TPCODL

Performance Review
E&MR/STS DIVISION, PARADEEP
DECEMBER- 2021
MAJOR MILESTONES

Oct--21
Substation Thermovision-08no’s
Power Transformer charged: 0 MVA
33KV VCB charged:05 No’s
11KV VCB charged: 5 no’s
New Battery replaced: 02 no’s.
New Battery charger charged: 01 no.
AUG-21 33/11KV PTs Tripping: Nil
Substation Thermovision-5 no’s
New PSS charged: JHIMANI (ODSSP) Dec--21
Nov--21
Power Transformer charged: 2x5.0MVA Substation Thermovision-15no’s
33KV VCB charged:03 No’s Substation Thermovision-15no’s New PSS charged : Trilochanpur &
11KV VCB charged: 03 no’s New PSS charged: Khamarkeshpur Duvalo (ODSSP)
New Battery replaced:08 no’s (ODSSP) Power Transformer charged: 15 MVA
Power Transformer charged: 10 MVA 33KV VCB charged: 07 No’s
New Battery charger charged: 01 no.
33KV VCB charged: 05 No’s 11KV VCB charged: 08 no’s
33/11KV PTs Tripping: Nil 11KV VCB charged: 04 no’s
Sept--21 New Battery replaced: 0 no’s
New Battery replaced: 0 no’s New Battery charger charged:03 nos.
Substation Thermovision-04 no’s New Battery charger charged:01 nos. 33/11KV PTs Tripping: Nil
33KV VCB charged:03 No’s 33/11KV PTs Tripping: Nil
11KV VCB charged: 03 no’s
New Battery replaced: 0 no’s
New Battery charger charged:01 no.
33/11KV PTs Tripping: Nil
PARADEEP EMR/STS DIVISION – KEY STATISTICS
Sl. Quantity
Description
No. (As on 31.08.2021)
1 Paradeep EMR/STS Division Geographical area 4403 Sq Km.
2 Distribution Divisions :-KED-I,KED-II,JED & PED 4 No's
3 Total No of OPTCL Grid 8 No's
4 Total No of 33kV feeders 29 No's
5 Total No of 33/11KV Sub-Station 62 No's
6 Total Nos. of Power Transformers 130
129 No's
7 Total installed capacity 648.96
644.95 MVA
8 Total Nos. of Station Transformer (100KVA,33/0.433KV) 53
52 No's
9 Total no of 11KV feeders 184
175 No's
NEWLY ADDED IN DEC-2021
1 New PSS Name Trilochanpur/Duvalo
2 No of 33kV feeders 02
3 No of 33/11KV Sub-Station 02
4 Nos. of Power Transformers 03
5 Installed capacity in MVA 15
6 Nos. of Station Transformer (100KVA,33/0.433KV) 02
7 No of 11KV feeders 04
EMR/STS ASSETS IN DETAIL
PARTICULARS KED-1 KED-2 JED PED TOTAL

No of 33KV feeder 13 2 6 8 29

O/H (KMs)/U/G (KMs)/Composite (KMs) 252.4 /1 67.3/0.4 151.9/0.4 68.8/1.5 540.4/3.3


No of Substations 24 8 17 13 62

No of P. Transformers/Transformation Capacity 20/93.8 35/175.16 29/161.8 MVA 130/648.96


46/218.2
No of 33/11KV Outdoor Circuit Breakers 49/60 15/25 43/35 28 /30 135/150
No of 11KV Indoor switchboards/No of VCB 6/36
7/40 2/12 6/44 21/132
Panels
No of 33/11KV outdoor CTs 147/180 45/75 129/102 75/72 396/429
No of 33/11KV outdoor VTs 60/56 30/32 43/46 54/84 187/218
No of 33/11KV LA’s 239/306 108/132 153/167 90/108 590/713
No of 33/11KV Isolators & AB switches 109/123 43/42 84/87 53/58 283/305
No of 33/11KV CRP Outdoor 3/1 2/7 3/2 0/1 8/11
No of 33/11KV CRP Indoor 46/59 16/28 40/33 39/47 141/167
No of Station Transformers 19 8 15 11 53
No of ACDB 20 6 15 13 54
No of Kiosk VCB/11kv CT/PT 8/24/22 5/15/15 5/15/15 2/6/6 19/57/57
No of Automated/Conventional Substations 0/24 0/8 0/17 0/13 0/62
SAFETY

Accident/Incident/LWDC For the month Initiatives to enhance safety


1. Ensuring the mandatory use of PPE’s ,FRP ladder and
discharge rods while working during daily maintenance
ZERO activities.
2. Training on operation of Fire extinguisher to PSS Operators.
3. Attending of Hot spot rectification work in feeders & sub-
stations.
4. Laying of insulated Rubber mat inside the control room of
different primary sub-stations.
5. Safety Oath, Tool Box Talk , Safety Pep-talks before starting
of daily work.
6. Installation of Tube Lights at control room of different PSS.
7. Checker plate Laying work done of different PSS .
Accident/Incident/LWDC Cumulative 8. Earth pit installation work under progress of different PSS.
9. BBS Training conducted By Paribartan Consultancy.

ZERO
KEY WORK HIGHLIGHTS (E&MR TEAM)

1) CHARGING OF TRILOCHANPUR PSS.


2) CHARGING OF DUVALO PSS UNDER ODSSP SCHEME.
3) REPLACEMENT OF BREATHER AT DIFFERENT PSS UNDER PDP CIRCLE.
4) 11KV MEGAWIN KIOSK VCB INSTALLATION AND CHARGING ON MENDHAPUR PSS AT AUL PSS.
5) 33KV AND 11KV AB SWITCH INSTALLED AT DIFFERENT PSS.
6) AUTORECLOSER INSTALLATION AND CHARGED UNDER PDP CIRCLE.
7) CBM THERMOGRAPHY OF ALL 33KV FDR & MOST OF PSS OF KED-I & II COMPLETED.
8) 11KV SIEMENS VCB DEFECTIVE SPRING CHARGING MOTOR REPLACED ON NO-1 FDR AT DUHURIA PSS.
9) 11KV VIJAYA KIOSK DEFECTIVE RATCHET WHEEL REPLACED AT KED-I & KED-II .
10) ALL PTR TAP CHANGING DONE UNDER KED-I & KED-II.
11) PTR OIL TOPUP DONE WHICH PTR OIL LEVEL LESS THE 30%.
12) 01 NO 33KV CT REPLACED AND CHARGED OF THAKURAPATNA VCB AT KENDRAPARA PSS.
14) READINESS OF 3 NOS 11KV L&T I/D VCB WITH RESPECTIVE BUS- BAR ARRANGEMENT DONE AT DUVALO PSS.
15) 3 NOS 33KV VCB WITH RESPECTIVE CT INSTALLATION AND CONTROL CABLE LAYING DONE WHICH WAS LEFT OUT
UNDER RAPDRP SCHEME. THE VCB WILL BE CHARGE ON JAN-2022.
16) MAIN 33KV I/C VCB WITH 1 NO 5 MVA POWER T/F VCB CHARGING DONE AT BIRIDI PSS UNDER DDUGJY SCHEME.
17) DC SUPPLY GIVEN FROM BATTERY CHARGER TO ALL 33KV & 11KV VCB WITH CR PANEL AT BALIKUDA PSS. EARLIERLY
DC SUPPLY GIVEN THROUGH POWER PACK & RECTIFIED UNIT.
18) DIFFERENTIAL RELAY OPERATING PROBLEM WAS CHECKED AT DUVALO ODSSP PSS AND SAME WAS RECTIFIED.
KEY WORK HIGHLIGHTS (E&MR TEAM)

19) 1 NO 11KV CG MAKE VCB WITH CT & PT INSTALLATION DONE ABOVE THERE STRUCTURE INSTEAD OF VIJAI KIOSK VCB
ON TARIKUND FEEDER OF NABAPATNA PSS .THE VCB WAS TEST CHARGED CONDITION. FINAL LOADING GIVEN ON JAN-
2022.
20)1 NO 11KV SCHNEIDER VCB DAMAGED LIMB WAS REPLACED BY SPARE LIMB FOUND OK.
21) 11KV O/G SCHNEIDER VCB DAMAGED RACHET WHELL WAS REPLACED BY SPARE ONE AT NUAPADA PSS.
22) INSTALLATION OF CONTROL ROOM LIGHTS AT DIFFERENT PSS.
23) NEW 415V. I/D ACDB INSTALLATION & CHARGING AT TIRTOL PSS
24) NEW LTDB INSTALLATION & CHARGING AT TIRTOL PSS.
25) NEW 24V. BATTERY CHARGER ( VRLA TYPE - AMARRAJA) INSTALLED & COMMISSIONING UNDER DDUGJY SCHEME AT
ERSAMA PSS.
26) SPARE GEAR MECHANISM INSTALLATION ON 11KV SANTARA FEEEDER (BHEL PVN12B VCB) DUE TO MUCH TROUBLE
SHOOTING ARE FOUND OUT.
27) 02 NO'S OF 11KV BHEL I/D VCB INSTALLATION,COMMISIONING AND CHARGED AT RAHAMA PSS.
28) MARSHLING BOX TB REPLACEMENT OF 5.0 MVA PTR ( MARSON ) AT RAHAMA PSS.
29) 01 NO’ OF SPARE BHEL VCB LIMB REPLACEMENT DONE OF 33KV I/C AT RAHAMA PSS.
30) 01 NO’S OF 11KV VCB ( MAKE : CG ) CHARGED UNDER RAPDRP SCHEME AT PARADEEPGARH PSS.
31) 01 NO’S OF BATTERY WITH BATTERY CHARGER CHARGING UNDER DDUGJY SCHEME AT ERSAMA PSS.
KEY WORK HIGHLIGHTS OF 33KV BA

SL
No. NAME OF THE ACTIVITY UNIT KED-I KED-II JED PED T0TAL
1 Routine inspection /patrolling of feeders & Removals of defects Nos 9 6 7 6 28

2 Tree trimming /Removal of creepers in spans Spans 55 25 125 59 264

3 Thermal Scanning of OH & Composite lines (feeders) Nos 0 6 0 0 6

Making unsafe locations safe (Straightening of Poles, Fixing of V cross


4 Nos 202 43 5 348 598
Arm, Restringing of Conductors etc.)

5 Laying of Insulated Rubber Mat in PSS Nos 0 0 2 0 2

6 Distribution of Fire Extinguisher in PSS Nos 0 0 0 0 0

7 Fixing of LED Lights in PSS Nos 11 0 2 4 17

8 Installation of LA Nos 2 0 3 0 5

9 Installation of 11KV AB Switch(3pole) Set 5 2 2 0 9

10 Installation of CT Nos 1 0 12 0 13

11 Installation of PT Nos 0 0 3 1 4

12 Jumpering Nos 88 10 18 14 130


AVAILABILITY/REQUIREMENT OF LA AT PRIMARY SUB-STATIONS
(33KV FEEDER+11KV FEEDER+PTs+STATION TRANSFORMER)
33KV LA 11KV LA
DIVISION TOTAL 33/11 KV PSS
Available Requirement Available Requirement

KED-1 24 239 52 306 51


KED-2 8 108 00 132 15
JED 17 153 54 167 70
PED 13 90 25 108 40
Total 61 584 131 713 176

KED-I KED-II JED PED


132 167 108
350 306 140 180 153 120
300 120 108 160 90
239 100
140
250 100
120 80
200 80
100 60
70 40
150 60 80 54
100 52 51 40 60 40 25
15
50 20 40 20
0
20
0 0 0
0
AVL REQ AVL REQ AVL REQ AVL REQ AVL REQ AVL REQ AVL REQ AVL REQ
33KV LA 11KV LA 33KV LA 11KV LA 33KV LA 11KV LA 33KV LA 11KV LA
33KV INTERRUPTIONS (Category Wise)
For the month – B/D, UPSD, PSD, SF, Total

KED-I KED-II JED PED

BD BD 12% BD BD
19% 20% 0%
5% 15%
2% UPSD UPSD UPSD 6%
1% UPSD
50% 4% 50% 6% 50% 50%
PSD 7% PSD 33% PSD PSD
25% 17% 28%
SF from OPTCL SF from OPTCL SF from OPTCL SF from OPTCL
Grand Total Grand Total Grand Total Grand Total

SF from Grand PARADEEP CIRCLE TOTAL


Division BD UPSD PSD
OPTCL Total
280
KED-I 28 4 5 36 73 300

250

KED-II 15 5 5 200 152


13 38 150
JED 17 0 7 49 73 100
73
PED 14 6 1 27 48 50 21 19

Paradeep, 0
73 15 18 125 232 BD UPSD PSD SF from Grand
Total OPTCL Total
33KV INTERRUPTIONS – (BD+UPSD) & PSD,SF OPTCL

PARADEEP CIRCLE URBAN RURAL


60 40 35

35 38 30
33
50
49 30 28
25 27
40
25
20
36
30
32 20 20 20
15
27 15
20
15 10
13
20 20 10 11
17
10 13
5 5
5 6
5 5 7 1 4 2 3 0 0 0 1 0 0 0 3 2 1
0 0 0
KED-I KED-2 JED PED KED-I KED-2 JED PED KED-I KED-2 JED PED
BD+UPSD PSD SF From OPTCL BD+UPSD PSD SF From OPTCL BD+UPSD PSD SF From OPTCL

SF From
Division BD+UPSD PSD OPTCL
Division BD+UPSD PSD SF From OPTCL KED-I 4 2 3
URBAN
KED-I 32 5 36 KED-2 0 0 0
JED 15 1 38
PED 0 0 0
KED-2 20 5 13 KED-I 28 3 33
JED 17 7 49 KED-2 20 5 13
RURAL JED 2 6 11
PED 20 1 27
TOP 10 INTERRUPTION – 33KV FEEDERS

TOP 10 INTERRUPTION FEEDER,PDP


12
12
10
8 6 6 6
5 5
6 4 4
4
3 3
2
0

KED-I KED-II JED PED


6 12 6 6
5 5
6 12 6 6
4 4 10 5 3 5
3 8 4
4 6 2 3 1 1 4
2 4 1 2 3 2
2
0 0 1
2 0 2 1
0 0
1
0 0
RELIABILITY INDICES (DECEMBER-2021)

SAIDI SAIDI
0.396
0.4
Division Urban Rural Total
0.35 0.31
0.3
KED-I 0.01 0.073 0.08 0.25

KED-II 0 0.11 0.11 0.2


0.130.129
0.15 0.11 0.11
0.0730.083 0.074 0.074 0.084
JED 0.07 0 0.07 0.1
0.05 0.01 0 0 0
PED 0 0.13 0.13 0
KED-I KED-II JED PED Paradeep,Total

Paradeep,Total 0.08 0.31 0.4 SAIDI Urban SAIDI Rural SAIDI Total

SAIFI SAIFI
0.45 0.409
Division Urban Rural Total 0.4
0.35
KED-I 0.02 0.02 0.04 0.3 0.28

0.25
KED-II 0 0.11 0.11 0.2
0.145 0.145
0.15 0.112
0.126
0.109 0.109 0.11
JED 0.11 0.01 0.11 0.1
0.043
0.05 0.02 0.02 0.006
0 0
0
PED 0 0.15 0.15 KED-I KED-II JED PED Paradeep,Total

Paradeep,Total 0.126 0.28 0.41 SAIFI Urban SAIFI Rural SAIFI Total
PROTECTION & TESTING AND 5S ACTIVITIES

1. PTR tripping’s.
There is “NO” PTR tripping during the month of “DEC-2021” under Paradeep circle.

KED-1 KED-2 JED PED


0 0 0 0
However, all 33KV & 11KV feeder uncoordinated tripping is regularly monitored, analyzed and corrective actions
is being taken.
GRID AUDIT – “NIL”
2. 5S Activities :

SL NO DIVISION TOTAL PSS 1S 2S 3S 4S 5S


1 KED-1 24 14 7 3 0 0
2 KED-2 8 1 1 6 0 0
3 JED 17 8 6 3 0 0
4 PED 13 0 6 6 1 0
TOTAL 62 23 20 18 1 0
MAJOR JOB PLANNED FOR JANUARY-2022
1. Installation of 33kV PTs at different PSS.
2. Thermography of feeders and substations .
3. Installation of 33KV LA.Installation of 11KV & 33KV AB switch at Different PSS.
4. Construction of additional Earth pits through 33KV BA at Different PSS to improve earth resistance value for safety of the
equipment.
5. Witness of testing of equipment & load evacuation of 11kv fishery feeder constructed under ODAFF scheme at Dusbatia pss
6. Replacement Numerical O/C & E/F Relay at Sova PSS for uncoordinated tripping of Dusbatia Line.
7. Maintenance and Testing activities at PSS as per AMP under different divisions in Paradeep Circle.
8. Charging of ACDB at Gogua PSS.
9. Installation of PTR LA at Indupur PSS By doing separate Earthing.
10. Installation of Breather of Different PSS under Paradeep Circle.
15. Power transformer bushing and CT pad clamp replacement of all PSS where pad clamp not available.
16. 5 MVA Power Transformer of Patkura feeder at Luna PSS overhauling due to
heavy oil leakage from all of its gasket.
17) Charging of 3 nos 33kv vcb with CR panel at jagatsinghpur pss which was left out under RAPDRP Scheme.
18) Charging of 3 Nos additional feeder with proper installation of 11kv Bus bar at Duvalo ODSSP pss.
19) Charging of 1 no 11kv Kiosk vcb at Balikuda pss. Earlier feeder having no vcb.
MAJOR JOB CHALLENGES

1. Non-Availability of Outages on 33KV feeders and Primary Sub-stations


2. Increase in volume of tripping of 11kv feeders, VCB operation increased, due to which mechanical problems are arising.

1. Un-availability of more than one power Transformers in the Primary Sub-stations, hence, restriction of load diversion in those
sub-stations.
2. Unavailability of 33/0.4 KV Station Transformers in the primary Sub-stations.

3. Functioning of Fuse call center & section office inside control room.
4. Un-availability of Testing equipment such as Primary Injection KIT, Breaker Timer, CRM, TRM, DGA KIT, Secondary Injection KIT
etc. to carry out the testing as per AMP.
5. Un-availability Portable spare Battery charger for emergency back up.
6. Non- availability of adequate experienced Technicians.
7. Technical training need to be provided to EMR technicians, SSOs and BA staffs.
8. Non-replacement of Electro mechanical Relay by Numerical relay.
9. Non-availability of Spares such as Relays to attend the Emergency Breakdown.
10. Periodic Safety Training required for BA Employee for make them aware about the safety.
GLIMPSES OF UNSAFE LOCATIONS MADE SAFE- KED-1

BEFORE BEFORE BEFORE

AFTER AFTER AFTER


GLIMPSES OF UNSAFE LOCATIONS MADE SAFE-KED-2

BEFORE BEFORE BEFORE

AFTER AFTER AFTER


GLIMPSES OF UNSAFE LOCATIONS MADE SAFE- JED

33KV LA INSTALLED AT NABAPATNA PSS BEFORE BEFORE

CONTROL ROOM LIGHT INSTALLED AT DIFFERENT


AFTER AFTER
GLIMPSES OF UNSAFE LOCATIONS MADE SAFE- PDP

BEFORE BEFORE BEFORE

AFTER AFTER AFTER


WORKPLACE MANAGEMENT– 5S
GLIMPSES ON WORK HIGHLIGHTS of KED-1

Charging of 11kv Megawin kiosk VCB on 11kv Siemens VCB Spring charging Motor Batt. Ch. Control & AVR/ACR Card
Mendhapur fdr at Aul PSS replaced at Duhuria PSS. replced at Kandira PSS

11kv Vijaya kiosk VCB Ratchet wheel replaced 33kv CT installed at Kendrapara PSS 11kv BHEL VCB Gear box replaced at Olaver & Adhajori
PSS
GLIMPSES ON WORK HIGHLIGHTS of KED-2

Autorecloser installed and charged on Chhapali


33kv VCB replaced at Luna PSS PTR Tap Changing Work at Different PSS
11kv feeder.

CBM Thermography of PSS and 33kv Fdrs 11kv Vijaya Kiosk VCB Ratchet wheel replaced
PTR Oil Top-up Work at Different PSS
GLIMPSES OF WORK HIGHLIGHTS UNDER JED

Duvalo PSS Charged(ODSSP) 02 nos 33kv VCB charged at Biridi PSS


11kv Stelmech VCB With CRP Installed at Balikuda PSS

PTR Breather replaced at different PSS 01 no Masstech Batt. Ch. Installed at Duvalo Damaged Control cable of 11kv L&T I/D VCB replaced at
PSS Duvalo PSS
GLIMPSES OF WORK HIGHLIGHTS UNDER PED

02 nos 11kv I/D BHEL VCB Control room light installed at different PSS PTR breather replaced at Different PSS
Replaced at Rahama PSS

New 33/11kv Trilochanpur PSS was successfully Charged New 24V. Battery bank was installation at Ersama PSS
SAP NOTIFICATION

SAP PM DASHBOARD FOR PARADEEP CIRCLE

NO. OF TYPE OF NOTIFICATION NO. OF NO. OF


MONTH DIVISION NOTIFICATION NOTIFICATION NOTIFICATION
RAISED CLOSED PENDING
M1 M2 M3

KED-1 51 43 1 7 49 2

KED-2 25 14 0 11 13 12

NOV-21 JED 10 2 0 8 2 8

PED 20 9 0 11 9 11

TOTAL 100 62 1 37 63 37
Let’s Create another success story of Distribution Reform