JUNE JULY
ITEM NO. SCOPE OF WORK START DATE TARGET DATE 29 30 1 2 3 4 5 6 7 8 9 10
1 PAINTING WORKS
2 LAY-OUT
3 FABRICATION AND INSTALLATION OF HANGER
4 INSTALLATION OF 2'-Ø PIPE GF (DRAIN PIPE)
5 INSTALLATION OF 2'-Ø PIPE 2F (DRAIN PIPE)
6 INSTALLATION OF 2'-Ø PIPE 3F (DRAIN PIPE)
7 CORING WORKS
8 INSTALLATION OF RISER
9 TAPPING AND INSTALLATION OF FIRE HOSE CABINET
9 DRAIN SYSTEM
10 PRESSURE TEST