FACET summary of comments:

1. Architec to review and confirm modulation, profile color and finishes.


2. All gaskets should be 70±5 Sh A. Provide minimum gasket thickness to meet the compression requirements. Architect to review & confirm the
3. The contractor should get the endorsement certificate from gasket and sealant manufacturer for their product application. modulation, profile and finishes.
4. All aluminum profiles are of 6063 T6 alloy. All brackets and connecting cleats are of 6061 T6.
5. All intersection joints should be air and water tight.
6. Transom cap should be 1mm shorter than mullion cap to avoid sharp edges.
7.The contractor should follow glass quality parameters as per specification.
8.All the welding connection,thickness of the welding should refer structural calculation report &update accordingly
9.All the bolts & nut should be SS316 A4-70 grade.

FACET 05-03-2021
Date Received: _______________________

11-03-2021
Date Returned: ______________________

Document Type:

Approved
Disapproved Except as Noted
No Action Required by FACET
X Approved as Noted
Disapproved

NL
Manjunath
Reviewed by: _________________________
The Status of this document does not release the contractor
from his responsibilities towards the contract.
Architect to review & confirm the
modulation, profile and finishes.

FACET 05-03-2021
Date Received: _______________________

11-03-2021
Date Returned: ______________________

Document Type:

Approved
Disapproved Except as Noted
No Action Required by FACET
X Approved as Noted
Disapproved

NL
Manjunath
Reviewed by: _________________________
The Status of this document does not release the contractor
from his responsibilities towards the contract.
Bracket and anchors
are subject to
2mm
FACET 05-03-2021
Date Received: _______________________
structural check.
Please submit the 11-03-2021
Date Returned: ______________________
calculation.
Document Type:

Approved
Disapproved Except as Noted
No Action Required by FACET
Fin shown in Tender.
However architect to Approved as Noted

confirm for Flashing X Disapproved

NL
Manjunath
Reviewed by: _________________________
The Status of this document does not release the contractor
from his responsibilities towards the contract.

Provide Insulation
FACET 05-03-2021
Date Received: _______________________

11-03-2021
Date Returned: ______________________

Document Type:

X Approved
Disapproved Except as Noted
No Action Required by FACET
Approved as Noted

Disapproved

NL
Manjunath
Reviewed by: _________________________
The Status of this document does not release the contractor
from his responsibilities towards the contract.
FACET 05-03-2021
Date Received: _______________________

11-03-2021
Date Returned: ______________________

Document Type:

X Approved
Disapproved Except as Noted
No Action Required by FACET
Approved as Noted

Disapproved

NL
Manjunath
Reviewed by: _________________________
The Status of this document does not release the contractor
from his responsibilities towards the contract.
Bracket and anchors
are subject to

FACET 05-03-2021
structural check.
Please submit the
calculation.
Date Received: _______________________

11-03-2021
Date Returned: ______________________

Document Type:

Approved
Disapproved Except as Noted
No Action Required by FACET
Approved as Noted
X Disapproved

NL
Manjunath
Reviewed by: _________________________
The Status of this document does not release the contractor
from his responsibilities towards the contract.

Fin shown in Tender.


However architect to
confirm for Flashing

Provide insulation
Show the horizontal slots

FACET 05-03-2021
Date Received: _______________________

11-03-2021
Date Returned: ______________________

Document Type:

Approved
Disapproved Except as Noted
No Action Required by FACET
Approved as Noted
X Disapproved

NL
Manjunath
Reviewed by: _________________________
The Status of this document does not release the contractor
from his responsibilities towards the contract.
FACET 05-03-2021
Date Received: _______________________

11-03-2021
Date Returned: ______________________

Document Type:

Approved
Disapproved Except as Noted
No Action Required by FACET
X Approved as Noted
Disapproved

NL
Manjunath
Reviewed by: _________________________
The Status of this document does not release the contractor
from his responsibilities towards the contract.

Keep sufficient gap to


accommodate the
construction tolerance
FACET 05-03-2021
Date Received: _______________________

11-03-2021
Date Returned: ______________________

Document Type:

X Approved
Disapproved Except as Noted
No Action Required by FACET
Approved as Noted

Disapproved

NL
Manjunath
Reviewed by: _________________________
The Status of this document does not release the contractor
from his responsibilities towards the contract.
FACET 05-03-2021
Date Received: _______________________

11-03-2021
Date Returned: ______________________

Document Type:

X Approved
Disapproved Except as Noted
No Action Required by FACET
Approved as Noted

Disapproved

NL
Manjunath
Reviewed by: _________________________
The Status of this document does not release the contractor
from his responsibilities towards the contract.
FACET 05-03-2021
Date Received: _______________________

11-03-2021
Date Returned: ______________________

Document Type:

X Approved
Disapproved Except as Noted
No Action Required by FACET
Approved as Noted

Disapproved

NL
Manjunath
Reviewed by: _________________________
The Status of this document does not release the contractor
from his responsibilities towards the contract.
FACET 05-03-2021
Date Received: _______________________

11-03-2021
Date Returned: ______________________

Document Type:

Approved
Architect to review and
Disapproved Except as Noted
confirm handle length
No Action Required by FACET
and finish
X Approved as Noted
Disapproved

NL
Manjunath
Reviewed by: _________________________
The Status of this document does not release the contractor
from his responsibilities towards the contract.
FACET 05-03-2021
Date Received: _______________________

11-03-2021
Date Returned: ______________________

Document Type:

Approved
Disapproved Except as Noted
No Action Required by FACET
X Approved as Noted
Disapproved

NL
Manjunath
Reviewed by: _________________________
The Status of this document does not release the contractor
from his responsibilities towards the contract.

Handle & finish of all


Arch. to confirm the

hardware
FACET 05-03-2021
Date Received: _______________________

11-03-2021
Date Returned: ______________________

Document Type:

X Approved
Disapproved Except as Noted
No Action Required by FACET
Approved as Noted

Disapproved

NL
Manjunath
Reviewed by: _________________________
The Status of this document does not release the contractor
from his responsibilities towards the contract.
FACET 05-03-2021
Date Received: _______________________

11-03-2021
Date Returned: ______________________

Document Type:

X Approved
Disapproved Except as Noted
No Action Required by FACET
Approved as Noted

Disapproved

NL
Manjunath
Reviewed by: _________________________
The Status of this document does not release the contractor
from his responsibilities towards the contract.