Construction Repair/Rehabilitation/Improvement of Various Infrastructures Including Local Projects

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


REGION 4-A
CAVITE 1 DISTRICT ENGINEERING OFFICE
TRECE MARTIRES CITY, CAVITE

CONSTRUCTION REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS


INFRASTRUCTURES INCLUDING LOCAL PROJECTS
CONSTRUCTION OF MULTI PURPOSE BUILDING (BRGY. HALL) ANABU I-B
IMUS, CAVITE 3RD LD

PREPARED BY CHECKED AND SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY

RHOVANNY I. FIGUEROA ROMUALDO E. BERNARDO NENETTTE K. IGNA OSCAR U. DELA CRUZ


ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
7.00

1.50 3.50 3.50

CORRUGATED G.I. LONG SPAN


CORRUGATED G.I. LONG SPAN
APEX OF TRUSS
W-1 W-3 W-2 APEX OF TRUSS

1.00

1.00
TOP OF ROOF BEAM
STAIR D-4 TOP OF ROOF BEAM
WELL
D-5

3.50
W-1 CONCRETE WALL

3.20

3.20
(PAINT FINISH)

W-1 W-1 W-1 W-1

SECOND FLOOR LEVEL SECOND FLOOR LEVEL

7.00
D-3

3.20
3.20
W-1 W-1

3.50
W-1 W-1 W-1 GROUND FLOOR LEVEL
D-2 GROUND FLOOR LEVEL RIGHT SIDE ELEVATION

0.10
FRON ELEVATION

UP

D-1 W-1 W-1

GROUND FLOOR PLAN

7.00

1.50 3.50 3.50

CORRUGATED G.I. LONG SPAN


CORRUGATED G.I. LONG SPAN
APEX OF TRUSS
APEX OF TRUSS
W-1

1.00

1.00
TOP OF ROOF BEAM
TOP OF ROOF BEAM
STAIR D-1
WELL
D-5
3.50

CONCRETE WALL

3.20

3.20
W-3 (PAINT FINISH)

W-1
W-1 W-1 W-2 W-1

SECOND FLOOR LEVEL SECOND FLOOR LEVEL


7.00

D-3

3.20
3.20
W-3
W-1
3.50

W-1 W-1 W-2


GROUND FLOOR LEVEL
GROUND FLOOR LEVEL
LEFT SIDE ELEVATION
REAR ELEVATION

0.10
DWN

W-1 W-1

SECOND FLOOR PLAN

PROJECT / LOCATION SHEET CONTENTS : CADD BY: CHECKED AND SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHT NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION REPAIR/REHABILITATION/IMPROVEMENT OF MARIELL G. SIDAMON
VARIOUS INFRASTRUCTURES INCLUDING LOCAL PROJECTS ADMIN. ASSISTANT I
REGION IV- A CONSTRUCTION OF MULTI PURPOSE
GROUND FLOOR PLAN,
SECOND FLOOR PLAN PREPPARED BY:
CAVITE I DISTRICT ENGINEERING OFFICE BUILDING (BRGY. HALL) ANABU I-B ELEVATION PLAN ROMUALDO E. BERNARDO NENETTE K. IGNA OSCAR U. DELA CRUZ
TRECE MARTIRES CITY IMUS, CAVITE 3RD LD CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DEISTRICT ENGINEER
RHOVANNY I. FIGUEROA
ENGINEER II
0.90 0.70 1.60 0.60
1.00 1.00 0.80 1.20

1.20

1.20

0.50
2.10

2.10

2.10

2.10

2.10
D-1 D-2 D-3 D-4 D-5 W-1 W-2 W-3
ANALOK DOOR SLIDING DOOR ANALOK DOOR ANALOK DOOR PVC DOOR ANALOK WINDOW ANALOK WINDOW ANALOK WINDOW

TRUSS - 1

PURLINS

PURLINS

PURLINS

PURLINS

PURLINS

PURLINS

PURLINS

PURLINS
TRUSS - 1

PURLINS

PURLINS

PURLINS

PURLINS

PURLINS

PURLINS

PURLINS

PURLINS
TRUSS - 1

ROOF FRAMING PLAN


ROOF PLAN

PROJECT / LOCATION SHEET CONTENTS : CADD BY: CHECKED AND SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHT NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION REPAIR/REHABILITATION/IMPROVEMENT OF MARIELL G. SIDAMON
VARIOUS INFRASTRUCTURES INCLUDING LOCAL PROJECTS SCHEDULE OF DOORS AND WINDOWS ADMIN. ASSISTANT I
REGION IV- A ROOF PLAN PREPPARED BY:
CONSTRUCTION OF MULTI PURPOSE
CAVITE I DISTRICT ENGINEERING OFFICE BUILDING (BRGY. HALL) ANABU I-B ROOF FRAMING PLAN
ROMUALDO E. BERNARDO NENETTE K. IGNA OSCAR U. DELA CRUZ
TRECE MARTIRES CITY IMUS, CAVITE 3RD LD CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DEISTRICT ENGINEER
RHOVANNY I. FIGUEROA
ENGINEER II
C1-F1 C1-F1 C1-F1 B-1 B-1
TB-1 TB-1 1.30
7 - 16 mm. Ø RSB BARS
BOTHWAYS

B-1

B-1
S-1

TB-1
TB-1

TB-1

1.30
C1-F1 C1-F1 C1-F1
B-1 B-1
SECTION

F.F.L.
N.G.L.

TB-1
TB-1

TB-1

0.10
S-1

B-1

B-1

0.30
1.50
7 - 16 mm. Ø RSB BARS
BOTHWAYS
TB-1
B-1 B-1 PLAN
TB-1
C1-F1 C1-F1 C1-F1 DETAIL OF C1-F1
FOUNDATION PLAN SECOND FLOOR FRAMING PLAN

B
SCHEDULE OF COLUMN

REINFORCEMENT
1.40 1.00 1.00 1.10 1.00 1.00 1.00 1.50
D

SIZE OF MAIN BAR SIZE OF TILES SPACING TILES

COLLUMN DETAIL (Typical)


6 - 16mm Ø RSB
C1 0.30m 0.30m GRADE 60
10 mmØ RSB 1 @ 0.05 m., 3 @ 0.10 m., RESET @ 0.20 m. 9.00

TRUSS DETAIL
REINFORCEMENT
L1/4 L1/4 L2/4 L2/4

1.30 m. 1.30 m. 0.30 m.


8 - 16mmØ RSB S1 0.100 m
10mmØ RSB spaced
@ every 0.15mm
Stirrups Top Bars Extra Top Bars
Bothways Bothways o.c
B

Main Bars

Stirrups

D
SIZE OF SPACING OF
STIRRUPS STIRRUPS
Bottom Bars Extra Bottom Bars

B-1 0.30 m. 0.25 m. 6 - 20 mmØ RSB 10 mmØ RSB 3 @ 50mm, 3 @ 100mm


rest @ 150mm o.c Cantilever L1 L2
(where occures)

BEAM DETAIL
SCALE 1:100 M

PROJECT / LOCATION SHEET CONTENTS : CADD BY: CHECKED AND SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHT NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CONSTRUCTION REPAIR/REHABILITATION/IMPROVEMENT OF TRUSS DETAIL MARIELL G. SIDAMON
VARIOUS INFRASTRUCTURES INCLUDING LOCAL PROJECTS ADMIN. ASSISTANT I
REGION IV- A BEAM DETAIL
CONSTRUCTION OF MULTI PURPOSE SCHEDULE OF SLAB, BAM, FOOTING AND COLUMN PREPPARED BY:
CAVITE I DISTRICT ENGINEERING OFFICE BUILDING (BRGY. HALL) ANABU I-B FOUNDATION PLAN ROMUALDO E. BERNARDO NENETTE K. IGNA OSCAR U. DELA CRUZ
TRECE MARTIRES CITY IMUS, CAVITE 3RD LD SECOND FLOOR FRAMING PLAN CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DEISTRICT ENGINEER
RHOVANNY I. FIGUEROA
ENGINEER II

You might also like