Republic of the Philippines

Western Philippines University A STRONG PARTNER FOR SUSTAINABLE DEVELOPMENT

ACADEMIC AFFAIRS

Name: ___ _ ____ _ Program/Year/Section: ____ Score: _

FINAL EXAMINATION

CE 100 CIVIL ENGINEERING ORIENTATION

Directions: Choose the correct answer by encircling the letter according to your solution.

1.0 The loads to be carried by the structures given below:

1.1 Which of the following is the reaction at support RG?

A. 94.5 kN C. 95.4 kN
B. 63 kN D. 126 kN
1.2 Which of the following is the reaction at support RA?

A. 94.5 kN C. 95.4 kN
B. 63 kN D. 126 kN

2.0 Given the figure below, the owner hire the service of the civil engineer to estimate the
total cost of the construction of the concrete wall. Estimate requires the concrete and the
excavation excluding the formworks. The foundation is resting on the ground as a free
standing or concrete reinforced fence.

2.1 Which of the following is the volume of excavation?

A. 7.50 cu. m. C. 8.50 cu. m.

B. 8.00 cu. m. D. 9.00 cu. m.


2.2 Which of the following is the volume of the concrete for wall?

A. 2.70 cu. m. C. 2.75 cu. m.


B. 3.00 cu. m. D. 3.10 cu. m.

WPU-QSF-ACAD-14A Rev. 00 (10.02.19)


Republic of the Philippines
Western Philippines University A STRONG PARTNER FOR SUSTAINABLE DEVELOPMENT

ACADEMIC AFFAIRS
2.3 Which of the following is the number of bags of cement for wall?

A. 25 bags C. 27 bags
B. 36 bags D. 30 bags

2.4 Which of the following is the volume of sand for wall?

A. 6.00 cu. m. C. 5.40 cu. m.


B. 3.00 cu. m. D. 1.50 cu. m.

2.5 Which of the following is the volume of the gravel for wall?

A. 6.00 cu. m. C. 5.40 cu. m.


B. 3.00 cu. m. D. 1.50 cu. m.
2.6 Which of the following is the volume of concrete in cu.m. for footing?

A. 6.00 cu. m. C. 5.40 cu. m.


B. 3.00 cu. m. D. 1.50 cu. m.
2.7 Which of the following is the number of bag of cement for footing?

A. 36 bags C. 27 bags
B. 30 bags D. 25 bags
2.8 Which of the following is the volume of sand for wall?

A. 6.00 cu. m. C. 5.4 cu. m.


WPU-QSF-ACAD-14A Rev. 00 (10.02.19)
Republic of the Philippines
Western Philippines University A STRONG PARTNER FOR SUSTAINABLE DEVELOPMENT

ACADEMIC AFFAIRS
B. 3.00 cu. m. D. 1.5 cu. m.
2.9 Which of the following is the volume of the gravel for wall?

A. 6.00 cu. m. C. 5.4 cu. m.


B. 3.00 cu. m. D. 1.5 cu. m.
2.10 Which of the following is the total cost of cement for wall and footing if the
amount of cement per bag is Php 235.00?

A. Php 19,550.00 C. Php 19,035.00


B. Php 12,350.00 D. Php 12,690.00

2.11 Which of the following is the total cost of sand for wall and footing if the amount
of sand per cu.m. is Php 2350.00?

A. Php 10,575.00 C. Php 14,100.00


B. Php 12,350.00 D. Php 12,500.00
2.12 Which of the following is the total cost of gravel for wall and footing if the amount
of gravel per cu.m. is Php 2100.00?

A. Php 18,900.00 C. Php 14,700.00


B. Php 12,350.00 D. Php 12,500.00

2.13 Which of the following is the total cost of the project?

A. Php 31,195.00 C. Php 39,890.00


B. Php 35,495.00 D. Php 48,510.00
2.14 Which of the following is the unit cost of the project?

A. Php 3944.00 per cu. m. C. Php 4432.00 per cu. m.


B. Php 5390.00 per cu. m. D. Php 3466.00 per cu. m.

Part II. Definition: Answer the question by filling the underline.

1.1 a document prepared during key milestones or near the end of a


construction project listing work not conforming to contract specifications that the
general contractor must complete prior to final payment.
1.2 ______________ is a form of energy generated by friction, induction or chemical
change, having magnetic, chemical and radiant effect
1.3 the final construction phase of the project lifecycle. It is the
collecting of final project documents (sometimes referred to as project deliverables),

WPU-QSF-ACAD-14A Rev. 00 (10.02.19)


Republic of the Philippines
Western Philippines University A STRONG PARTNER FOR SUSTAINABLE DEVELOPMENT

ACADEMIC AFFAIRS
assembling them into a package, and ultimately presenting that package to the client
that requested the project be built.
1.4 Is the identification, assessment, and prioritization of risks
followed by coordinated and economical application of resources to minimize,
monitor, and control the probability and/or impact of unfortunate events or to
maximize the realization of opportunities.
1.5 _________________________is the act of planning, organizing and
overseeing the various tasks involved in a construction project. It is performed by
individuals known as project managers, who represent the builder or contractor hired
to perform work.
1.6 _____________________ suitable for most subsoils except loose sand, loose
gravels and filled areas.
1.7 _____________ is made up of a group of interrelated work activities constrained
by a specific scope, budget, and schedule to deliver capital assets needed to achieve the
strategic goals of an agency.
1.8 ________________ Influencing factors that reduce or eliminate negative risks
and increase or cause opportunities.
1.9 ______________________________ A safety work orientation to be
conducted by the third party prior to deploy the workers on site.
1.10 __________________ Monitoring of work progress from day to day activities as
per schedule of work.
1.11 _______________ an official approval issued by the local government agency
that allows you or your contractor to proceed with a construction or remodeling project
on your property.
1.12 ________________ deals with planning of positions/layout of different elements
and design (determination of size, shape and material) of component such that safety
and serviceability requirements are not sacrificed, yet economy is considered.
1.13 _______________ law of elasticity which states for relatively
small deformations of an object, the displacement or size of the deformation is directly
proportional to the deforming force or load.
1.14 __________ those members that are subjected to axial tension forces only. Load is
applied to ties only at the ends. Ties cannot resist flexural forces.
1.15 ___________ is a brittle form of iron which is weaker in tension than in
compression.
1.16 ___________ is a non-linear, non-elastic and brittle material. It is strong in
compression and very weak in tension.
1.17 ________________ is a strategy for conveying important information to your
target audience.
1.18 ________________ Is the identification, assessment, and prioritization of risks
followed by coordinated and economical application of resources to minimize,
monitor, and control the probability and/or impact of unfortunate events or to
maximize the realization of opportunities.
1.19 ______________ a soft, lightweight, malleable metal,has about one-third the
density and stiffness of steel. It is ductile, and easily machined, cast, and extruded.
Corrosion resistant is excellent due to thin surface layer.
WPU-QSF-ACAD-14A Rev. 00 (10.02.19)
Republic of the Philippines
Western Philippines University A STRONG PARTNER FOR SUSTAINABLE DEVELOPMENT

ACADEMIC AFFAIRS
1.20 ___________ is used to describe a variety of formations consisting of separate,
inert objects bonded together by some binding joint filler.
1.21 ____________ represent the widest variety of usage in building construction. The
great variation of material content, properties, and formation processes yields an
unlimited field for the designer’s imagination.
1.22 __________ that is, sheet material of basically rag or wood fiber content—is used
considerably in building construction, although for some uses it has been replaced by
plastics.
1.23 _______________________ are those engineered to withstand various types
of hazardous earthquake exposures at the sites of their particular location.
1.24 ____________ used to strengthen paper, plastic membranes, and various panel
materials.

Prepared by: