Detailed Syllabu Ssubstaiion Design

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 10

Rewaq Ousha Educational Institute

Contact us: Phone +971509299799, Web: www.rewaqousha.com , Email id:info@rewaqousha.com


|An Award Winning Electrical System Design Course | Substation Design | ETAP

REWAQ provides an award winning online Electrical Power System Installation Design training program, Electrical
Power System design training syllabus is designed by T &D expert’s followings international guidelines. And
covering all aspect from bidding to > Energizing of Electrical System

Training Program classes: Design course classes is conducted online by ZOOM/Microsoft team and delivered by digital
whiteboard, by reference of site picture, 3D Drawings and videos.
Syllabus Overview with case study : Total-22 Modules divided in below parts & Covering all aspect of Electrical Power System.

Part-1: Electrical Power System Design -Substation Design + Transmission Line + AUTOCAD software + DIALUX software
Part 2: Electrical Power System Project Engineering
Part 3: Electrical Power System Cost Estimation
Part-4: Electrical System Studies Software – ETAP
Part 5: Electrical Power System reference study materials after training
Class Timing- 9 pm to 11 PM,
Duration- 3 to 3.5 months,
Classes: Weekdays (3 Days in week)
Standards (IEC & IEEE), calculation sheets, Drawings softcopy & complete project report will be provided to all participants
Followed by competency certificate for design training in the END

Contact us: Phone +971509299799, Web: www.rewaqousha.com, Email id:info@rewaqousha.com


Rewaq Ousha Educational Institute
Contact us: Phone +971509299799, Web: www.rewaqousha.com , Email id:info@rewaqousha.com
MODULE#1- Introduction: Process From Tendering To Energizing & make listing Of all
Construction Drawings needs at site
Download the live tender from utility company websites or selection of a project for detail designing
 Study of process involved for construction of a substation project from Bidding > to Energizing and handover to client
 Study of Engineering Design Process
 Discussion how to start Design work and how to study the input tender specifications/ contract specification

 Study of construction drawings & documents list to be required for making any substation.
 Electrical power system networks -substations, transmission line & distribution line.
 Type of Substation, why substation required & Process involved for assessments for new substation or switchyard
 Listing of applicable standards: - International (IEC, IEEE) guidelines for substation designing
 Study of design Basis Report (DBR) for any renewable Solar & Wind power plant substations
 Selection of Electrical system design parameters

Module#2 - ELECTRICAL EQUIPMENTS SELECTION & SIZING CALCULATIONS/CASE STUDY


 Lightning/surge arrestor -Selection parameters, Sizing/Rating calculation, Vendor drawing review & comments
 Current & Voltage transformer -Selection parameters, Sizing calculation, Vendor drawing review & comments
 Wave trap/line trap, power-line carrier communication requirement(PLCC), OPGW- OLTE equipment
 Isolator & Earth switch requirements - Selection, Sizing calculation, Vendor drawing review & comments
 Circuit Breaker (VCB & SF6) - Selection parameters, Sizing calculation, Vendor drawing review & comments
Preparation of purchase order specification(POS) or enquiry spec. for purchase of equipment’s from vendor (*new)

Module#3- SINGLE LINE DIAGRAM (S.L.D) – For GRID, SOLAR & WIND SUBSTATION (AIS)
 Selection of bus bar scheme for substation voltage 11kv,33kv,66kv,110kv,132kv,220kv,400kv & 765kv

Contact us: Phone +971509299799, Web: www.rewaqousha.com, Email id:info@rewaqousha.com


Rewaq Ousha Educational Institute
Contact us: Phone +971509299799, Web: www.rewaqousha.com , Email id:info@rewaqousha.com
→ Single bus bar, Main & transfer, Double main, Double main & transfer, One & half breaker bus bar schemes
 Substation switching scheme study
 Substation Single Line Diagram preparation for 11kV,33 kV,66 kV,110 kV,132 kV,220 kV,400 kV & 765 kV level

Module#4- SINGLE LINE DIAGRAM (S.L.D) FOR GAS INSULATED SUBSTATION (GIS)
 GIS Main switching SLD preparation for 11kV,33 kV,66 kV,110 kV,132 kV,220 kV,400 kV,765 kV Voltage level.
 Comparison between - Indoor switchgear SLD ,AIS SLD & GIS SUBSTATION SLD

Module#5- CABLE SELECTION, SIZING CALCULATION & INSTALLATION DRAWING/CASE STUDY


Training class based on IS 1554, IS7098, IS 1255, International rules IEC60502-1
 Types of Cables, Construction of Cable, Components of cable & Code for designating cable components
 Power Cables: Selection and technical Specification
 HT & LT Cable Sizing Calculation
(Minimum cable size as per fault current & full load current value, Installed cable current rating calculation, Voltage Drop
Calculation, number of cables per phase calculation, Cable Impedances)
 Cable installation method (underground, cable trench & cable tray) at site & Selection of permissible bending radius
 Cable trench layout drawing preparation

Module#6- OVERALL SITE INSTALLATION LAYOUT DRAWING PREPARATION OF SUBSTATIONS


Training classes based on International rules IEC 61936 guidelines from 11kV to 765 KV
 Electrical installation clearances (Ground Clearance, Phase to Phase Clearance, Phase to Earth & Safety Clearance)

Contact us: Phone +971509299799, Web: www.rewaqousha.com, Email id:info@rewaqousha.com


Rewaq Ousha Educational Institute
Contact us: Phone +971509299799, Web: www.rewaqousha.com , Email id:info@rewaqousha.com
 AIS Substation layout plan & elevation section layout drawing preparation

 Control room building layout


 Estimation of Substation Plot Land Area Requirements, standard road width inside of the substation
 Substation material sizing (equipment support structure & transformer burn oil pit)

Module#7- EARTHING CALCULATION,DRAWING & EQUIPMENT EARTHING BY IEEE/CASE STUDY


Training classes based on International rules IEEE-80-2000
 What is Earthing & Why required for electrical equipment’s, difference in Earthing & Grounding, Type of earthing
 Earthing method for Power Plants Industries & Buildings & Earthing method for Substations or Switchyard
 EARTHING CALCULATION FOR SUBSTATION OR SWITCHYARD
(Calculation Of minimum earthing conductor Size, Tolerable & Acceptable Touch & Step Voltage calculation, Grid
Resistance Calculation, Grid Current Calculation & GPR calculation by using IEEE-80 standard method)
 Overall substation earthing layout drawing preparation, and equipment earthing drawings: TR. Towers, CT/PT, CB, LA,

 Earthing calculation for industry, building & power plant (earthing conductor sizing calculation, number of earth pit)

Module#8- ELECTRICAL INSTALLATION LIGHTNING PROTECTION CALCULATION /CASE STUDY

Contact us: Phone +971509299799, Web: www.rewaqousha.com, Email id:info@rewaqousha.com


Rewaq Ousha Educational Institute
Contact us: Phone +971509299799, Web: www.rewaqousha.com , Email id:info@rewaqousha.com
 Study on why lightning protection is required & what is the meaning of lightning protection

 Direct stroke lightning protection calculation (DSLP) for electrical installations by IEEE 998,

 Razvig equation method & IEC 62503 Rolling sphere method

 Lightning protection drawing preparation

Module#9- TRANSFORMER SELECTION, SIZING & PROTECTION /CASE STUDY

 Selection of Transformers
(two winding transformer, three winding transformer & auto transformer requirement of tertiary winding in transformer)
 Reactor (series & shunt) use in substations
 Transformer cooling type study through ETAP
 Transformer vector group presentation selection of vector group
 Standard Practice for selection of transformer % impedance,
 Industrial Practice for selection of Transformer rating from 11KV to 765 KV.
 Transformer sizing & Transformer name plate data study
 Transformer protection against external & internal faults, difference b/w REF & Differential protection
 Transformer vendor drawing review & comments for approval for manufacturing of transformer
 Study of transformer inspection check list required for factory inspection (FAT)

Module#10- LIGHTING DESIGN

Contact us: Phone +971509299799, Web: www.rewaqousha.com, Email id:info@rewaqousha.com


Rewaq Ousha Educational Institute
Contact us: Phone +971509299799, Web: www.rewaqousha.com , Email id:info@rewaqousha.com
 Lux level selection for electrical installations.
 Fixture quantity calculation for control room building - By using DIALUX SOFTWARE
 Lighting drawing preparation
Module#11- DESIGN AND ENGINEERING OF TRANSMISSION & DISTRIBUTION LINE
 Choice of Route of transmission line, Overhead transmission line Clearance, Use of Ground wire in Overhead
 Selection and sizing of transmission line conductors (AAC, AAAC & ACSR).
 Disc Insulator quantity calculation for transmission line to check the transmission line voltage level
 Sag & Tension calculation, wind force calculation on conductors
 Pole mounted distribution substation study
Module#12- Substations + Transmission lines + Feeders Protection
 Protection relay & metering SLD preparation from 11kV to 765 kV substations
 Selection on Protective relays for distribution feeders 11kV & 33kV
 Selection on Protective relays for transmission lines from 66 kV to 765kV
 Discussion on distance relays, and comparison in overcurrent & distance relay.
 Comparison in different communication protocol: IEC 61850, IEC 60870-5-101, IEC 60870-5-103 IEC 60870-5-104, OPC
Protocol, Modbus RTU, Modbus TCP/IP, Ethernet Switch, FO
 Standard Protection relay selections for Power Transformer
 Standard relay selections for electrical bus bar & bus coupler/bus sectionalize bay
 Control Relay & Panel (CRP) drawing review & Cable schedule preparation
Module#13- Substation Emergency Supply Source Sizing Calculation/Case Study
 Battery selection & sizing calculation
 Battery charger sizing calculation

Contact us: Phone +971509299799, Web: www.rewaqousha.com, Email id:info@rewaqousha.com


Rewaq Ousha Educational Institute
Contact us: Phone +971509299799, Web: www.rewaqousha.com , Email id:info@rewaqousha.com
 DG sizing calculation

MODULE#14- PROJECT DESIGN ENGINEERING DRAWINGS PREPARATION

Preparation of site construction engineering drawing for a live project by participants (tender shall be provided by us
during training)
1) SLD, 2) Protection SLD,
3) Overall electrical installation layout,
4) Earthing layouts
5) Lightning Protection Layout

Part Part-2: Electrical Power System Project Engineering

Module#15- PROJECT ENGINEERING

 Preparation of substation equipment purchase order specification or enquiry specification


 Study on review method for vendor commercial offer
 Study on technical comparison sheet preparation on substation equipment vendor offer
 Study on commercial comparison sheet preparation on substation equipment vendor offer

Part-3: Tender Engineering Module


Module#16- Project Major Equipment Quantity Estimation (Tender Engineering)
 Preparing the major equipment bill of quantity for a substation/switchyard project
 Preparing the erection hardware equipment bill of quantity for a substation project

Contact us: Phone +971509299799, Web: www.rewaqousha.com, Email id:info@rewaqousha.com


Rewaq Ousha Educational Institute
Contact us: Phone +971509299799, Web: www.rewaqousha.com , Email id:info@rewaqousha.com
Part-4: Electrical system Studies Software –ETAP study
MODULE#17- ETAP SOFTWARE INTRODUCTION
 Introduction to all Power system analysis software’s widely used in electrical power system industries.
 How to get started with ETAP, Creation of New Project in ETAP, and Familiarization of ETAP tool bars.
 Modeling of major electrical equipment (Transformer, Circuit breaker, CT/PT, electrical bus, Transmission line and Cables)
 Creation of Single line Diagrams / one line View (OLV) and assign rating of components in SLD & ETAP report generation

MODULE#18- ETAP LOAD FLOW ANALYSIS, CAPACITOR BANK SIZING, & REACTOR SELECTION

 Types of loads, Constant Impedance(Z), Constant Current (I) & Constant Power (P) discussion

 Load Flow Fundamental’s & Objective

 Electrical load flow or Power Flow analysis by using ETAP software

 Capacitor Bank sizing by ETAP for power factor correction

 Ferranti effect simulation with ETAP & Reactor sizing for long transmission line to avoid Ferranti effect

MODULE#19- ETAP SHORT CIRCUIT CURRENT/FAULT CURRENT CALCULATION

 Type of Short circuit currents

 Short circuit Fundamental’s

 Short Circuit Current Calculation/ Fault current calculation

Contact us: Phone +971509299799, Web: www.rewaqousha.com, Email id:info@rewaqousha.com


Rewaq Ousha Educational Institute
Contact us: Phone +971509299799, Web: www.rewaqousha.com , Email id:info@rewaqousha.com
MODULE#20- ETAP RELAY COORDINATION

 Protection and coordination analysis Fundamental’s

 Protection overcurrent relay coordination & circuit breaker tripping sequence coordination

Part-5: Substation Reference Materials After Training

MODULE#21- Practical Training Report for Complete Substation Projects to Study as Reference

MODULE#22- Study, Analysis And Suggesting Measures Report On Failure Of Power & Control Cables

MODULE#23- Study, Analysis And Suggesting Measures Report On Failure Of Power Transformer

MODULE#24- Technical Bid Evaluation Report For Power Transformer

MODULE#25- Substation Guideline Manuals For Erection, Commissioning & Pre- Commissioning Check List

“ELECTRICAL SOFTWARES + DETAIL DESIGN + COST ESTIMATION +PROJECT ENGINEERING”


We provide all required training materials as below during training classes:
1) Electrical Equipment’s selection IS ,IEC Guideline & IEEE Guidelines
2) CEA & CBIP design manuals.
3) Design Calculation original excel sheets for practice
4) Related Auto Cad drawing for practice
5) Classes notes , PPT & class recordings for future revision

Contact us: Phone +971509299799, Web: www.rewaqousha.com, Email id:info@rewaqousha.com


Rewaq Ousha Educational Institute
Contact us: Phone +971509299799, Web: www.rewaqousha.com , Email id:info@rewaqousha.com
This is best training program for the electrical engineers in which we discuss in detail about electrical software’s, detail
design engineering and project engineering by involving in real project design. Along with above we also cover
electrical system design engineering program for POWER HOUSE (33KV / 11KV), DISTRIBUTION SUBSTATION (220 /
132 KV /33 KV / 11 KV) GRID SUBSTATION (765kV/400KV/220 KV), SOLAR & WIND SUBSTATION,

 Work with us on Tender Project (Running) during training classes


 Covering International method for design engineering that’s helps for MNCs companies job
 Attend live Online classes by Digital White Board & Digital pen
 keep continue your present job & start preparing yourself for design engineering Skills
 12+ years experienced industries expert mentor

# BE ELECTRICAL SYSTEM DESIGN EXPERT#

Contact us: Phone +971509299799, Web: www.rewaqousha.com, Email id:info@rewaqousha.com

You might also like