ES/4-203-01

Document No. Rev. Page


Data Sheet for
STORAGE TANK 1942-R-SB-0000-048-*
1891-R-SB-0000-062-* A 2 of 2 .

Notes
Project Title Client Project No.

Notes
Line

Line
Rev

Rev
Sara Development
Zamzama Process
EPT Facilities BHPTullow Pakistan
Petroleum Pty Ltd 1891
Equipment (Developments) Ltd.
1 General 53 VacuumChemicals Ltd.
2 Eqpt. No. D-0006 54 Corrosion Allowance 1.5 mm
3 Eqpt. Name LEAN GLYCOL STORAGE TANK 55 Stress Relieving -
4 Service LEAN GLYCOL 56 Radiography Acc. to code
5 o Flammable o Toxic o Lethal 57 Joint Efficiency Shell Acc. to code
6 o H2S o Chloride o Other 58 Head - Shell Acc. to code
7 No. of Units ONE 59 o Inside -
8 Applicable Code API 650 60 Passivation o Outside -
9 Code Stamping o Y o N 61 o Welds Only -
10 Process Conditions 62 Surface Preparation -
11 Contents GLYCOL 63 o Lugs o Saddles
12 Capacity Nominal 16.25CU.M 64 Support Type o Legs o Skirt
13 Operating 65 o Other
14 Agitation o Yes o No 66 Materials
15 Orientation o Horizontal o Vertical 67 Shell CS
16 o Heated o Cooled 68 Head CS
17 o Half Coil o Coil o Jacketed 69 Cladding / Lining
18 o Other 70 Supports
19 o Yes o No 71 Insulation Clips
20 Insulation o Hot 72 Insulation Cladding
21 o Cold 73 Internals
22 o Personal Protection Only 74 Jacket
23 Insulation Type - 75 Body Flanges
24 Insulation Thickness - 76 Pad Flanges
25 Surface - 77 Nozzle Pipe
26 Design Data 78 Nozzle Flanges
27 Diameter Inside 3000 mm 79 Manhole Neck
28 Outside - 80 Fittings
29 Head Type Top / Right Conical 81 Nozzle Pads
30 Bottom / Left Flat (Sloped) 82 Bolts (Internal)
31 Tan-Tan Length 2300 mm 83 Nuts (Internal)
32 Pressure Temperature 84 Bolts (External)
33 Operating Max. Atm 35°C 85 Nuts (External)
34 Operating Min. Atm <35°C 86 Gaskets (Internal)
35 Design Atm 55°C 87 Gaskets (External)
36 Sketch
37
38
39
40
41
42
43
44 3000
45
2300

46
47
48
49
50
51
52
53 (Continued on next page)
ES/4-203-01

Document No. Rev. Page


Data Sheet for
STORAGE TANK 1942-R-SB-0000-048-*
1891-R-SB-0000-062-* A 2 of 2 .

Notes
Project Title Client Project No.

Notes
Line

Line
Rev

Rev
Sara Development
Zamzama Process
EPT Facilities BHPTullow Pakistan
Petroleum Pty Ltd 1891
Equipment (Developments) Ltd.
54 Site Conditions 1 Testing Chemicals
Location o Ltd.Site o Shop
55 Seismic Factor 100 cm/sec2 2 Testing Media WATER
56 Wind Velocity 30 m/sec 3 Testing Pressure
57 Location o Inside o Outside 4 Holding Time
58 Weights 5
59 Erection 6
60 Empty 7
61 Filled with Water 8
62 Nozzle Data
63 Mark No. Size Service Rating Flg. Type Projection Location from Datum
64 1" INLET 150# SORF
65 1" OUTLET 150# SORF
66 1" DRAIN 150# SORF
67 2" VENT 150# SORF `
68 24" MANHOLE (Top & Side) 150# SORF
69 1" LEVEL INDICATOR 150# SORF
70
71
72
73
74
75
76
77
78
79 Note(s)
80
81
82
83
84
85
86
87
88
89
90
91
Rev. Date Description Prepared By Checked By Approved By
Initial Signature Initial Signature Initial Signature
A 24.06.99 ISSUED FOR PROPOSAL IS SW IMA