Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

TP ENTERPRISE

Kampung Masanoi
Peti Surat 757,
89907 Tenom,Sabah
.
SEBUT HARGA

Pejabat Daerah Perhutanan Daerah Keningau Tarikh :


Peti Surat No. 88 Ref No. : 126
89007 Keningau Sabah Malaysia.

SEBUTHARGA KERJA PENYEDIAAN PELAN CADANGAN PEMBINAAN BANGUNAN


APIN-APIN CAFÉ DAN KEDAI SOURVENIR HUTAN SIMPAN NULUHON TRUSMADI, KENINGAU.

NO KETERANGAN / TUJUAN KUANTITI HARGA SEUNIT JUMLAH HARGA


(RM) (RM)

1. To Prepare And Submit A Bill Of


Quantity (BQ) For CADANGAN
PEMBINAAN BANGUNAN
APIN-APIN CAFÉ DAN KEDAI
SOURVENIR HUTAN SIMPAN 1 4700.00 RM 4700.00
NULUHON TRUSMADI, KENINGAU.
2. To Complete the construction
drawings for CADANGAN
PEMBINAAN BANGUNAN
APIN-APIN CAFÉ DAN KEDAI
SOURVENIR HUTAN SIMPAN
NULUHON TRUSMADI, KENINGAU.

a) Layout Plan, Section X-X & Y-


Y View, Front Rear Elevation
View & Roof Plan. Lum Sum 6980.00 RM 6980.00

b) M & E Layout Plan Lum Sum 2870.00 RM 2870.00

c) 3D Sketchup Office 30 180.00 RM 5400.00

d) Softcopy & Hardcopy (A3)(A4) Lum Sum 350.00 RM 350.00

e) Structural Plan
Lum Sum 2800.00 RM 2800.00

TOTAL RM 23,100.00

RINGGIT MALAYSIA : DUA PULUH TIGA RIBU DAN SATU RATUS RINGGIT SAHAJA.

………………………………………………. ………………………………….
TP ENTERPRISE DITERIMA OLEH
TP ENTERPRISE
Kampung Masanoi
Peti Surat 757,
89907 Tenom,Sabah
.

SEBUT HARGA

Pejabat Daerah Perhutanan Daerah Keningau Tarikh :


Peti Surat No. 88 Ref No. : 126
89007 Keningau Sabah Malaysia.

SEBUTHARGA KERJA PENYEDIAAN PELAN CADANGAN PEMBINAAN BANGUNAN


APIN-APIN CAFÉ DAN KEDAI SOURVENIR HUTAN SIMPAN NULUHON TRUSMADI, KENINGAU.

NO KETERANGAN / TUJUAN KUANTITI HARGA SEUNIT JUMLAH HARGA


(RM) (RM)

1. To Prepare And Submit A Bill Of


Quantity (BQ) For CADANGAN
PEMBINAAN BANGUNAN
APIN-APIN CAFÉ DAN KEDAI
SOURVENIR HUTAN SIMPAN 1 5700.00 RM 5700.00
NULUHON TRUSMADI, KENINGAU.
2. To Complete the construction
drawings for CADANGAN
PEMBINAAN BANGUNAN
APIN-APIN CAFÉ DAN KEDAI
SOURVENIR HUTAN SIMPAN
NULUHON TRUSMADI, KENINGAU.

f) Layout Plan, Section X-X & Y-


Y View, Front Rear Elevation
View & Roof Plan. Lum Sum 6980.00 RM 6980.00

g) M & E Layout Plan Lum Sum 2870.00 RM 2870.00

h) 3D Sketchup Office 30 180.00 RM 5400.00

i) Softcopy & Hardcopy (A3)(A4) Lum Sum 350.00 RM 350.00

j) Structural Plan
Lum Sum 3800.00 RM 3800.00

TOTAL RM 25,100.00

RINGGIT MALAYSIA : DUA PULUH LIMA RIBU DAN SATU RATUS RINGGIT SAHAJA.
TP ENTERPRISE
Kampung Masanoi
Peti Surat 757,
89907 Tenom,Sabah
.
………………………………………………. ………………………………….
TP ENTERPRISE DITERIMA OLEH

You might also like