h2(mm)
h3(mm)
h4
h5
h6a
h6b
h7
h8
valeur de comparaison change units to
gas phase
liquid phase
Calculation parametre
General requirements
hold up time must be 1 to 2minutes, with hs > 150 if LSHH is required and h5 = 0 otherwise
hold up time must be 1 to 2minutes, with h7 > 200 if LSLL is required and h7 = 0 otherwise
hold up time between the LSLL and the outlet must be enough to shutdown the pump or close or the SDV (about 1s per inch of outlet diame
se title
erating conditions
operating temperature °c 65.0
amblet pressure bar abs 1.000
operating pressure bar g 0.000
pressure safety valve discharging to flare network
Design pressure 2.000
bar g
s phase
gas phase name air with pentane
gas mass flowrate kg/h 19210
gas density at operating conditions kg/m3 1.22
gass volumic flowrate at operating conditions m3/h 15745.902
uid phase
liquid phase name water
liquid mass flowrate kg/h 230.0
liquid density at operating conditions kg/m3 1000.00
liquid volumic flowrate at operating conditions m3/h 0.230
Design requirements
lculation parametre
Click on the button modify calculation parameters parameters
neral requirements
Head type Ellipsiodal
Valeur Minimale ratio(L/D) 2
Valeur Maximale ratio(L/D) 4
s Section requirements
Demister wire mesh pad
hydrocarbon deposit
souders & brown kfactor m/s 0.08
gas flowrate margin % 0
minimal vessel internal diameter mm 16.3928716507586
slug capacity
from flow assurance data (specific E&P) m3
(ID)
LSHH
LAH
NLL
LAL
LSLL
design
65.0
1.000
0.000
flare network QmT(kg/h) 19440.00
2.000
QvT(m3/h) 15746.13 qvt(m3/s) 4.37392546
mv(kg/m3) 1.23
ir with pentane
19210 V(m/s) 28.460256419
1.22
15745.902 d 0.0467818081 vg
2.28899577
water
230.0
1000.00
0.230
parameters
Ellipsiodal
2
4
0.08
0 vg
16.3928716507586 2.072
qtv
4347.82616
qt
1.450
0.0003335
1000
3750
1.5
h1(mm) elipsoidale head (mm)
h1=100 si(ID)<ou=1200
h2=600 si1200< (ID) <1200
h1=0,15*ID si (ID)>4000
hemisphérique heads
h1=150
whitout demister with wire mesh
h2=100 for no hc deposit
h2=0
h2(mm) h2=150 for hc deposit
h3(mm) h1+h2=0,15*5(ID) with h3=300+ d/2 si (ID)<900
900<h1+h3<1800 h3=max(0,5*(ID),450+d/2
si (id)>900