Unloading Plant From LCT: Wahana Coal Mine Project ID 205

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 4

Discipline Document Number

Mechanical ID205-JSEA-M&E-002(02)

WAHANA COAL MINE


Department PROJECT Next Revision Date
MAINTENANCE December 2009
ID 205

JSEA

UNLOADING PLANT FROM LCT

APPLICABLE FOR

WAHANA COAL MINE PROJECT

APPROVAL SHEET

Name Title Date Signature


Rudy P Purnama HSEQ Manager
Rodney Fleeton Project Manager
Frans Nugroho Client / KTT

REVISION DETAILS

Rev. Date Revision Status Checked by Initial


01 05-Oct-07 1st Issue Rudi Purnama
02 05-May-09 2nd Issue Rudi Purnama

Paper copies are uncontrolled. The controlled version of this document is on the electronic file at HSEQ Department
Leighton International Limited

JOB SAFETY AND ENVIRONMENTAL ANALYSIS WORKSHEET

Division Office / Project: Maintenance / Wahana Coal Mine Project Tools and or Equipment required: JSEA No: ID205-JSEA-M&E-002(02)

Job Location & Details: BJM Port– Unloading Plant from LCT - Landing Capacity Travel (LCT), Date Prepared:

JSEA Participants: Victor Simbolon, Mick Hulett, Sutrisno - Crane 5 Oktober 2007

      - Excavator PC. 400 Approved by PM:

Responsible Supervisor: Hari Pranoto, Sutrisno - PPE      

            Date:      

Mar 2008 Page 2 of 4 LIL-HSE-FM-001B(01)


Leighton International Limited

JOB STEP HAZARDS IDENTIFIED CONTROLS REQUIRED (Eg. Remove overhead cable or isolate/sheath ACTION BY/RECORD
(Eg. Set Up Crane) (Eg. Electrocution from 11Kv Cables) overhead or monitor with spotter) Training PPE Needs (Eg. Supervisor)
1.1.1. The LCT. Captain have to be directed through a radio communication by
a person in tha bank .
1. LCT. Landed on the Beach 1. Not correct position or too far away
Se seorang yang berada di darat harus mengarahkan Capten LCT.
LCT. Mendarat di atas pasir di Posisi tidak tepat, terlalu jauh Person involve
Melalui Radio komunikasi .
pantai dari jangkauan Pekerja yang terlibat
1.1.2. Waiting for water high tide
Tunggu air pasang untuk mendaratkan LCT di atas pasir di panati

2.1 water high tide 2.1.1. Waiting for water low tide to unload the unit from LCT. Person involve
2. Ramp door lowered down for Pekerja yang terlibat
Ramp door to steep Tunggu air pasang sampai benar benar surut untuk menurunkan unit
Unloading Plant
Air terlalu tinggi
Turunkan ramp door untuk
membongkar muatan Ramp door teralalu curam. 2.1.2. Do not drove off the unit from LCT , if the ramp door is too steep
Unit jangan diturunkan jika posisi ramp door terlalu curam.
Ramp door harus diganjal dengan pasir /kayu agar landai
3.1.1. Only approved and trained personnel is allowed to operate the unit from Person involve
LCT Pekerja yang terlibat
Hanya orang yang telah terlatih yang diijinkan mengoperasikan alat dari
3.1.unskill operator LCT .
Operator tidak competent 3.1.2. Plant have to be inspected prior to start the engine.
Mesin harus dioeriksa sebelum dihidupkan
3. Unloading Excavator 3.2. Interaction with people or other 3.1.3. Operator should directed by other when moving or swinging the
Turunkan excavator Unit, when moving excavator around
Menyenggol orang atau unit saat Operator harus diarahkan oleh orang yang kompeten sebelum bergerak
excavator bergerak dan saat memutar.
3.1.4. Dont standing at front of excavator being is travel on the ramp door,
Dilarang berdiri di depan / belakang excavator sewaktu menuruni ramp
door.

4.1. Crane could not reach the units 4.1.1 whenever possible, the unit to be unloaded so that removed by excavator
as close to the side of the crane.
4. Unloading Pontoon, Lighting in the LCT.
tower, Skid and Geoteg by Jika memungkinkan, alat yang tidak dapat bergerak, supaya dipindahkan
Crane tidak dapat menjangkau ke sisi Crane agar dapat terjangkau
using Crane.
muatan Person involve
Menurunkan Ponton, Lighting Pekerja yang terlibat
4.2 Crane toppled down
tower. Skid dan Geotex 4.1.2. The Crane shall positioned in safe and out riggers shall supported using
menggunakan Crane. Crane terjungkal pad as well.
4.3. Wrong signal or instruction on Posisikan crane sebagaimana mestinya dan out rigger harus
Operator di ganjal
Mar 2008 Page 3 of 4 LIL-HSE-FM-001B(01)
Leighton International Limited

4.1.3. The crane operator only signalled by a Rigger.


Operator Crane hanya boleh diarahkan oleh satu orang rigger
4.1.4. The People who involved in this activities must be trained, explained and
monitored.
Orang yang terlibat dalam pengankatan ini, harus telah terlatih,
mendapat penjelasan dan diawasi.
Aba-aba dan signal tidk tepat ke
4.1.5. All people involved shall immediate away from moving load.
operator
Semua yang terlibat harus dengan segera menjauh dari beban yang
sedang ter angkat.
4.4. Manual handling injury when
4.1.6. No people allowed under load being lifted.
handling lifting gear.
Tidak ada yang boleh berdiri di bawah beban yang sedang diangkat.
Cedera manual handling.
4.1.7. The Load shall not pass over people.
Beban tidak boleh melintas diatas orang.
4.1.8 Do not hold a moving load, use rope..
Jangan memegang langsung beban yang sedang bergerak. Gunakan
tali sebagai penahan.