Download as pdf or txt
Download as pdf or txt
You are on page 1of 18

01

Minggu 07
Contoh Soal

Mohammad Farid
Fakultas Teknik Sipil S.T., M.T., Ph.D.
dan Lingkungan
SI2131 Mekanika Fluida dan Hidraulika
Fakultas Teknik Sipil dan Lingkungan

EDUNEX ITB
Persamaan Bernoulli
• Piezometric tubes are tapped into a
venturi section as shown in the figure. The
liquid is incompressible. The upstream
piezometric head is 1 m, and the
piezometric head at the throat is 0.5 m.
The velocity in the throat section is twice
large as in the approach section. Find the
velocity in the throat section.

EDUNEX ITB
Persamaan Bernoulli
• A open tank filled with water and drains through a
port at the bottom of the tank. The elevation of the
water in the tank is 10 m above the drain. The drain
port is at atmospheric pressure. Find the velocity of
the liquid in the drain port.

EDUNEX ITB
Tekanan di Pipa
A horizontal pipe carries cooling water at
10°C for a thermal power plant from a
reservoir as shown. The head loss in the
pipe is
𝐿 2
0.02( )𝑉
ℎ𝐿 = 𝐷
2𝑔
where L is the length of the pipe from the
reservoir to the point in question, V is the
mean velocity in the pipe, and D is the
diameter of the pipe. If the pipe diameter is
20 cm and the rate of flow is 0.06 m3/s,
what is the pressure in the pipe at L 2000
m. Assume α2 = 1.
EDUNEX ITB
Pompa
• A pipe 50 cm in diameter carries
water (10oC) at a rate of 0.5 m3/s. A
pump in the pipe is used to move
the water from an elevation of 30 m
to 40 m. The pressure at section 1 is
70 kPa gage and the pressure at
section 2 is 350 kPa gage. What
power in kilowatts and in
horsepower must be supplied to the
flow by the pump? Assume hL = 3 m
of water and α1 = α2 = 1.

EDUNEX ITB
Turbin
• At the maximum rate of power
generation, a small hydroelectric
power plant takes a discharge of 14.1
m3/s through an elevation drop of 61
m. The head loss through the intakes,
penstock, and outlet works is 1.5 m.
The combined efficiency of the
turbine and electrical generator is
87%. What is the rate of power
generation?

EDUNEX ITB
Diagram Moody

EDUNEX ITB
Aliran Pipa 1
• Pipa baja mempunyai panjang 2000 m
dengan diameter 200 mm
mengalirkan air pada 200C antara dua
reservoir, seperti pada gambar.
Perbedaan tinggi muka air antara
reservoir dijaga pada 50 m. Tentukan
debit yang melalui pipa. Abaikan
kehilangan minor.

EDUNEX ITB
Aliran Pipa 1
Tinjau datum pada tinggi muka air reservoir kedua. Terapkan persamaan energi
pada titik 1 dan 2
 p1 V12   p2 V22 
 + + z1  =  + + z2  + H L
  2g    2g 
(0 + 0 + 50) = (0 + 0 + 0) + H L
H L = 50 m
Untuk pipa komersial, = 2 10 −4 ft atau 4,6 10 −2 mm , jadi  / d = 4,6 10 −2 / 200 = 2,3 10 −4
Dari diagram Moody, didapat f = 0,014

EDUNEX ITB
Aliran Pipa 1
Untuk coba pertama, asumsi bahwa f = 0,014.
fL V 2  2000  V 2 
HL = → 50 = (0,014 )   V = 2,65 m / det
d 2g  0,2  2  9,81 
Pada suhu 200 C,  = 1,02 10 −6 m 2 / det
Vd 2,65  0,2
Re = = = 5, 2  10 5

 1,02 10 −6
Untuk pipa komersial, Re = 5,2 105 dan  / d = 2,3 10 −4 , dari diagram Moody nilai f
adalah 0,016

EDUNEX ITB
Aliran Pipa 1
Hitung kembali V untuk f yang dikoreksi = 0,016
fL V 2  2000  V 2 
HL = → 50 = (0,016 )   V = 2,48 m / det
d 2g  0,2  2  9,81 
Revisi Re = Vd = 2,48  0,−26 = 4,9 105
 1,02 10
Untuk Re = 4,9 x 105 dan  / d = 2,3 10 −4 , dari diagram Moody, f = 0,016. Karena
nilai f sama dengan asumsi, tidak perlu dikoreksi lagi.

Jadi: V = 2,48 m / det Q = AV = (0, 2 )2
(2,48) = 0,078 m3 / det
4

EDUNEX ITB
Aliran Pipa 2 p1
p1

p2

p2
1

z1
H1

p3
2

z2
p3
3
J zJ +
pJ

zJ
z3

Datum EDUNEX ITB


Aliran Pipa 2
Pada gambar diberikan data-data: L1 = 200 m, d1 = 300 mm, / d1 = 0, 0002 , z1 = 700 m,
p1 = 7 atm; L2 = 300 m, d2 = 350 mm,  / d 2 = 0,00015 , z2 = 400 m, p2 = 2 atm; L3 = 400
m, d3 = 400 mm, , z/ 3d 3==100 m, p3 = 3 atm. Fluida adalah air dengan  =Tentukan
0,0001 0,113 10 −5 besar
m 2 / det
Tentukan besar aliran masing-masing pipa. Pada permukaan air laut tekanan 1 atm
= 101,325 kPa
Solusi:
Hitung H1, H2, dan H3
H1 = z1 +
p1
= z1 +
(7 )( patm )
= 700 +
(7 )(101325 )
= 772,3 m
  9806

H 2 = z2 +
p2
= 400 +
(2)(101325) = 420,7 m
 9806

H 3 = z3 +
p3
= 100 +
(3)(101325) = 131 m
 9806
EDUNEX ITB
Aliran Pipa 2
Selanjutnya asumsikan HJ = 380 m. Gunakan persamaan kontinuitas untuk
pengujian. Selanjutnya kehilangan head antara reservoir 1,2, dan 3 terhadap titik J.
 200  V12   300  V22   400  V32 
(hL )J 1 = (772,3 − 380) = f1    (hL )J 2 = (420,7 − 380 ) = f 2    (hL )J 3 = (380 − 131) = f 3   
 0,3  2 g   0,35  2 g   0,4  2 g 
Dari diagram Moody estimasi f1 = 0,014, f2 = 0,013, dan f3 = 0,012, selanjutnya
kecepatan dan debit dapat ditentukan
   0,32 
V1 = 28,72 m / det Q1 = V1 A1 = (28,72 )  = 2,03 m3 / det
 4 
   0,352 
V2 = 8,465 m / det Q2 = V21 A2 = (8,465)  = 0,814 m3 / det
 4 
   0,4 2 
V3 = 20,18 m / det Q3 = V3 A3 = (20,18)  = 2,536 m3 / det
 4  EDUNEX ITB
Aliran Pipa 2
Terlihat bahwa (Q1 + Q2) > Q3 , untuk estimasi kedua, besar HJ = 400, dan
menggunakan faktor friksi yang lebih akurat dengan menggunakan formulasi
bilangan Reynolds, Re

Re1 =
V1d1
=
(28,72)(0,3) = 7,625 106
 (0,0113 10 )
−4 f1 = 0,014

Re 2 =
V2 d 2
=
(8,465)(0,35) = 2,622 106
 (0,0113 10 )
−4 f2 = 0,0134

Re 3 =
V3d 3
=
(20,18)(0,4) = 7,143 106
 (0,0113 10 )
−4 f3 = 0,012

EDUNEX ITB
Aliran Pipa 2
Selanjuntnya gunakan kembali persamaan untuk khilangan head antara reservoir
1,2, dan 3 terhadap titik J untuk mendapatkan kecepatan serta persamaan
kontinuitas untuk mennetukan debit, sehingga
   0,32 
V1 = 27,98 m / det Q1 = V1 A1 = (27,98)  = 1,977 m3 / det
 4 
   0,352 
V2 = 5,95 m / det Q2 = V21 A2 = (5,95)  = 0,5721 m3 / det
 4 
   0,4 2 
V3 = 20,97 m / det Q3 = V3 A3 = (20,97 )  = 2,635 m3 / det
 4 

EDUNEX ITB
Aliran Pipa 2
Terlihat bahwa (Q1 + Q2) < Q3 , kemudian dilakukan interpolasi untuk mendapatkan
hasil akhir. Untuk HJ=380 m memberikan nilai (Q1 + Q2)-Q3=0,308 , sementara
HJ=400 m memberikan nilai (Q1 + Q2)-Q3=-0,0859. Jadi, kita piih HJ akhir menjadi
HJ = 380 + [0,308/(0,308+0,0859)](400-380) = 396 m. Dengan harga HJ hasil
interpolasi dan menggunakan prosedur yang sama seperti diatas, didapatkan besar
debit masing-masing pipa adalah
Q1 = V1 A1 = 1,988 m 3 / det

Q2 = V2 A2 = 0,6249 m3 / det
Q3 = V3 A3 = 2,616 m 3 / det

EDUNEX ITB
08

Terima Kasih

EDUNEX ITB

You might also like