Document No. Rev.

Page
Data Sheet for
DISTILLATION COLUMN 1891-R-SB-0000-051-* A 1 of 2 .

Project Title Client Project No.

Notes

Notes
Line

Line
Rev

Rev
Zamzama EPT Facilities BHP Petroleum Pty Ltd 1891

1 General 54 Vacuum -
2 Eqpt. No. C-0004 55 Corrosion Allowance 3 mm
3 Eqpt. Name Glycol Contactor 56 Stress Relieving As per code
4 Service TEG, Water & Hydrocarbon 57 Radiography As per code
5 o Flammable o Toxic o Lethal 58 Joint Efficiency Shell 1.0
6 o H2S o Chloride o Other 59 Head - Shell 1.0
7 No. of Units One 60 o Inside -
8 Applicable Code ASME VIII Div. 1 61 Passivation o Outside -
9 Code Stamping o Y o N 62 o Welds Only -
10 Process Conditions 63 Surface Preparation -
11 Contents TEG, Water & Hydrocarbon 64 o Lugs o Saddles
12 Capacity Nominal 17.0 CU.M 65 Support Type o Legs o Skirt
13 Operating - 66 o Other
14 o Heated o Cooled 67 Materials
15 o Half Coil o Coil o Jacketed 68 Shell A516 Gr. 70
16 o Other 69 Cladding / Lining -
17 o Yes o No 70 Supports CS
18 Insulation o Hot 71 Insulation Clips
19 o Cold 72 Insulation Cladding
20 o Personal Protection Only 73 Internals
21 Insulation Type - 74 Jacket -
22 Insulation Thickness - 75 Body Flanges
23 Surface - 76 Pad Flanges
24 Design Data 77 Nozzle Pipe
25 Diameter Inside 1630 mm 78 Nozzle Flanges A-105
26 Outside 79 Manhole Neck
27 Column Height 7620 mm 80 Fittings -
28 Column Internals Trays 81 Nozzle Pads A-516 GR.70
29 Type of Packing/ Plate Bubble Cap 82 Bolts (Internal) -
30 No. of Trays 8 83 Nuts (Internal) -
31 Spacing b/w Trays 609 mm 84 Bolts (External) A-193 B7
32 No. of Inlet Streams 2 85 Nuts (External) A-194 2H
33 No. of Outlet Streams 2 86 Gaskets (Internal) -
34 Pressure Temperature 87 Gaskets (External) SW(SS316)Filled with PTFE
35 Operating Max. 90.3 bar(g) 38°C 88
36 Operating Min. 89
37 Design 100 bar(g) 60°C 90
38 Sketch
39
40 P2 N4
41
42
N2
43
P1
44 DEMISTER
T1
45
46
47
48
M1 L1
49
50 N1 N5
51 L4 L2
52 L5 L3
53 N3 (Continued on next page)
1 (Continued from previous page) 46 Testing Data

573586947.xls
Document No. Rev. Page
Data Sheet for
DISTILLATION COLUMN 1891-R-SB-0000-051-* A 1 of 2 .

Project Title Client Project No.

Notes

Notes
Line

Line
Rev

Rev
Zamzama EPT Facilities BHP Petroleum Pty Ltd 1891

2 4 Site Conditions 47 Testing Location o Site o Shop


3 Seismic Factor 100 cm/sec2 48 Testing Media Water
4 Wind Velocity 30 m/sec 49 Testing Pressure 150 Bar(g)
5 Location o Inside o Outside 50 Holding Time
6 5 Weights 51
7 Erection 52
8 Empty 53
9 Filled with Water 54
10 Nozzle Data
11 Mark No. Size Service Rating Flg. Type Projection Location from Datum
12 1 N1 10" GAS INLET 600 # WNRF
13 1 N2 2" TEG INLET 600 # WNRF
14 1 N3 2" TEG OUTLET 600 # WNRF
15 1 N4 10" GAS OUTLET 600 # WNRF
16 1 N5 2" DRAIN 600 # WNRF
17 2 M1 24" MANHOLE 600 # WNRF
18 3 P1 1" PRESSURE INDICATOR 600 # WNRF
19 P2 4" PSV 600 # WNRF
20 3 T1 1" TEMPERATURE IND. 600 # WNRF
21 L1 2" LEVEL GAUGE 600 # WNRF
22 L2 2" LEVEL GAUGE 600 # WNRF
23 L3 2" LEVEL SWITCH 600 # WNRF
24 L4 2" LEVEL CONTROLLER 600 # WNRF
25 T2 1" TEMPERATURE IND. 600 # WNRF
26 NP - NAME PLATE
27 P3 1" PRESSURE TRANSMITER 600 # WNRF
28 P4 1" PRESSURE TRANSMITER 600 # WNRF
29 P5 1" PRESSURE SWITCH 600 # WNRF
30 P6 1" PRESSURE SWITCH 600 # WNRF
31 Note(s)
32 1. With counter flange, gasket and bolting
33 2. With hinged cover
34 3. To be confirmed by instrument.
35 4. Site conditions will be confirmed by client
36 5. Refer mechanical drawings for weights.
37
38
39
40
41
42
43
44
Rev. Date Description Prepared By Checked By Approved By
Initial Signature Initial Signature Initial Signature
A 22.6.99 ISSUED FOR PROPOSAL IS SW IMA

573586947.xls

You might also like