Tipe Data UPPER ALN UPPER UPPER UPPER ALN ALN ALN ALN ALN ALN UPPER
Panjang Karakter 30 100 30 30 5 30 55 36 36 36 12 8
Nama Field PMNUM DESCRIPTION ASSETNUM JPNUM WORKTYPE FREQUENCY FREQUNIT NEXTDATE GLACCOUNT STATUS ORGID SITEID
Keterangan Nomor PM Deskripsi PM Nomor Aset Nomor Job Plan Tipe Work Frekuensi Satuan Tanggal Terdekat Kode GL Akuntansi Status Kode Kode
Order yang pelaksanaan frekuensi Pelaksanaan PM untuk asset PM PM Organisas Site
Digenerate pekerjaan pelaksanaan i
oleh PM PM

OH - INSTAL, ALIGNMENT, & BALANCING SEALING AIR FAN B #1 - 1M 10HFW12AN001 OH 4 Weeks 26-Feb-22
OH - REPLACE LUBE OIL SEALING AIR FAN B #1 - 1M 10HFW12AN001 OH 4 Weeks 26-Feb-22
PM - INSTAL, ALIGNMENT, & BALANCING SWRO HIGH PRESSURE PUMP (VF) B - 1M J0GCF12AP001 PM 4 Weeks 26-Feb-22
PM - REPLACE LUBE OIL SWRO HIGH PRESSURE PUMP (VF) B - 1M J0GCF12AP001 PM 4 Weeks 26-Feb-22
PM - INSTAL, ALIGNMENT, & BALANCING FUEL OIL SUPPLY PUMP A - 1M J0EGC32AP000 PM 4 Weeks 26-Feb-22
PM - REPLACE LUBE OIL FUEL OIL SUPPLY PUMP A - 1M J0EGC32AP000 PM 4 Weeks 26-Feb-22
PM - MAGGER TEST MOTOR FUEL OIL SUPPLY PUMP A - 1M J0EGC32AP000 PM 4 Weeks 26-Feb-22
OH - INSPECTION & RE-ALIGNMENT PRIMARY AIR FAN B #1 - 1M 10HFE12AN001 OH 4 Weeks 26-Feb-22
OH - LUBE OIL SAMPLING PRIMARY AIR FAN B #1 - 1M 10HFE12AN001 OH 4 Weeks 26-Feb-22
OH - REPLACE LUBE OIL SAMPLING PRIMARY AIR FAN B #1 - AR 10HFE12AN001 OH 4 Weeks 26-Feb-22
OH - INSPECTION & RE-ALIGNMENT FORCE DRAFT FAN B #1 - 1M 10HLA11AN002 OH 4 Weeks 26-Feb-22
OH - LUBE OIL SAMPLING FORCE DRAFT FAN B #1 - 1M 10HLA11AN002 OH 4 Weeks 26-Feb-22
OH - REPLACE LUBE OIL FORCE DRAFT FAN B #1 - AR 10HLA11AN002 OH 4 Weeks 26-Feb-22
PM - INSPECTION, RE-ALIGNMENT, & TIGHTENING FUEL OIL SUPPLY PUMP B - 1M J0EGC33AP001 PM 4 Weeks 26-Feb-22
PM - LUBE OIL SAMPLING FUEL OIL SUPPLY PUMP B - 1M J0EGC33AP001 PM 4 Weeks 26-Feb-22
PM - REPLACE LUBE OIL FUEL OIL SUPPLY PUMP B - AR J0EGC33AP001 PM 4 Weeks 26-Feb-22
PM - INSPECTION, RE-ALIGNMENT, & TIGHTENING UF WATER PUMP A - 1M J0GCB31AP001 PM 4 Weeks 26-Feb-22
PM - LUBE OIL SAMPLING UF WATER PUMP A - 1M J0GCB31AP001 PM 4 Weeks 26-Feb-22
PM - REPLACE LUBE OIL UF WATER PUMP A - AR J0GCB31AP001 PM 4 Weeks 26-Feb-22
PM - RE-LUBRICATION RECLAIMED WATER PUMP #1 - 1M J0GJA11AP001 PM 4 Weeks 26-Feb-22
PM - RE-LUBRICATION RECLAIMED WATER PUMP #2 - 1M J0GJA12AP001 PM 4 Weeks 26-Feb-22
PM - RE-LUBRICATION RECLAIMED WATER PUMP #3 - 1M J0GJA13AP001 PM 4 Weeks 26-Feb-22
PM - INSPECTION, RE-ALIGNMENT, & TIGHTENING CONTINUOUS DOSING PUMP B - 1M J0PBM79AP001 PM 4 Weeks 26-Feb-22
PM - LUBE OIL SAMPLING CONTINUES DOSING PUMP B - 1M J0PBM79AP001 PM 4 Weeks 26-Feb-22
PM - REPLACE LUBE OIL CONTINUES DOSING PUMP B - AR J0PBM79AP001 PM 4 Weeks 26-Feb-22
PM - INSPECTION, RE-ALIGNMENT, & TIGHTENING FGD MIST ELIMINATOR FLUSH PUMP B - 1M J0HTQ12AP001 PM 4 Weeks 26-Feb-22
PM - LUBE OIL SAMPLING FGD MIST ELIMINATOR FLUSH PUMP B - 1M J0HTQ12AP001 PM 4 Weeks 26-Feb-22
PM - REPLACE LUBE OIL FGD MIST ELIMINATOR FLUSH PUMP B - 1M J0HTQ12AP001 PM 4 Weeks 26-Feb-22
PM - INSPECTION, RE-ALIGNMENT, & TIGHTENING WATER RING VACCUM PUMP A#2 - 1M 20MAJ21AP001 PM 4 Weeks 26-Mar-22
PM - LUBE OIL SAMPLING WATER RING VACCUM PUMP A#2 - 1M 20MAJ21AP001 PM 4 Weeks 26-Mar-22
PM - REPLACE LUBE OIL WATER RING VACCUM PUMP A#2 - AR 20MAJ21AP001 PM 4 Weeks 26-Mar-22
PM - INSPECTION, CLEANING, & ADJUST C02 BELT CONVEYOR - 1M J0EAC02AF101 PM 4 Weeks 26-Feb-22
PM - LUBE OIL SAMPLING C02 BELT CONVEYOR GEARBOX - 1M J0EAC02AF101 PM 4 Weeks 26-Feb-22
PM - REPLACE LUBE OIL C02 BELT CONVEYOR GEARBOX - AR J0EAC02AF101 PM 4 Weeks 26-Feb-22
OH - REPLACE LUBE OIL INDUCED DRAFT FAN B #1 - 1M 10HNC12AN001 OH 4 Weeks 26-Feb-22
OH - LUBE OIL SAMPLING INDUCED DRAFT FAN A #2 - 1M 20HNC11AN001 OH 4 Weeks 26-Mar-22
OH - REPLACE LUBE OIL SAMPLING INDUCED DRAFT FAN A #2 - AR 20HNC11AN001 OH 4 Weeks 26-Mar-22
OH - LUBE OIL SAMPLING INDUCED DRAFT FAN B #2 - 1M 20HNC12AN001 OH 4 Weeks 26-Mar-22
OH - REPLACE LUBE OIL SAMPLING INDUCED DRAFT FAN B #2 - AR 20HNC12AN001 OH 4 Weeks 26-Mar-22
OH - LUBE OIL SAMPLING PRIMARY AIR FAN A #2 - 1M 20HFE11AN001 OH 4 Weeks 26-Mar-22
OH - REPLACE LUBE OIL SAMPLING PRIMARY AIR FAN A #2 - AR 20HFE11AN001 OH 4 Weeks 26-Mar-22
OH - LUBE OIL SAMPLING PRIMARY AIR FAN B #2 - 1M 20HFE12AN001 OH 4 Weeks 26-Mar-22
OH - REPLACE LUBE OIL PRIMARY AIR FAN B #2 - AR 20HFE12AN001 OH 4 Weeks 26-Mar-22
OH - INSPECTION & CLEANING FORCE DRAFT FAN A #1 - 1M 10HLA11AN001 OH 4 Weeks 26-Feb-22
OH - LUBE OIL SAMPLING FORCE DRAFT FAN A #1 - 1M 10HLA11AN001 OH 4 Weeks 26-Feb-22
OH - REPLACE LUBE OIL FORCE DRAFT FAN A #1 - AR 10HLA11AN001 OH 4 Weeks 26-Feb-22
OH - INSPECTION, CLEANING, RE-ALIGNMENT, & TIGHTENING SEALING AIR FAN A #1 - 1M 10HFW11AN001 OH 4 Weeks 26-Feb-22
OH - LUBE OIL SAMPLING SEALING AIR FAN A #1 - 1M 10HFW11AN001 OH 4 Weeks 26-Feb-22
OH - REPLACE LUBE OIL SEALING AIR FAN A #1 - AR 10HFW11AN001 OH 4 Weeks 26-Feb-22
OH - INSPECTION & CLEANING SEALING AIR FAN A #2 - 1M 20HFW11AN001 OH 4 Weeks 26-Mar-22
OH - REPLACE LUBE OIL SEALING AIR FAN A #2 - 1M 20HFW11AN001 OH 4 Weeks 26-Mar-22
OH - INSPECTION & CLEANING STEAM TURBINE GENERATOR #1 10MA OH 4 Weeks 26-Feb-22
OH - INSPECTION & CLEANING STEAN TRUBINE GENERATOR #2 20MA OH 4 Weeks 26-Mar-22
PM - INSPECTION & CLEANING BLOWER #2 TANK STORAGE A - 1M J0PBM75AN002 PM 4 Weeks 26-Feb-22
PM - INSPECTION & CLEANING BLOWER #1 TANK STORAGE B - 1M J0PBM75AN003 PM 4 Weeks 26-Feb-22
PM - RE-ALIGNMENT & TIGHTENING CHEMICAL RAW WATER PUMP B - 1M J0GAF12AP001 PM 4 Weeks 26-Mar-22
PM - LUBE OIL SAMPLING CHEMICAL RAW WATER PUMP B - 1M J0GAF12AP001 PM 4 Weeks 26-Mar-22
PM - REPLACE LUBE OIL CHEMICAL RAW WATER PUMP B - AR J0GAF12AP001 PM 4 Weeks 26-Mar-22
PM - RE-ALIGNMENT & TIGHTENING FILTERED SEAWATER BOOSTER PUMP B - 1M J0GAB12AP001 PM 4 Weeks 26-Mar-22
PM - LUBE OIL SAMPLING FILTERED SEAWATER BOOSTER PUMP B - 1M J0GAB12AP001 PM 4 Weeks 26-Mar-22
PM - REPLACE LUBE OIL FILTERED SEAWATER BOOSTER PUMP B - AR J0GAB12AP001 PM 4 Weeks 26-Mar-22
PM - LUBE OIL SAMPLING BWRO WATER PUMP A - 1M J0GCF41AP001 PM 4 Weeks 26-Mar-22
PM - REPLACE LUBE OIL BWRO WATER PUMP A - AR J0GCF41AP001 PM 4 Weeks 26-Mar-22
PM - RE-ALIGNMENT & TIGHTENING FRESH WATER PUMP FOR WATER SUPPLY PUMP A - 1M J0GCF43AP001 PM 4 Weeks 26-Mar-22
PM - LUBE OIL SAMPLING FRESH WATER PUMP FOR WATER SUPPLY PUMP A - 1M J0GCF43AP001 PM 4 Weeks 26-Mar-22
PM - REPLACE LUBE OIL FRESH WATER PUMP FOR WATER SUPPLY PUMP A - AR J0GCF43AP001 PM 4 Weeks 26-Mar-22
PM - INSPECTION & CLEANING SCREW COMPRESSOR #A -1M J0QFA10AN001 PM 4 Weeks 26-Mar-22
PM - LUBE OIL SAMPLING SCREW COMPRESSOR #A - 1M J0QFA10AN001 PM 4 Weeks 26-Mar-22
PM - REPLACE LUBE OIL SCREW COMPRESSOR #A - AR J0QFA10AN001 PM 4 Weeks 26-Mar-22
PM - INSPECTION & CLEANING FGD MIST ELIMINATOR FLUSH PUMP A - 1M J0HTQ11AP001 PM 4 Weeks 26-Mar-22
PM - LUBE OIL SAMPLING FGD MIST ELIMINATOR FLUSH PUMP A - 1M J0HTQ11AP001 PM 4 Weeks 26-Mar-22
PM - REPLACE LUBE OIL FGD MIST ELIMINATOR FLUSH PUMP A - AR J0HTQ11AP001 PM 4 Weeks 26-Mar-22
PM - INSPECTION & CLEANING FGD ABSORBER PUMP A #1 - 1M 10HTF10AP001 PM 4 Weeks 26-Feb-22
PM - LUBE OIL SAMPLING FGD ABSORBER PUMP A #1 - 1M 10HTF10AP001 PM 4 Weeks 26-Feb-22
PM - REPLACE LUBE OIL FGD ABSORBER PUMP A #1 - AR 10HTF10AP001 PM 4 Weeks 26-Feb-22
PM - INSPECTION & CLEANING FGD ABRORBER PUMP B #1 - 1M 10HTF20AP001 PM 4 Weeks 26-Feb-22
PM - LUBE OIL SAMPLING FGD ABSORBER PUMP B #1 - 1M 10HTF20AP001 PM 4 Weeks 26-Feb-22
PM - REPLACE LUBE OIL FGD ABSORBER PUMP B #1 - AR 10HTF20AP001 PM 4 Weeks 26-Feb-22
PM - INSPECTION & CLEANING FGD AERATION FAN A - 1M J0HTG10AN001 PM 4 Weeks 26-Mar-22
PM - LUBE OIL SAMPLING FGD AERATION FAN A - 1M J0HTG10AN001 PM 4 Weeks 26-Mar-22
PM - REPLACE LUBE OIL FGD AERATION FAN A - AR J0HTG10AN001 PM 4 Weeks 26-Mar-22
PM - INSPECTION & CLEANING FGD AERATION FAN B - 1M J0HTG10AN002 PM 4 Weeks 26-Mar-22
PM - LUBE OIL SAMPLING FGD AERATION FAN B - 1M J0HTG10AN002 PM 4 Weeks 26-Mar-22
PM - REPLACE LUBE OIL FGD AERATION FAN B - AR J0HTG10AN002 PM 4 Weeks 26-Mar-22
PM - INSPECTION & CLEANING C01 BELT CONVEYOR GEARBOX B - 1M J0EAC01AF201 PM 4 Weeks 26-Mar-22
PM - LUBE OIL SAMPLING C01 BELT CONVEYOR GEARBOX B - 1M J0EAC01AF201 PM 4 Weeks 26-Mar-22
PM - REPLACE LUBE OIL C01 BELT CONVEYOR GEARBOX B - AR J0EAC01AF201 PM 4 Weeks 26-Mar-22
PM - INSPECTION & CLEANING C05 BELT CONVEYOR GEARBOX A - 1M J0EAC05AF101 PM 4 Weeks 26-Mar-22
PM - LUBE OIL SAMPLING C05 BELT CONVEYOR GEARBOX A - 1M J0EAC05AF101 PM 4 Weeks 26-Mar-22
PM - REPLACE LUBE OIL C05 BELT CONVEYOR GEARBOX A - AR J0EAC05AF101 PM 4 Weeks 26-Mar-22
PM - INSPECTION & CLEANING COAL CRUSHER A - 1M J0EBC05AJ101 PM 4 Weeks 26-Mar-22
PM - GREASE SAMPLING COAL CRUSHER A - 1M J0EBC05AJ101 PM 4 Weeks 26-Mar-22
PM - REPLACE GREASE COAL CRUSHER A - AR J0EBC05AJ101 PM 4 Weeks 26-Mar-22
PM - INSPECTION MEDIUM SPEED MILL C #1 - 1M 10HFC30AJ001 PM 4 Weeks 26-Feb-22
PM - LUBE OIL SAMPLING MEDIUM SPEED MILL C #1 - 1M 10HFC30AJ001 PM 4 Weeks 26-Feb-22
PM - REPLACE LUBE OIL SAMPLING SPEED MILL C #1 - AR 10HFC30AJ001 PM 4 Weeks 26-Feb-22
PM - INSPECTION & CLEANING MAIN BOILER FEED WATER PUMP B #1 - 1M 10LAC20AP001KP01 PM 4 Weeks 26-Feb-22
PM - LUBE OIL SAMPLING MAIN BOILER FEED WATER PUMP B #1 - 1M 10LAC20AP001KP01 PM 4 Weeks 26-Feb-22
PM - REPLACE LUBE OIL MAIN BOILER FEED WATER PUMP B #1 - AR 10LAC20AP001KP01 PM 4 Weeks 26-Feb-22
PM - INSPECTION & CLEANING MAIN BOILER FEED WATER PUMP A #2 - 1M 20LAC10AP001KP01 PM 4 Weeks 26-Mar-22
PM - LUBE OIL SAMPLING MAIN BOILER FEED WATER PUMP A #2 - 1M 20LAC10AP001KP01 PM 4 Weeks 26-Mar-22
PM - REPLACE LUBE OIL MAIN BOILER FEED WATER PUMP A #2 - AR 20LAC10AP001KP01 PM 4 Weeks 26-Mar-22
PM - INSPECTION & CLEANING MAIN BOILER FEED WATER PUMP B #2 - 1M 20LAC20AP001KP01 PM 4 Weeks 26-Mar-22
PM - LUBE OIL SAMPLING MAIN BOILER FEED WATER PUMP B #2 - 1M 20LAC20AP001KP01 PM 4 Weeks 26-Mar-22
PM - REPLACE LUBE OIL MAIN BOILER FEED WATER PUMP B #2 - AR 20LAC20AP001KP01 PM 4 Weeks 26-Mar-22
PM - INSPECTION & CLEANING WATER RING VACCUM PUMP A #1 - 1M 10MAJ21AP001 PM 4 Weeks 26-Feb-22
PM - LUBE OIL SAMPLING WATER RING VACCUM PUMP A #1 - 1M 10MAJ21AP001 PM 4 Weeks 26-Feb-22
PM - REPLACE LUBE OIL WATER RING VACCUM PUMP A #1 -AR 10MAJ21AP001 PM 4 Weeks 26-Feb-22
PM - INSPECTION & CLEANING WATER RING VACCUM PUMP B #2 - 1M 20MAJ22AP001 PM 4 Weeks 26-Mar-22
PM - LUBE OIL SAMPLING WATER RING VACCUM PUMP B #2 - 1M 20MAJ22AP001 PM 4 Weeks 26-Mar-22
PM - REPLACE WATER RING VACCUM PUMP B #2 - AR 20MAJ22AP001 PM 4 Weeks 26-Mar-22
PM - INSPECTION, CLEANING, ALIGNMENT, & TIGHTENING CLOSED CIRCUIT COOLING WATER (CCCW) PUMP 10PGA10AP001 PM 4 Weeks 26-Feb-22
A #1 - 1M
PM - GREASE SAMPLING CLOSED CIRCUIT COOLING WATER (CCCW) PUMP A #1 - 1M 10PGA10AP001 PM 4 Weeks 26-Feb-22
PM - RE-GREASE CLOSED CIRCUIT COOLING WATER (CCCW) PUMP A #1 - AR 10PGA10AP001 PM 4 Weeks 26-Feb-22
PM - INSPECTION & CLEANING CLOSED CIRCUIT COOLING WATER (CCCW) PUMP B #1 - 1M 10PGA10AP002 PM 4 Weeks 26-Feb-22
PM - GREASE SAMPLING CLOSED CIRCUIT COOLING WATER (CCCW) PUMP B #1 - 1M 10PGA10AP002 PM 4 Weeks 26-Feb-22
PM - RE-GREASE CLOSED CIRCUIT COOLING WATER (CCCW) PUMP B #1 - AR 10PGA10AP002 PM 4 Weeks 26-Feb-22
PM - INSPECTION & CLEANING CONTROL FLUID MAIN PUMP B #1 - 1M 10MXA10AP102 PM 4 Weeks 26-Feb-22
PM - LUBE OIL SAMPLING CONTROL FLUID MAIN PUMP B #1 - 1M 10MXA10AP102 PM 4 Weeks 26-Feb-22
PM - REPLACE LUBE OIL CONTROL FLUID MAIN PUMP B #1 - AR 10MXA10AP102 PM 4 Weeks 26-Feb-22
PM - INSPECTION & CLEANING CONTROL FLUID MAIN PUMP B #2 - 1M 20MXA10AP102 PM 4 Weeks 26-Mar-22
PM - LUBE OIL SAMPLING CONTROL FLUID MAIN PUMP B #2 - 1M 20MXA10AP102 PM 4 Weeks 26-Mar-22
PM - REPLACE LUBE OIL CONTROL FLUID MAIN PUMP B #2 - AR 20MXA10AP102 PM 4 Weeks 26-Mar-22