KPTL PL MNPL SEC II ML JP 15 R0 Lowering
KPTL PL MNPL SEC II ML JP 15 R0 Lowering
(24"
x 226.6 KM) FOR MUMBAI NAGPUR PIPELINE PROJECT (PART A).
43 74 3,206.970
N-2205388.769, E-
65 HDPE-032 28-Dec-21 KM243 FT14 KM243 FT14 Mtrs - 3,483.930
508547.50
Page 1 of 14
PROJECT : LAYING & CONSTRUCTION OF STEEL GAS PIPELINE AND TERMINALS ALONG WITH ASSOCIATED FACILITIES FOR SECTION-II (24"
x 226.6 KM) FOR MUMBAI NAGPUR PIPELINE PROJECT (PART A).
N-2204976.580, E-
49 HDPE-022 16-Dec-21 KM247 T07 KM247 FT16 Mtrs 107.660 7,553.105
512469.260
TOTAL 7,770.865
Page 2 of 14
Chainage/Jts Total
Sr. No. Report No. Date UOM
From To Length
1 HDPE-001 11-Nov-21 KM238 M16 KM238 M39 Mtrs 300.29
2 HDPE-001 11-Nov-21 KM238 M43 KM239 M01 Mtrs 520.64
3 HDPE-001 11-Nov-21 KM239 M05 KM239 M23 Mtrs 241.64
4 HDPE-001 11-Nov-21 KM239 M26 KM240 M02 Mtrs 734.6
5 HDPE-001 11-Nov-21 KM240 M06 KM240 M10 Mtrs 168.33
6 HDPE-001A 11-Nov-21 KM238 M06 KM238 M12 Mtrs 96.96
7 HDPE-002 18-Nov-21 KM241 M82 KM242 M42 Mtrs 539.25
8 HDPE-003 19-Nov-21 KM241 M38 KM241 M78 Mtrs 505.19
9 HDPE-004 20-Nov-21 KM243 M36 KM244 M33 Mtrs 988.16
10 HDPE-005 21-Nov-21 KM244 M37 KM245 M24 Mtrs 869.16
11 HDPE-005 21-Nov-21 KM245 M29 KM245 M46 Mtrs 229.28
12 HDPE-006 22-Nov-21 KM245 M53 KM245 M81 Mtrs 359.67
13 HDPE-007 26-Nov-21 KM246 M05 KM246 M35 Mtrs 386.59
14 HDPE-007 26-Nov-21 KM246 M38 KM246 M50 Mtrs 169.31
15 HDPE-007 26-Nov-21 KM246 M52 KM247 M06 Mtrs 472.31
16 HDPE-007 26-Nov-21 KM247 M17 KM247 M33 Mtrs 217.76
17 HDPE-008 29-Nov-21 KM248 M70 KM248 M81 Mtrs 157.34
18 HDPE-008 29-Nov-21 KM248 M57 KM248 M64 Mtrs 107.96
19 HDPE-008 29-Nov-21 KM248 M27 KM248 M36 Mtrs 132.8
20 HDPE-008 29-Nov-21 KM247 M82 KM247 M23 Mtrs 313.78
21 HDPE-008 29-Nov-21 KM247 M71 KM247 M79 Mtrs 121.21
22 HDPE-008 29-Nov-21 KM247 M47 KM247 M66 Mtrs 253.74
23 HDPE-009 1-Dec-21 KM250 M65 KM251 M13 398.31
Mtrs
24 HDPE-010 1-Dec-21 KM238 FT38 KM238 FT15 Mtrs 24.19
25 HDPE-010 1-Dec-21 KM239 FT24 KM239 T25 Mtrs 10.01
Mtrs
Mtrs
48 HDPE-021 16-Dec-21 KM243 M16 KM243 M29 Mtrs 180.55
49 HDPE-022 16-Dec-21 KM247 T07 KM247 FT16 107.66
Mtrs
50 HDPE-023 17-Dec-21 KM242 FT75 KM242 FT83 Mtrs 120.57
51 HDPE-024 18-Dec-21 KM243 M02 KM243 M13 Mtrs 156.39
52 HDPE-025 19-Dec-21 KM243 FT14A KM243 FT14CTR Mtrs 48.35
53 HDPE-026 20-Dec-21 KM238 FT40 KM238 T42 Mtrs 18.99
54 HDPE-027 22-Dec-21 KM253 FT50 KM253 M56 Mtrs 84.865
55 HDPE-028 26-Dec-21 KM229 M01 KM229 M23 Mtrs 287.76
56 HDPE-028 26-Dec-21 KM229 M25 KM229 M27 Mtrs 47.89
57 HDPE-028 26-Dec-21 KM229 M33 KM229 M65 Mtrs 410.235
58 HDPE-028 26-Dec-21 KM229 M67 KM229 M68 Mtrs 36.355
59 HDPE-028 26-Dec-21 KM229 M74 KM229 M77 Mtrs 59.93
60 HDPE-028 26-Dec-21 KM229 M79 KM230 M27 Mtrs 397.88
61 HDPE-029 27-Dec-21 KM248 M39 KM248 M48 Mtrs 133.12
62 HDPE-030 27-Dec-21 KM249 M53 KM250 M18 Mtrs 600.5
63 HDPE-031 27-Dec-21 KM230 M30 KM230 M44 Mtrs 192.94
64 HDPE-032 28-Dec-21 KM243 FT01 KM243 FT0 Mtrs 0
65 HDPE-032 28-Dec-21 KM243 FT14 KM243 FT14 0
Mtrs
65 HDPE-032 28-Dec-21 KM243 FT15TR KM243 FT15A Mtrs 9.375
Mtrs
65 HDPE-032 28-Dec-21 KM247 T80 KM247 FT81 Mtrs 7.24
65 HDPE-033 28-Dec-21 KM234 M71 KM234 M83 Mtrs 167.92
65 HDPE-034 29-Dec-21 KM248 FT24 KM248 FT26 Mtrs 24.22
65 HDPE-035 30-Dec-21 KM247 FT67 KM247 FT70 Mtrs 38.97
65 HDPE-036 30-Dec-21 KM236 M34 KM236 M23 Mtrs 889.66
TOTAL 15715.34
Coupler Location Remarks
KM239 M22
N-2204436.928,E-
516440.653
N-22056775.615,
E-505438.475
N-2204040.781, E-
517782.993
N-2205127.779, E-
511365.471, N-
2205115.575, E-
511441.368
N-2205196.996, E-
510946.595, N-
2205188.125, E-
511005.935
N-2204976.580, E-
512469.260
N-2205388.769, E-
508547.50
N-220538.950, E-
508775.310, N-
2205380.478, E-
508810.485
PROJECT : LAYING & CONSTRUCTION OF STEEL GAS PIPELINE AND TERMINALS ALONG WITH ASSOCIATED FACILITIES FOR SECTION-II (24" x 226.6 KM) FOR MUMBAI NAGPUR PIPELINE
PROJECT (PART A).
Page 9 of 14
PROJECT : LAYING & CONSTRUCTION OF STEEL GAS PIPELINE AND TERMINALS ALONG WITH ASSOCIATED FACILITIES FOR SECTION-II (24" x 226.6 KM) FOR MUMBAI NAGPUR PIPELINE
PROJECT (PART A).
Page 10 of 14
PROJECT : LAYING & CONSTRUCTION OF STEEL GAS PIPELINE AND TERMINALS ALONG WITH ASSOCIATED FACILITIES FOR SECTION-II (24" x 226.6 KM) FOR MUMBAI NAGPUR PIPELINE
PROJECT (PART A).
Name
Date
Page 11 of 14
PROJECT: MUMBAI NAGPUR PIPELINE PROJECT PART-A SECTION II Report No.:
CLIENT: M/s GAIL (INDIA) LIMITED Date:
CONSULTANT : M/s MECON LIMITED Section/Spread :
CONTRACTOR : M/s KALPATARU POWER TRANSMISSION LTD. Appendix-2
Format No : MNPL-QC-PRO-15-F-01 Rev.:02
SAMPLE
Today Previous Till Date
Length in(m)
Lowered
HDPE Duct Coupler Location (If Any) Remarks / Field Problem (If Any)
KPTL MECON/GAIL
Sign.: Sign :
Name: Name :
Date : Date :
Page of
PROJECT: MUMBAI NAGPUR PIPELINE PROJECT PART-A SECTION II Report No.:
CLIENT: M/s GAIL (INDIA) LIMITED Date:
CONSULTANT : M/s MECON LIMITED Section/Spread :
CONTRACTOR : M/s KALPATARU POWER TRANSMISSION LTD. Appendix-3
Format No : MNPL-QC-PRO-15-F-02 Rev.:02
KPTL MECON/GAIL
Sign.: Sign :
Name: Name :
Date : Date :
Page of