1. ALL PLUMBING WORKS AND INSTALLATION HERIN SHALL BE DONE IN ACCORDANCE WITH THE PROVISIONS
OF THE NATIONAL PLUMBING CODE OF THE PHILIPPINES, NATIONAL PLUMBING CODE, AND EXISTING LOCAL ORDINANCES
2. BEFORE PERFORMING ANY WORK, CONTRACTOR SHALL THOROUGHLY EXAMINE ALL EXISTING CONDITIONS,
POINTS OF CONNECTIONS, SIZES DEPTHS, SLOPES, LOCATIONS, ETC.
3. COORDINATE THESE DRAWINGS WITH OTHER RELATED DRAWINGS AND SPECIFICATIONS, THE ARCHITECT OR ENGINEER
SHALL BE NOTIFIED IMMEDIATELY OF ANY DICREPANCY FOUND THEREIN, HIS OR HER DECISION SHALL BE FINAL.
4. SOIL, WASTE, DRAIN AND VENT PIPES AND FITTINGS SHALL BE POLYVINYL CHLORIDE m. (PVC) SCHEDULE 40.
5. WATER SUPPLY PIPES SHALL BE GALVANIZED IRON PIPES (GIP) SCHEDULE 40.
7. PLUMBING SYSTEM SHALL BE PROPERLY TENTED AND APPROVED BY PROPER AUTHORITIES PRIOR TO COVERING.
8. ALL WORKS HEREIN SHALL BE DONE UNDER THE DIRECT SUPERVISION OF A DULY REGISTERED SANITARY ENGINEER OR MASTER PLUMBER.
CB
L=600mm
Minimum
L=0.15+ OF
PIPE+.15 PVC Storm
300 300
Drain Pipe
300
L=0.15+ OF
L=600mm
PIPE+.15
OUTLET
Minimum
INLET
600
4 - 10 mm BARS 12mm Lifting Handle
BOTHWAYS
300
4” Thick CHB
Single Facing Finish
INLET
OUTLET
300
300 300
LAV
WC WC
LAV
WC
LAV
SHO
SHO
LAV
WC
HB
WC 20mm PPR PIPE PN - 20
TO EXISTING WATER LINE LAV
GLOBE VALVE
SD SD
WC
CO
LAV
WC
LAV
CO
FD
WC FD
LAV CO SD
CO
LAV SD
CB
WC
FD
CB
CB
LAV
FD CO
WC
FD
FD
KS
CO
CB
CB
WC
LA CO
V SD
WC
CO LA
V
FD
FD
KS
CO
WC
LA FD
VC
O
SD
C
LA O
V
WC
SD
FD
WC
CO LA
V
FD
FD
Outlet
2000
500
500
CO CO
Manhole Manhole
500 500
150
2000 1500
500 500
Inlet Outlet
300
Air space
LEACHING CHAMBER
DIGESTIVE CHAMBER
300
BARS
200
200
10 mm bars
400
SEPTIC TANK SECTION
SCALE: 1:20