: