I. PEKERJAAN PERSIAPAN
A PEK. TANAH
1 Galian tanah Pile Cap m3 202.50 48,320.00 9,784,800.00
2 Urugan tanah kembali m3 178.50 17,640.00 3,148,740.00
3 Urugan & pemadatan tanah m3 774.59 86,200.00 66,769,227.00
4 Urug pasir bawah lantai t. 5 cm m3 43.03 213,840.00 9,202,069.80
5 Urug pasir bawah pile cap & sloof t. 5 cm m3 15.68 213,840.00 3,353,011.20
Jumlah A 92,257,848.00
B PEK. PONDASI
1 Pondasi Sumuran ttk 40.00 8,000,000.00 320,000,000.00
2 Pile cap (100x100x60cm) m3 24.00 4,372,370.00 104,936,880.00
3 Pedestal m3 7.20 4,372,370.00 31,481,064.00
4 Lantai Kerja t. 5 cm m2 2.00 800,000.00 1,600,000.00
Jumlah B 458,017,944.00
C.2 Lantai 2
1 Kolom Praktis m3 1.12 3,944,580.00 4,417,929.60
2 Balok Latei m3 0.85 3,944,580.00 3,352,893.00
3 Plat lantai t. 12 cm m3 103.28 4,614,150.00 476,540,183.70
484,311,006.30
C.3 Lantai 3 -
1 Kolom Prakis m3 0.95 3,944,580.00 3,747,351.00
2 Balok Latei m3 0.85 3,944,580.00 3,352,893.00
3 Plat Lantai 12 cm m3 103.28 4,614,150.00 476,540,183.70
483,640,427.70
Jumlah C 1,192,454,136.40
Jumlah A 1,025,321,567.00
B PEK. LANTAI
B.1 Lantai 1
1 Kramik 40 x 40 m2 651.75 136,220.00 88,781,385.00
2 Kramik 20 x 20 m2 49.90 175,000.00 8,732,500.00
3 Kramik Tangga m2 40.00 175,000.00 7,000,000.00
104,513,885.00
B.2 Lantai 2
1 Waterproofing MU 600 m2 40.90 127,630.00 5,220,067.00
3 Kramik 40 x 40 m2 819.75 136,220.00 111,666,345.00
4 kramik 20 x 20 m2 40.90 175,000.00 7,157,500.00
5 Kramik Tangga m2 40.00 175,000.00 7,000,000.00
131,043,912.00
B.3 Lantai 3 m2
1 Waterproofing MU 600 m2 40.90 130,820.00 5,350,538.00
2 Kramik 40 x 40 m2 819.75 136,220.00 111,666,345.00
4 Kramik 20 x 20 m2 40.90 175,000.00 7,157,500.00
124,174,383.00
Jumlah B 359,732,180.00