Performance Review
E&MR/STS DIVISION, PARADEEP
DECEMBER- 2021
MAJOR MILESTONES
Oct--21
Substation Thermovision-08no’s
Power Transformer charged: 0 MVA
33KV VCB charged:05 No’s
11KV VCB charged: 5 no’s
New Battery replaced: 02 no’s.
New Battery charger charged: 01 no.
AUG-21 33/11KV PTs Tripping: Nil
Substation Thermovision-5 no’s
New PSS charged: JHIMANI (ODSSP) Dec--21
Nov--21
Power Transformer charged: 2x5.0MVA Substation Thermovision-15no’s
33KV VCB charged:03 No’s Substation Thermovision-15no’s New PSS charged : Trilochanpur &
11KV VCB charged: 03 no’s New PSS charged: Khamarkeshpur Duvalo (ODSSP)
New Battery replaced:08 no’s (ODSSP) Power Transformer charged: 15 MVA
Power Transformer charged: 10 MVA 33KV VCB charged: 07 No’s
New Battery charger charged: 01 no.
33KV VCB charged: 05 No’s 11KV VCB charged: 08 no’s
33/11KV PTs Tripping: Nil 11KV VCB charged: 04 no’s
Sept--21 New Battery replaced: 0 no’s
New Battery replaced: 0 no’s New Battery charger charged:03 nos.
Substation Thermovision-04 no’s New Battery charger charged:01 nos. 33/11KV PTs Tripping: Nil
33KV VCB charged:03 No’s 33/11KV PTs Tripping: Nil
11KV VCB charged: 03 no’s
New Battery replaced: 0 no’s
New Battery charger charged:01 no.
33/11KV PTs Tripping: Nil
PARADEEP EMR/STS DIVISION – KEY STATISTICS
Sl. Quantity
Description
No. (As on 31.08.2021)
1 Paradeep EMR/STS Division Geographical area 4403 Sq Km.
2 Distribution Divisions :-KED-I,KED-II,JED & PED 4 No's
3 Total No of OPTCL Grid 8 No's
4 Total No of 33kV feeders 29 No's
5 Total No of 33/11KV Sub-Station 62 No's
6 Total Nos. of Power Transformers 130
129 No's
7 Total installed capacity 648.96
644.95 MVA
8 Total Nos. of Station Transformer (100KVA,33/0.433KV) 53
52 No's
9 Total no of 11KV feeders 184
175 No's
NEWLY ADDED IN DEC-2021
1 New PSS Name Trilochanpur/Duvalo
2 No of 33kV feeders 02
3 No of 33/11KV Sub-Station 02
4 Nos. of Power Transformers 03
5 Installed capacity in MVA 15
6 Nos. of Station Transformer (100KVA,33/0.433KV) 02
7 No of 11KV feeders 04
EMR/STS ASSETS IN DETAIL
PARTICULARS KED-1 KED-2 JED PED TOTAL
No of 33KV feeder 13 2 6 8 29
ZERO
KEY WORK HIGHLIGHTS (E&MR TEAM)
19) 1 NO 11KV CG MAKE VCB WITH CT & PT INSTALLATION DONE ABOVE THERE STRUCTURE INSTEAD OF VIJAI KIOSK VCB
ON TARIKUND FEEDER OF NABAPATNA PSS .THE VCB WAS TEST CHARGED CONDITION. FINAL LOADING GIVEN ON JAN-
2022.
20)1 NO 11KV SCHNEIDER VCB DAMAGED LIMB WAS REPLACED BY SPARE LIMB FOUND OK.
21) 11KV O/G SCHNEIDER VCB DAMAGED RACHET WHELL WAS REPLACED BY SPARE ONE AT NUAPADA PSS.
22) INSTALLATION OF CONTROL ROOM LIGHTS AT DIFFERENT PSS.
23) NEW 415V. I/D ACDB INSTALLATION & CHARGING AT TIRTOL PSS
24) NEW LTDB INSTALLATION & CHARGING AT TIRTOL PSS.
25) NEW 24V. BATTERY CHARGER ( VRLA TYPE - AMARRAJA) INSTALLED & COMMISSIONING UNDER DDUGJY SCHEME AT
ERSAMA PSS.
26) SPARE GEAR MECHANISM INSTALLATION ON 11KV SANTARA FEEEDER (BHEL PVN12B VCB) DUE TO MUCH TROUBLE
SHOOTING ARE FOUND OUT.
27) 02 NO'S OF 11KV BHEL I/D VCB INSTALLATION,COMMISIONING AND CHARGED AT RAHAMA PSS.
28) MARSHLING BOX TB REPLACEMENT OF 5.0 MVA PTR ( MARSON ) AT RAHAMA PSS.
29) 01 NO’ OF SPARE BHEL VCB LIMB REPLACEMENT DONE OF 33KV I/C AT RAHAMA PSS.
30) 01 NO’S OF 11KV VCB ( MAKE : CG ) CHARGED UNDER RAPDRP SCHEME AT PARADEEPGARH PSS.
31) 01 NO’S OF BATTERY WITH BATTERY CHARGER CHARGING UNDER DDUGJY SCHEME AT ERSAMA PSS.
KEY WORK HIGHLIGHTS OF 33KV BA
SL
No. NAME OF THE ACTIVITY UNIT KED-I KED-II JED PED T0TAL
1 Routine inspection /patrolling of feeders & Removals of defects Nos 9 6 7 6 28
8 Installation of LA Nos 2 0 3 0 5
10 Installation of CT Nos 1 0 12 0 13
11 Installation of PT Nos 0 0 3 1 4
BD BD 12% BD BD
19% 20% 0%
5% 15%
2% UPSD UPSD UPSD 6%
1% UPSD
50% 4% 50% 6% 50% 50%
PSD 7% PSD 33% PSD PSD
25% 17% 28%
SF from OPTCL SF from OPTCL SF from OPTCL SF from OPTCL
Grand Total Grand Total Grand Total Grand Total
250
Paradeep, 0
73 15 18 125 232 BD UPSD PSD SF from Grand
Total OPTCL Total
33KV INTERRUPTIONS – (BD+UPSD) & PSD,SF OPTCL
35 38 30
33
50
49 30 28
25 27
40
25
20
36
30
32 20 20 20
15
27 15
20
15 10
13
20 20 10 11
17
10 13
5 5
5 6
5 5 7 1 4 2 3 0 0 0 1 0 0 0 3 2 1
0 0 0
KED-I KED-2 JED PED KED-I KED-2 JED PED KED-I KED-2 JED PED
BD+UPSD PSD SF From OPTCL BD+UPSD PSD SF From OPTCL BD+UPSD PSD SF From OPTCL
SF From
Division BD+UPSD PSD OPTCL
Division BD+UPSD PSD SF From OPTCL KED-I 4 2 3
URBAN
KED-I 32 5 36 KED-2 0 0 0
JED 15 1 38
PED 0 0 0
KED-2 20 5 13 KED-I 28 3 33
JED 17 7 49 KED-2 20 5 13
RURAL JED 2 6 11
PED 20 1 27
TOP 10 INTERRUPTION – 33KV FEEDERS
SAIDI SAIDI
0.396
0.4
Division Urban Rural Total
0.35 0.31
0.3
KED-I 0.01 0.073 0.08 0.25
Paradeep,Total 0.08 0.31 0.4 SAIDI Urban SAIDI Rural SAIDI Total
SAIFI SAIFI
0.45 0.409
Division Urban Rural Total 0.4
0.35
KED-I 0.02 0.02 0.04 0.3 0.28
0.25
KED-II 0 0.11 0.11 0.2
0.145 0.145
0.15 0.112
0.126
0.109 0.109 0.11
JED 0.11 0.01 0.11 0.1
0.043
0.05 0.02 0.02 0.006
0 0
0
PED 0 0.15 0.15 KED-I KED-II JED PED Paradeep,Total
Paradeep,Total 0.126 0.28 0.41 SAIFI Urban SAIFI Rural SAIFI Total
PROTECTION & TESTING AND 5S ACTIVITIES
1. PTR tripping’s.
There is “NO” PTR tripping during the month of “DEC-2021” under Paradeep circle.
1. Un-availability of more than one power Transformers in the Primary Sub-stations, hence, restriction of load diversion in those
sub-stations.
2. Unavailability of 33/0.4 KV Station Transformers in the primary Sub-stations.
3. Functioning of Fuse call center & section office inside control room.
4. Un-availability of Testing equipment such as Primary Injection KIT, Breaker Timer, CRM, TRM, DGA KIT, Secondary Injection KIT
etc. to carry out the testing as per AMP.
5. Un-availability Portable spare Battery charger for emergency back up.
6. Non- availability of adequate experienced Technicians.
7. Technical training need to be provided to EMR technicians, SSOs and BA staffs.
8. Non-replacement of Electro mechanical Relay by Numerical relay.
9. Non-availability of Spares such as Relays to attend the Emergency Breakdown.
10. Periodic Safety Training required for BA Employee for make them aware about the safety.
GLIMPSES OF UNSAFE LOCATIONS MADE SAFE- KED-1
Charging of 11kv Megawin kiosk VCB on 11kv Siemens VCB Spring charging Motor Batt. Ch. Control & AVR/ACR Card
Mendhapur fdr at Aul PSS replaced at Duhuria PSS. replced at Kandira PSS
11kv Vijaya kiosk VCB Ratchet wheel replaced 33kv CT installed at Kendrapara PSS 11kv BHEL VCB Gear box replaced at Olaver & Adhajori
PSS
GLIMPSES ON WORK HIGHLIGHTS of KED-2
CBM Thermography of PSS and 33kv Fdrs 11kv Vijaya Kiosk VCB Ratchet wheel replaced
PTR Oil Top-up Work at Different PSS
GLIMPSES OF WORK HIGHLIGHTS UNDER JED
PTR Breather replaced at different PSS 01 no Masstech Batt. Ch. Installed at Duvalo Damaged Control cable of 11kv L&T I/D VCB replaced at
PSS Duvalo PSS
GLIMPSES OF WORK HIGHLIGHTS UNDER PED
02 nos 11kv I/D BHEL VCB Control room light installed at different PSS PTR breather replaced at Different PSS
Replaced at Rahama PSS
New 33/11kv Trilochanpur PSS was successfully Charged New 24V. Battery bank was installation at Ersama PSS
SAP NOTIFICATION
KED-1 51 43 1 7 49 2
KED-2 25 14 0 11 13 12
NOV-21 JED 10 2 0 8 2 8
PED 20 9 0 11 9 11
TOTAL 100 62 1 37 63 37
Let’s Create another success story of Distribution Reform