DOCUMENT CHECKLIST Contract Registration No. ____________________ Change Order No. __________ Check all that apply: [ ] <=$50,000 [ ] > $50,000 [ ] No Cost Change Order [ ] Credit Change Order [ ] Client/Sponsor Request [ ] Non-material Scope Change [ ] CM Build/Design Build [ ] Requirements Contract The following documents constitute a complete change order package: ORIG. COPIES DOCUMENT ENCLOSED/AT SITE
1 1 Document Checklist (this form) µ []
0 2 Change Order Log Entry for this Change Order µ [] 1 1 Contract Change Form (Parts A, B, C and D) µ [] 0 2 Contractor’s/CM’s Cost Proposal µ [•] 1 1 DDC Estimate µ (or DDC review copy of Contractor’s [] Cost Proposal) 0 2 Specs and/or drawings relative to CO condition µ [] (if applicable) 0 2 Pertinent Correspondence (if applicable) [] 1 0 Change Order Log(s) (at site for EAO Audit) [] 0 2 Proposed Task Order/Supplemental Task Order (for [] change orders on requirements contracts only if applicable) 0 2 125% Overrun Justification Report [] (for change orders on unit-priced contracts and requirements contracts, if applicable) 0 2 Bid Analysis (Top 3 bidders unit prices) [] (back -up to 125% Overrun Report, if applicable) 1 1 Cost Proposal For Unit Price (if applicable) µ [ ] or [•] 0 2 Last Approved Time Extension (if applicable) [] 0 2 Letter documenting Emergency Situation (if applicable) [] 0 2 Client/Sponsor Agency Letter (if client requested change) [] 1 1 Certification Memo (if applicable) [] Note: This form can be used only when a contract’s time has expired and a Time Extension cannot be approved. 0 2 Comptroller’s or Agency Head’s Dispute Determination [] (if applicable) IF CM BUILD/CM DESIGN BUILD**: 0 2 Staffing numbers and schedules tied into project phase µ [•] (if applicable) 0 2 Staffing rates µ (if applicable) [•] 0 2 Bids, estimates for material & labor, specs and/or [•] drawings, approved Subcontractor CO/OR Authorizations µ (when CM change orders on construction allowances are due to or include previously approved subcontract change orders or overruns) 0 2 Letter of Approval for Allowance Transfer (if applicable) [•] 1 0 CM Change Order Log (at site for EAO Audit) [•] 0 2 Subcontract CO/OR Authorization (Parts A & B) µ [•] (for Subcontract CO/OR) 1 1 Notarized cost pricing certificate (for Subcontract CO/OR) [•] 0 2 Subcontractor’s cost proposal (for Subcontract CO/OR) µ [•] 0 2 Bids, if applicable (for Subcontract CO/OR) µ [•] _________________________________________________________________________________________ ___ NOTES: 1. An original is a document with an original signature. All originals must be signed with blue ink. 2. [ ]: Submitted by RE/CPM; [•]: Submitted by Contractor; µ: Required at negotiations. 3. ** Additional requirements. Note: RE/CPM to check off [√] all documents enclosed/at site. docckl 09/01/98; rev. 10/15/99