1.     SCOPE OF WORK   This work shall consist of laying and compacting well-graded material on
prepared subgrade in accordance with the requirements of Specifications. The Grades-V material shall
be laid in one layer as sub-base. Lying shall be done as per cross sections shown on the drawings or as
directed by the Engineer.   2.     MATERIALS   The material to be used for the work shall be crushed stone
& river sand. Proportion is depending upon the grading required. The material shall be free from organic
or other deleterious constituents and conform to grading .   1.1.   Physical requirements. Ø     The
material passing 4

READ MORE

CALIBRATION OF RAPID MOISTURE METER (RMM)


By Tapas Kumar Sarkar - August 13, 2020

  CALIBRATION OF RAPID MOISTURE METER (RMM) REF. CODE- IS:2720 Part-2 ·          Rapid moisture
meter (RMM) is most popular equipment for quick determine the moisture content of soil and fine
aggregate in construction fields. ·          The RMM can be determine moisture content very quick within 5
minutes, up to 50% or 25% as per capacity of RMM. ·          But there are different between actual
moisture content & RMM value most of the cases, that’s why we need to be compare RMM reading
with actual moisture.   Working Principal Calcium Carbide (CaC2 ) reacted with Water (Moister in test
sample) and produce gas. This gas