ok/ not REQUIREMENTS

ok
1. IS WIND MAXIMUM DRIFT OF THE BUILDING OKAY?
for concrete T = 0.0731*H*0.75 T= 0.28024 Sec
H= 6m
when t<0.7, d=0.025H max d= 150 mm
when t>0.7, d=0.02H max d= 120 mm

2. IS EARTHQUAKE MAXIMUM DRIFT OF THE BUILDING OKAY?


for concrete T = 0.0731*H*0.75 T= 0.28024 Sec
H= 6m
when t<0.7, d = H/230 max d= 26.08696 mm
when t>0.7, d = H/300 max d= 20 mm

3. IS THE CAPACITY RATIO (CR) LESS THAN OR EQUAL TO 1?


WHEN CR < OR = 1, SECTION IS ADEQUATE TO RESIST ALL FORCES
WHEN CR>1 INADEQUATE

4. IS THE BUILDING HAS A MINIMUM OF 2 BAYS?


MIMIMUM SPAN IS 2.

5.IS THE BUILDING HAS A PONDING ISSUE?


IF YES MAKE A SEPARATION GAP 2" PER FLOOR
IF THERE'S A 3 STOREY BUILDING, THE MINIMUM GAP IS 6'' OR 15CM