PROJECT : LAYING & CONSTRUCTION OF STEEL GAS PIPELINE AND TERMINALS ALONG WITH ASSOCIATED FACILITIES FOR SECTION-II

(24"
x 226.6 KM) FOR MUMBAI NAGPUR PIPELINE PROJECT (PART A).

HDPE DUCT STATUS FOR SPREAD-1 (SECTION-2-A)


Owner : GAIL (INDIA) Limited
Cosultant : MECON LIMITED
Contractor : KALPATARU POWER TRANSMISSION LIMITED
Chainage/Jts
Sr. No. Report No. Date UOM Total Length Coupler Location Remarks
From To
6 HDPE-001A 11-Nov-21 KM238 M06 KM238 M12 Mtrs 96.960 96.960
24 HDPE-010 1-Dec-21 KM238 FT13 KM238 FT15 Mtrs 24.190 121.150
1 HDPE-001 11-Nov-21 KM238 M16 KM238 M39 Mtrs 300.290 421.440
53 HDPE-026 20-Dec-21 KM238 FT40 KM238 T42 Mtrs 18.990 440.430
2 HDPE-001 11-Nov-21 KM238 M43 KM239 M01 Mtrs 520.640 961.070
2 4 961.070
3 HDPE-001 11-Nov-21 KM239 M05 KM239 M23 Mtrs 241.640 KM239 M22 1,202.710
25 HDPE-010 1-Dec-21 KM239 FT24 KM239 T25 Mtrs 10.010 1,212.720
4 HDPE-001 11-Nov-21 KM239 M26 KM240 M02 Mtrs 734.600 1,947.320
N-22056775.615, E-
26 HDPE-010 1-Dec-21 KM240 FT03 KM240 FT05 Mtrs 24.210 1,971.530
505438.475
5 HDPE-001 11-Nov-21 KM240 M06 KM240 M18 Mtrs 168.330 2,139.860
19 83 2,139.860
1 37 2,139.860
8 HDPE-003 19-Nov-21 KM241 M38 KM241 M78 Mtrs 505.190 2,645.050
31 HDPE-011 2-Dec-21 KM241 FT79 KM241 T81 Mtrs 22.670 2,667.720

7 HDPE-002 18-Nov-21 KM241 M82 KM242 M42 Mtrs 539.250 3,206.970

43 74 3,206.970

50 HDPE-023 17-Dec-21 KM242 FT75 KM242 FT83 Mtrs 120.570 3,327.540


64 HDPE-032 28-Dec-21 KM243 FT01 KM243 FT01 Mtrs - 3,327.540
51 HDPE-024 18-Dec-21 KM243 M02 KM243 M13 Mtrs 156.390 3,483.930

N-2205388.769, E-
65 HDPE-032 28-Dec-21 KM243 FT14 KM243 FT14 Mtrs - 3,483.930
508547.50

52 HDPE-025 19-Dec-21 KM243 FT14A KM243 FT14CTR Mtrs 48.350 3,532.280


65 HDPE-032 28-Dec-21 KM243 FT15TR KM243 FT15A Mtrs 9.375 3,541.655
48 HDPE-021 16-Dec-21 KM243 M16 KM243 M29 Mtrs 180.550 3,722.205
N-220538.950,
65 HDPE-032 28-Dec-21 KM243 T30 KM243 FT35 Mtrs 36.350 E-508775.310, 3,758.555
N-2205380.478,
E-508810.485
9 HDPE-004 20-Nov-21 KM243 M36 KM244 M33 Mtrs 988.160 4,746.715
37 HDPE-013 8-Dec-21 KM244 FT34 KM244 T36 Mtrs 23.470 4,770.185
10 HDPE-005 21-Nov-21 KM244 M37 KM245 M24 Mtrs 869.160 5,639.345
38 HDPE-013 8-Dec-21 KM245 T25 KM245 FT28 Mtrs 34.630 5,673.975
11 HDPE-005 21-Nov-21 KM245 M29 KM245 M46 Mtrs 229.280 5,903.255
N-2205196.996, E-
47 HDPE-020 15-Dec-21 KM245 T47 KM245 FT52 Mtrs 65.340 510946.595, N- 5,968.595
2205188.125, E-
511005.935
12 HDPE-006 22-Nov-21 KM245 M53 KM245 M81 Mtrs 359.670 6,328.265
N-2205127.779, E-
46 HDPE-019 19-Dec-21 KM245 FT82 KM246 T4B Mtrs 76.860 511365.471, N- 6,405.125
2205115.575, E-
511441.368

Page 1 of 14
PROJECT : LAYING & CONSTRUCTION OF STEEL GAS PIPELINE AND TERMINALS ALONG WITH ASSOCIATED FACILITIES FOR SECTION-II (24"
x 226.6 KM) FOR MUMBAI NAGPUR PIPELINE PROJECT (PART A).

HDPE DUCT STATUS FOR SPREAD-1 (SECTION-2-A)


Owner : GAIL (INDIA) Limited
Cosultant : MECON LIMITED
Contractor : KALPATARU POWER TRANSMISSION LIMITED
Chainage/Jts
Sr. No. Report No. Date UOM Total Length Coupler Location Remarks
From To
13 HDPE-007 26-Nov-21 KM246 M05 KM246 M35 Mtrs 386.590 6,791.715
32 HDPE-012 5-Dec-21 KM246 FT36 KM246 FT37 Mtrs 12.110 6,803.825
14 HDPE-007 26-Nov-21 KM246 M38 KM246 M50 Mtrs 169.310 6,973.135
39 HDPE-013 8-Dec-21 KM246 T51 KM246 T51 Mtrs - 6,973.135
15 HDPE-007 26-Nov-21 KM246 M52 KM247 M06 Mtrs 472.310 7,445.445

N-2204976.580, E-
49 HDPE-022 16-Dec-21 KM247 T07 KM247 FT16 Mtrs 107.660 7,553.105
512469.260

16 HDPE-007 26-Nov-21 KM247 M17 KM247 M33 Mtrs 217.760 7,770.865

TOTAL 7,770.865

FOR KPTL FOR MECON FOR GAIL

Page 2 of 14
Chainage/Jts Total
Sr. No. Report No. Date UOM
From To Length
1 HDPE-001 11-Nov-21 KM238 M16 KM238 M39 Mtrs 300.29
2 HDPE-001 11-Nov-21 KM238 M43 KM239 M01 Mtrs 520.64
3 HDPE-001 11-Nov-21 KM239 M05 KM239 M23 Mtrs 241.64
4 HDPE-001 11-Nov-21 KM239 M26 KM240 M02 Mtrs 734.6
5 HDPE-001 11-Nov-21 KM240 M06 KM240 M10 Mtrs 168.33
6 HDPE-001A 11-Nov-21 KM238 M06 KM238 M12 Mtrs 96.96
7 HDPE-002 18-Nov-21 KM241 M82 KM242 M42 Mtrs 539.25
8 HDPE-003 19-Nov-21 KM241 M38 KM241 M78 Mtrs 505.19
9 HDPE-004 20-Nov-21 KM243 M36 KM244 M33 Mtrs 988.16
10 HDPE-005 21-Nov-21 KM244 M37 KM245 M24 Mtrs 869.16
11 HDPE-005 21-Nov-21 KM245 M29 KM245 M46 Mtrs 229.28
12 HDPE-006 22-Nov-21 KM245 M53 KM245 M81 Mtrs 359.67
13 HDPE-007 26-Nov-21 KM246 M05 KM246 M35 Mtrs 386.59
14 HDPE-007 26-Nov-21 KM246 M38 KM246 M50 Mtrs 169.31
15 HDPE-007 26-Nov-21 KM246 M52 KM247 M06 Mtrs 472.31
16 HDPE-007 26-Nov-21 KM247 M17 KM247 M33 Mtrs 217.76
17 HDPE-008 29-Nov-21 KM248 M70 KM248 M81 Mtrs 157.34
18 HDPE-008 29-Nov-21 KM248 M57 KM248 M64 Mtrs 107.96
19 HDPE-008 29-Nov-21 KM248 M27 KM248 M36 Mtrs 132.8
20 HDPE-008 29-Nov-21 KM247 M82 KM247 M23 Mtrs 313.78
21 HDPE-008 29-Nov-21 KM247 M71 KM247 M79 Mtrs 121.21
22 HDPE-008 29-Nov-21 KM247 M47 KM247 M66 Mtrs 253.74
23 HDPE-009 1-Dec-21 KM250 M65 KM251 M13 398.31
Mtrs
24 HDPE-010 1-Dec-21 KM238 FT38 KM238 FT15 Mtrs 24.19
25 HDPE-010 1-Dec-21 KM239 FT24 KM239 T25 Mtrs 10.01

26 HDPE-010 1-Dec-21 KM240 FT03 KM240 FT05 24.21


Mtrs
27 HDPE-010 1-Dec-21 KM 249 M12 KM249 M31 Mtrs 252.98
28 HDPE-010 1-Dec-21 KM249 M38 KM249 M49 Mtrs 157.07
29 HDPE-010 1-Dec-21 KM250 M22 KM250 M36 Mtrs 191.69
30 HDPE-010 1-Dec-21 KM250 M39 KM250 M50 Mtrs 156.45
31 HDPE-011 2-Dec-21 KM241 FT79 KM241 T81 Mtrs 22.67
32 HDPE-012 5-Dec-21 KM246 FT36 KM246 FT37 Mtrs 12.11
33 HDPE-012 5-Dec-21 KM252 M07 KM252 M25 Mtrs 239.99
34 HDPE-012 5-Dec-21 KM252 M31 KM252 M39 Mtrs 120.27
35 HDPE-012 5-Dec-21 KM253 M13 KM253 M32 Mtrs 251.29
36 HDPE-012 5-Dec-21 KM253 M38 KM253 M49 Mtrs 156.41
37 HDPE-013 8-Dec-21 KM244 FT34 KM244 T36 Mtrs 23.47
38 HDPE-013 8-Dec-21 KM245 T25 KM245 FT28 Mtrs 34.63
39 HDPE-013 8-Dec-21 KM246 T51 KM246 T51 Mtrs 0
40 HDPE-014 10-Dec-21 KM235 M47 KM235 M64 Mtrs 228.33
41 HDPE-014 10-Dec-21 KM235 M74 KM236 M15 Mtrs 313.27
42 HDPE-015 10-Dec-21 KM 253 FT10 KM253 FT12A Mtrs 36.24
43 HDPE-016 10-Dec-21 KM252 FT40 KM252 M44 60.57
Mtrs
44 HDPE-017 11-Dec-21 KM234 M11 KM234 M67 Mtrs 700.01
45 HDPE-018 12-Dec-21 KM235 M04 KM235 M20 Mtrs 215.28

46 HDPE-019 19-Dec-21 KM245 FT82 KM246 T4B 76.86

Mtrs

47 HDPE-020 15-Dec-21 KM245 T47 KM245 FT52 65.34

Mtrs
48 HDPE-021 16-Dec-21 KM243 M16 KM243 M29 Mtrs 180.55
49 HDPE-022 16-Dec-21 KM247 T07 KM247 FT16 107.66
Mtrs
50 HDPE-023 17-Dec-21 KM242 FT75 KM242 FT83 Mtrs 120.57
51 HDPE-024 18-Dec-21 KM243 M02 KM243 M13 Mtrs 156.39
52 HDPE-025 19-Dec-21 KM243 FT14A KM243 FT14CTR Mtrs 48.35
53 HDPE-026 20-Dec-21 KM238 FT40 KM238 T42 Mtrs 18.99
54 HDPE-027 22-Dec-21 KM253 FT50 KM253 M56 Mtrs 84.865
55 HDPE-028 26-Dec-21 KM229 M01 KM229 M23 Mtrs 287.76
56 HDPE-028 26-Dec-21 KM229 M25 KM229 M27 Mtrs 47.89
57 HDPE-028 26-Dec-21 KM229 M33 KM229 M65 Mtrs 410.235
58 HDPE-028 26-Dec-21 KM229 M67 KM229 M68 Mtrs 36.355
59 HDPE-028 26-Dec-21 KM229 M74 KM229 M77 Mtrs 59.93
60 HDPE-028 26-Dec-21 KM229 M79 KM230 M27 Mtrs 397.88
61 HDPE-029 27-Dec-21 KM248 M39 KM248 M48 Mtrs 133.12
62 HDPE-030 27-Dec-21 KM249 M53 KM250 M18 Mtrs 600.5
63 HDPE-031 27-Dec-21 KM230 M30 KM230 M44 Mtrs 192.94
64 HDPE-032 28-Dec-21 KM243 FT01 KM243 FT0 Mtrs 0
65 HDPE-032 28-Dec-21 KM243 FT14 KM243 FT14 0
Mtrs
65 HDPE-032 28-Dec-21 KM243 FT15TR KM243 FT15A Mtrs 9.375

65 HDPE-032 28-Dec-21 KM243 T30 KM243 FT35 36.35

Mtrs
65 HDPE-032 28-Dec-21 KM247 T80 KM247 FT81 Mtrs 7.24
65 HDPE-033 28-Dec-21 KM234 M71 KM234 M83 Mtrs 167.92
65 HDPE-034 29-Dec-21 KM248 FT24 KM248 FT26 Mtrs 24.22
65 HDPE-035 30-Dec-21 KM247 FT67 KM247 FT70 Mtrs 38.97
65 HDPE-036 30-Dec-21 KM236 M34 KM236 M23 Mtrs 889.66

TOTAL 15715.34
Coupler Location Remarks

KM239 M22

N-2204436.928,E-
516440.653

N-22056775.615,
E-505438.475
N-2204040.781, E-
517782.993

N-2205127.779, E-
511365.471, N-
2205115.575, E-
511441.368
N-2205196.996, E-
510946.595, N-
2205188.125, E-
511005.935

N-2204976.580, E-
512469.260

N-2205388.769, E-
508547.50

N-220538.950, E-
508775.310, N-
2205380.478, E-
508810.485
PROJECT : LAYING & CONSTRUCTION OF STEEL GAS PIPELINE AND TERMINALS ALONG WITH ASSOCIATED FACILITIES FOR SECTION-II (24" x 226.6 KM) FOR MUMBAI NAGPUR PIPELINE
PROJECT (PART A).

BACKFIILING STATUS FOR SPREAD-1 (SECTION-2-A)


Owner : GAIL (INDIA) Limited
Cosultant : MECON LIMITED
Contractor : KALPATARU POWER TRANSMISSION LIMITED
Cumulative
Joint No Joint No Backfilling Backfilling
Sr. No Report No. Date Backfilling Hindrance Remarks
From To (M) pending (M)
(M)
1 BKF-14 20-Dec-21 KM238 M06 KM238 FT15 121.500 121.500 ###
2 BKF-01 12-Nov-21 KM238 M16 KM238 M39 300.290 421.790 ###
3 BKF-14 20-Dec-21 KM238 FT40 KM238 T42 18.990 440.780 ###
4 BKF-01 12-Nov-21 KM238 M43 KM239 M01 520.640 961.420 ###
Heavy Dumper Movement of MSRDC
2 4 961.420 36.000 TIE IN BALANCE
contractor
5 BKF-01 12-Nov-21 KM239 M05 KM239 M23 241.640 1,203.060 ###
6 BKF-15 21-Dec-21 KM239 FT24 KM239 T25 10.010 1,213.070 ###
7 BKF-01 12-Nov-21 KM239 M26 KM240 M02 734.600 1,947.670 ###
BKF-15 21-Dec-21 KM240 FT03 KM240 FT05 24.210 1,971.880 ###
8 BKF-01 12-Nov-21 KM240 M06 KM240 M18 168.330 2,140.210 ###
19 83 2,140.210 780.000
FARMER HINDRANCE AND SPACE
FARMER ISSUE
CONSTRAINT
1 37 2,140.210 444.000
9 BKF-02A 20-Nov-21 KM241 M38 KM241 M59 276.550 2,416.760 ###
10 BKF-28 30-Dec-21 KM241 M60 KM241 M62 48.220 2,464.980 ###
11 BKF-02A 20-Nov-21 KM241 M63 KM241 M78 180.420 2,645.400 ###
12 BKF-15 21-Dec-21 KM241 FT79 KM241 T81 22.670 2,668.070 ###
13 BKF-02 19-Nov-21 KM241 M82 KM242 M42 539.250 3,207.320 ###
43 74 3,207.320 384.000 FARMER ISSUE FARMER ISSUE
14 BKF-19 28-Dec-21 KM242 FT75 KM242 FT79 72.530 3,279.850 ###
15 BKF-22 28-Dec-21 KM242 FT80 KM242 FT80 0.000 3,279.850 ###
16 BKF-19 28-Dec-21 KM242 FT81 KM242 FT83 48.040 3,327.890 ###
17 BKF-22 28-Dec-21 KM243 FT01 KM243 FT01 0.000 3,327.890 ###
18 BKF-20 28-Dec-21 KM243 M02 KM243 M13 156.390 3,484.280 ###
19 BKF-20 28-Dec-21 KM243 FT14A KM253 FT14C TR 38.925 3,523.205 ###

Page 9 of 14
PROJECT : LAYING & CONSTRUCTION OF STEEL GAS PIPELINE AND TERMINALS ALONG WITH ASSOCIATED FACILITIES FOR SECTION-II (24" x 226.6 KM) FOR MUMBAI NAGPUR PIPELINE
PROJECT (PART A).

BACKFIILING STATUS FOR SPREAD-1 (SECTION-2-A)


Owner : GAIL (INDIA) Limited
Cosultant : MECON LIMITED
Contractor : KALPATARU POWER TRANSMISSION LIMITED
Cumulative
Joint No Joint No Backfilling Backfilling
Sr. No Report No. Date Backfilling Hindrance Remarks
From To (M) pending (M)
(M)
20 BKF-22 28-Dec-21 KM243 FT14 KM243 FT14 0.000 3,523.205 ###
21 BKF-22 28-Dec-21 KM243 FT15 TR KM243 FT15A 9.375 3,532.580 ###
22 BKF-21 28-Dec-21 KM243 M16 KM243 M18 47.975 3,580.555 ###
23 BKF-22 28-Dec-21 KM243 FT19 KM243 FT19 0.000 3,580.555 ###
24 BKF-21 28-Dec-21 KM243 M20 KM 243 M29 130.275 3,710.830 ###
25 BKF-23 28-Dec-21 KM243 T30 KM243 FT35 36.350 3,747.180 ###
26 BKF-03 21-Nov-21 KM243 M36 KM244 M33 988.160 4,735.340 ###
27 BKF-15 21-Dec-21 KM244 FT34 KM244 T36 23.470 4,758.810 ###
28 BKF-04 22-Nov-21 KM244 M37 KM245 M24 869.160 5,627.970 ###
29 BKF-15 21-Dec-21 KM245 T25 KM245 FT28 34.630 5,662.600 ###
30 BKF-04 22-Nov-21 KM245 M29 KM245 M46 229.280 5,891.880 ###
31 BKF-16 21-Dec-21 KM245 T47 KM245 FT52 65.340 5,957.220 ###
32 BKF-05 23-Nov-21 KM245 M53 KM245 M81 359.670 6,316.890 ###
33 BKF-16 21-Dec-21 KM245 FT82 KM246 FT4B 76.860 6,393.750 ###
34 BKF-06 27-Nov-21 KM246 M05 KM246 M35 386.590 6,780.340 ###
35 BKF-16 21-Dec-21 KM246 FT36 KM246 FT37 12.110 6,792.450 ###
36 BKF-06 27-Nov-21 KM246 M38 KM246 M50 169.310 6,961.760 ###
37 BKF-16 21-Dec-21 KM246 T51 KM246 T51 0.000 6,961.760 ###
38 BKF-06 27-Nov-21 KM246 M52 KM247 M06 472.310 7,434.070 ###
39 BKF-13 17-Dec-21 KM247 T07 KM247 FT16 107.660 7,541.730 ###
40 BKF-06 27-Nov-21 KM247 M17 KM247 M33 217.760 7,759.490 ###
SV11 and Flyover bridge.. Entry and Exit
34 46 7,759.490 156.000 SV11
to be finalised.
11,560.195 4,260.120 ###
1,685.770
1,624.810

Page 10 of 14
PROJECT : LAYING & CONSTRUCTION OF STEEL GAS PIPELINE AND TERMINALS ALONG WITH ASSOCIATED FACILITIES FOR SECTION-II (24" x 226.6 KM) FOR MUMBAI NAGPUR PIPELINE
PROJECT (PART A).

BACKFIILING STATUS FOR SPREAD-1 (SECTION-2-A)


Owner : GAIL (INDIA) Limited
Cosultant : MECON LIMITED
Contractor : KALPATARU POWER TRANSMISSION LIMITED
Cumulative
Joint No Joint No Backfilling Backfilling
Sr. No Report No. Date Backfilling Hindrance Remarks
From To (M) pending (M)
(M)
14,870.775

FOR KPTL FOR MECON FOR GAIL


Signature

Name
Date

Page 11 of 14
PROJECT: MUMBAI NAGPUR PIPELINE PROJECT PART-A SECTION II Report No.:
CLIENT: M/s GAIL (INDIA) LIMITED Date:
CONSULTANT : M/s MECON LIMITED Section/Spread :
CONTRACTOR : M/s KALPATARU POWER TRANSMISSION LTD. Appendix-2
Format No : MNPL-QC-PRO-15-F-01 Rev.:02

Inspection Report For Lowering


From: KM To: KM Pipe Size, Dia : 24''

Chainage Joint No. Rock Shield Pre-Padding


Section Length in
S.N Holiday Test Installation Length Provided/Not COVER Remarks
From To From To (Mtr.)
(Mtr) Applicable

SAMPLE
Today Previous Till Date
Length in(m)
Lowered

HDPE Duct Coupler Location (If Any) Remarks / Field Problem (If Any)

KPTL MECON/GAIL

Sign.: Sign :

Name: Name :

Date : Date :
Page of
PROJECT: MUMBAI NAGPUR PIPELINE PROJECT PART-A SECTION II Report No.:
CLIENT: M/s GAIL (INDIA) LIMITED Date:
CONSULTANT : M/s MECON LIMITED Section/Spread :
CONTRACTOR : M/s KALPATARU POWER TRANSMISSION LTD. Appendix-3
Format No : MNPL-QC-PRO-15-F-02 Rev.:02

Inspection Report for Post Lowering Survey


CHAINAGE JOINT NO. Pipe Top (DGPS Coordinates)
S.NO. PIPE TOP (RL) NGL(RL) PIPE COVER (M) REMARKS
FROM TO FROM TO NORTH EAST

KPTL MECON/GAIL

Sign.: Sign :

Name: Name :
Date : Date :
Page of