Call Off Contract For Civil Works Inspection Checklist For Installation of Security Systems

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

Checklist No.

BEC-COC-MAF-EL-CKL-010
CALL OFF CONTRACT FOR CIVIL WORKS
Rev.No. 0

INSPECTION CHECKLIST FOR INSTALLATION OF SECURITY Ref.Doc No


SYSTEMS
Rev.No.

Contract No: C 311545

Location :-

Description :-

Drawing(s) and Revision No.: WIR NO :


Sl.
No Checks N/A YES NO Remarks

Check Material / Items Received model, type,


1 make as per approved MAS and Receiving
Inspection cleared.

2 Check all the accessories are as per approved


MAS

Check the Intrusion panel, Video door phone and


3 accessories physical condition for any visual
damages.

4 Ensure drawings used for installation are current


and approved.

Check all the Intrusion panel, Video door phone


5 and accessories types/models are installed as per
approved Drawing.

Check adequate protection of Intrusion panel,


6 Video door phone and accessories against
damage,

7 Check the Location of Intrusion panel, Video door


phone as per approved drawing

Check the Intrusion panel, Video door phone and


8 accessories installed as per manufacturers
recommendation and approved drawing.

9 Check the cable laid and terminated properly

10 Check the Installation work Neat & tidy


workmanship

Use tick mark for applicable

Comments:

Organization BEC PDO

Name

Signature

Date

You might also like