Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 8

Curves under ADEN FZD

Rate of change of Cannt =


35mm/sec
Speed on TL
Transition Length Speed on TL
Location TL Vm (Based on Ca) (Based on
Actual Equilibrium Cd) Permitted Remark Remark from SSE Section
Curve Actual Cd
No. UP/DN Radius Min TL Cannt Cannt utilised Speed on
Ca 0.27(((Ca+C Ce Min TL HWH End Curve
HWH
From Km. To Km. DLI End
End d)*R)^0.5) (125*TL)/Ca (125*TL)/Cd

17 1172.23 1172.49 UP 8750 50 50 50 8 262.47 40.31 32.31 781.25 193.41 193.41 Okay
18 1173.45 1173.93 UP 8750 70 70 70 20 276.67 40.31 20.31 437.50 430.72 276.67 At site 21 mm and 15mm
19 1179.49 1180.08 UP 8750 60 50 50 10 264.89 40.31 30.31 625.00 206.17 206.17 At site 9mm
20 1181.26 1181.63 UP 8750 60 60 60 6 260.03 40.31 34.31 1250.00 218.56 218.56 At site 9 mm
21 1181.84 1182.18 UP 8750 50 50 50 9 263.68 40.31 31.31 694.44 199.59 199.59 There is no curve
22 1191.42 1191.83 UP 6980 60 60 60 10 236.59 50.54 40.54 750.00 185.01 185.01 Okay
23 1192.7 1193.13 UP 6980 70 70 70 10 236.59 50.54 40.54 875.00 215.85 215.85 Okay
24 1210.4 1211.64 UP 3500 100 100 100 30 182.12 100.79 70.79 416.67 176.59 176.59 Compound Curve At site 15,17,,18,27mm
25 1211.67 1211.97 UP 2333 120 120 120 65 167.52 151.20 86.20 230.77 174.01 167.52 At site 60mm
26 1212.6 1213.02 UP 6980 60 70 60 9 235.51 50.54 41.54 833.33 180.56 180.56 Okay
1 1220.95 1221.26 UP 3593 100 100 100 18 175.81 98.18 80.18 694.44 155.90 155.90
2 1221.287 1221.557 UP 2333 100 100 100 52 160.78 151.20 99.20 240.38 126.00 126.00
3 1222.13 1222.4 UP 2941 70 70 70 35 170.13 119.94 84.94 250.00 103.01 103.01
4 1222.61 1222.85 UP 3452 60 60 60 30 180.87 102.19 72.19 250.00 103.89 103.89 PSR 120kmph
5 1228.87 1229.54 UP 6917 50 50 50 12 237.65 51.00 39.00 520.83 160.26 160.26
6 1229.89 1230.05 UP 10000 30 30 30 8 280.59 35.28 27.28 468.75 137.49 137.49
7 1231.11 1231.23 UP 10000 30 30 30 8 280.59 35.28 27.28 468.75 137.49 137.49
8 1231.23 1231.37 UP 10000 30 30 30 8 280.59 35.28 27.28 468.75 137.49 137.49
9 1232.97 1233.19 UP 8333 60 60 60 10 258.50 42.33 32.33 750.00 231.97 231.97
10 1233.22 1233.44 UP 10000 60 60 60 8 280.59 35.28 27.28 937.50 274.97 274.97
11 1240.77 1240.97 UP 6917 30 30 30 10 235.52 51.00 41.00 375.00 91.47 91.47
12 1240.97 1241.15 UP 7143 30 30 30 10 239.33 49.38 39.38 375.00 95.21 95.21
13 1241.2 1241.49 UP 6917 50 50 50 10 235.52 51.00 41.00 625.00 152.44 152.44
14 1241.54 1241.74 UP 6917 50 50 50 10 235.52 51.00 41.00 625.00 152.44 152.44
18 1173.45 1173.93 DN 7000 50 60 50 15 242.25 50.39 35.39 416.67 176.59 176.59 At site 9mm
19 1179.49 1180.08 DN 8750 60 60 60 9 263.68 40.31 31.31 833.33 239.50 239.50 Okay
BBL Yd. 1181.26 1181.63 DN 8750 60 60 60 9 263.68 40.31 31.31 833.33 239.50 239.50 There is no curve
BBL Yd. 1181.84 1182.18 DN 8750 60 60 60 9 263.68 40.31 31.31 833.33 239.50 239.50 There is no curve
22 1191.42 1191.83 DN 6850 60 60 60 9 233.30 51.50 42.50 833.33 176.48 176.48 Okay
23 1192.7 1193.13 DN 6850 60 50 50 15 239.64 51.50 36.50 416.67 171.25 171.25 At site 9mm
24 1210.4 1211.67 DN 3500 100 120 100 33 184.21 100.79 67.79 378.79 184.40 184.21 Compound Curve At site 21mm and 33 mm
25 1211.67 1211.97 DN 2350 100 120 100 65 168.13 150.11 85.11 192.31 146.87 146.87 PSR 120kmph At site 50mm
26 1212.6 1213.02 DN 6850 60 60 60 15 239.64 51.50 36.50 500.00 205.50 205.50 PSR 110kmph At site 9mm
1 1220.98 1221.24 DN 6250 60 60 60 10 223.87 56.44 46.44 750.00 161.50 161.50
2 1221.24 1221.56 DN 7145 60 60 60 10 239.37 49.37 39.37 750.00 190.50 190.50
3 1222.25 1222.46 DN 6250 50 50 50 12 225.90 56.44 44.44 520.83 140.64 140.64
4 1222.46 1222.67 DN 5000 60 60 60 12 202.05 70.55 58.55 625.00 128.09 128.09
5 1228.62 1229.36 DN 6250 80 80 80 12 225.90 56.44 44.44 833.33 225.02 225.02
6 1229.82 1230.06 DN 10000 50 50 50 8 280.59 35.28 27.28 781.25 229.14 229.14
7 1230.11 1230.33 DN 10000 50 50 50 8 280.59 35.28 27.28 781.25 229.14 229.14
9 1232.86 1233.08 DN 8383 60 60 60 10 259.27 42.08 32.08 750.00 233.79 233.79
10 1233.13 1233.36 DN 8383 60 60 60 10 259.27 42.08 32.08 750.00 233.79 233.79
11 1240.31 1240.64 DN 2273 120 120 120 60 162.83 155.19 95.19 250.00 157.57 157.57
12 1240.72 1241.03 DN 2273 120 120 120 60 162.83 155.19 95.19 250.00 157.57 157.57
13 1241.11 1241.38 DN 2273 120 120 120 60 162.83 155.19 95.19 250.00 157.57 157.57
14 1241.44 1241.75 DN 2273 120 120 120 60 162.83 155.19 95.19 250.00 157.57 157.57
17 1170.077 1170.357 DN 9722 60 60 60 8 276.66 36.28 28.28 937.50 265.16 265.16 This curve added
Proposed Curve caculations under ADEN FZD
Rate of change of Cannt
= 35mm/sec
Transition Speed on TL Speed on TL
Location Length Vm (Based on (Based on
Curve UP/ TL Min Actual Equi. Actual Ca) Cd) Permitted Remarks/Action Planned
Radius Cannt Cannt Cd Speed on
No. DN TL Min TL HWH End
From HWH DLI Ca 0.27(((Ca+C Ce utilised Curve
Km. To Km. End End d)*R)^0.5) (125*TL)/Ca (125*TL)/Cd

1 1220.95 1221.26 UP 3593 100 100 100 30 184.53 98.18 68.18 416.67 183.34 183.34 Increase SE from 18 to 30mm

Increase TL from 100 to 120mm and


2 1221.287 1221.557 UP 2333 120 120 120 65 167.52 151.20 86.20 230.77 174.01 167.52 SE from 52 to 65mm

3 1222.13 1222.4 UP 2941 70 70 70 60 185.21 119.94 59.94 145.83 145.97 145.83 Increase SE from 35 to 60mm

Increase SE from 30 to 50mm, PSR


4 1222.61 1222.85 UP 3452 60 60 60 50 194.29 102.19 52.19 150.00 143.71 143.71
120kmph

5 1228.87 1229.54 UP 6917 50 50 50 25 251.06 51.00 26.00 250.00 240.40 240.40 Increase SE from 10 to 25mm

6 1229.89 1230.05 UP 10000 30 30 30 15 289.54 35.28 20.28 250.00 184.95 184.95 Increase SE from 8 to 15mm

7 1231.11 1231.23 UP 10000 30 30 30 15 289.54 35.28 20.28 250.00 184.95 184.95 Increase SE from 8 to 15mm

8 1231.23 1231.37 UP 10000 30 30 30 15 289.54 35.28 20.28 250.00 184.95 184.95 Increase SE from 8 to 15mm

11 1240.77 1240.97 UP 6917 40 40 40 25 251.06 51.00 26.00 200.00 192.32 192.32 Increase TL from 30 to 40mm and SE
from 10 to 25mm
Increase TL from 30 to 40mm and SE
12 1240.97 1241.15 UP 7143 40 40 40 25 255.13 49.38 24.38 200.00 205.05 200.00 from 10 to 25mm

13 1241.2 1241.49 UP 6917 50 50 50 25 251.06 51.00 26.00 250.00 240.40 240.40 Increase SE from 10 to 25mm

14 1241.54 1241.74 UP 6917 50 50 50 25 251.06 51.00 26.00 250.00 240.40 240.40 Increase SE from 10 to 25mm
Proposed Curve caculations under ADEN FZD
Rate of change of Cannt
= 35mm/sec
Transition Speed on TL Speed on TL
Location Length Vm (Based on (Based on
TL Actual Equi. Actual Ca) Cd) Permitted Remarks/Action Planned
Curve UP/ Radius Min Cannt Cannt Cd Speed on
No. DN TL
Ca Ce utilised Min TL HWH End Curve
From HWH DLI 0.27(((Ca+C
Km. To Km. End End d)*R)^0.5) (125*TL)/Ca (125*TL)/Cd

25 1211.67 1211.97 DN 2350 120 120 120 65 168.13 150.11 85.11 230.77 176.24 168.13 HWH End TL to be increased from
100 to 120mm, PSR 120kmph

3 1222.25 1222.46 DN 6250 50 50 50 25 238.65 56.44 31.44 250.00 198.79 198.79 Increase SE from 12 to 25mm

4 1222.46 1222.67 DN 5000 60 60 60 30 217.68 70.55 40.55 250.00 184.95 184.95 Increase SE from 12 to 30mm

11 1240.31 1240.64 DN 2273 120 120 120 65 165.35 155.19 90.19 230.77 166.31 165.35 Increase SE from 60 to 65mm

12 1240.72 1241.03 DN 2273 120 120 120 65 165.35 155.19 90.19 230.77 166.31 165.35 Increase SE from 60 to 65mm

13 1241.11 1241.38 DN 2273 120 120 120 65 165.35 155.19 90.19 230.77 166.31 165.35 Increase SE from 60 to 65mm

14 1241.44 1241.75 DN 2273 120 120 120 65 165.35 155.19 90.19 230.77 166.31 165.35 Increase SE from 60 to 65mm
Details of Curves in the Section SSE/PW/SKB under ADEN/FZD
Rate of change of Cannt
= 35mm/sec
Transition Speed on TL Speed on TL
Location Length Vm (Based on (Based on Remark from SSE
TL Actual Equilibrium Actual Ca) Cd) Permitted Remark
Curve UP/ Section
Radius Min TL Cannt Cannt Cd Speed on
No. DN Ca 0.27(((Ca+ Ce utilised Min TL HWH End Curve
HWH
From Km. To Km. End DLI End Cd)*R)^0.5 (125*TL)/
) (125*TL)/Ca Cd

17 1172.23 1172.49 UP 8750 50 50 50 8 262.47 40.31 32.31 781.25 193.41 193.41


Okay
18 1173.45 1173.93 UP 8750 70 70 70 20 276.67 40.31 20.31 437.50 430.72 276.67 At site 21 mm and
15mm
19 1179.49 1180.08 UP 8750 60 50 50 10 264.89 40.31 30.31 625.00 206.17 206.17
At site 9mm
20 1181.26 1181.63 UP 8750 60 60 60 6 260.03 40.31 34.31 1250.00 218.56 218.56
At site 9 mm
21 1181.84 1182.18 UP 8750 50 50 50 9 263.68 40.31 31.31 694.44 199.59 199.59
There is no curve
22 1191.42 1191.83 UP 6980 60 60 60 10 236.59 50.54 40.54 750.00 185.01 185.01
Okay
23 1192.7 1193.13 UP 6980 70 70 70 10 236.59 50.54 40.54 875.00 215.85 215.85
Okay
24 1210.4 1211.64 UP 3500 100 100 100 30 182.12 100.79 70.79 416.67 176.59 176.59 Compound Curve At
site 15,17,,18,27mm
25 1211.67 1211.97 UP 2333 120 120 120 65 167.52 151.20 86.20 230.77 174.01 167.52
At site 60mm
26 1212.6 1213.02 UP 6980 60 70 60 9 235.51 50.54 41.54 833.33 180.56 180.56
Okay
Details of Curves in the Section SSE/PW/FZD under ADEN/FZD
Rate of change of Cannt
= 35mm/sec
Transition Speed on TL Speed on TL
Location Length Vm (Based on (Based on Remark from SSE
TL Actual Equilibrium Actual Ca) Cd) Permitted Remark
Curve UP/ Section
Radius Min TL Cannt Cannt Cd Speed on
No. DN Ca 0.27(((Ca+ Ce utilised Min TL HWH End Curve
HWH
From Km. To Km. End DLI End Cd)*R)^0.5 (125*TL)/
) (125*TL)/Ca Cd

1 1220.95 1221.26 UP 3593 100 100 100 18 175.81 98.18 80.18 694.44 155.90 155.90

2 1221.287 1221.557 UP 2333 100 100 100 52 160.78 151.20 99.20 240.38 126.00 126.00

3 1222.13 1222.4 UP 2941 70 70 70 35 170.13 119.94 84.94 250.00 103.01 103.01

4 1222.61 1222.85 UP 3452 60 60 60 30 180.87 102.19 72.19 250.00 103.89 103.89 PSR 120kmph

5 1228.87 1229.54 UP 6917 50 50 50 12 237.65 51.00 39.00 520.83 160.26 160.26

6 1229.89 1230.05 UP 10000 30 30 30 8 280.59 35.28 27.28 468.75 137.49 137.49

7 1231.11 1231.23 UP 10000 30 30 30 8 280.59 35.28 27.28 468.75 137.49 137.49

8 1231.23 1231.37 UP 10000 30 30 30 8 280.59 35.28 27.28 468.75 137.49 137.49

9 1232.97 1233.19 UP 8333 60 60 60 10 258.50 42.33 32.33 750.00 231.97 231.97

10 1233.22 1233.44 UP 10000 60 60 60 8 280.59 35.28 27.28 937.50 274.97 274.97

11 1240.77 1240.97 UP 6917 30 30 30 10 235.52 51.00 41.00 375.00 91.47 91.47

12 1240.97 1241.15 UP 7143 30 30 30 10 239.33 49.38 39.38 375.00 95.21 95.21

13 1241.2 1241.49 UP 6917 50 50 50 10 235.52 51.00 41.00 625.00 152.44 152.44

14 1241.54 1241.74 UP 6917 50 50 50 10 235.52 51.00 41.00 625.00 152.44 152.44


Details of Curves in the Section SSE/PW/SKB under ADEN/FZD
Rate of change of Cannt =
35mm/sec

Transition Length Speed on TL Speed on TL


Location Vm (Based on
TL (Based on Ca) Remark Remark from SSE Section
Actual Equilibrium Actual Cd Cd) Permitted
Curve No. UP/DN Radius Min TL Cannt Cannt Speed on
utilised Min TL HWH End
HWH Ca 0.27(((Ca+C Ce Curve
From Km. To Km. End DLI End d)*R)^0.5) (125*TL)/Ca (125*TL)/Cd

17 1170.077 1170.357 DN 9722 60 60 60 8 276.66 36.28 28.28 937.50 265.16 265.16


This curve added
18 1173.45 1173.93 DN 7000 50 60 50 15 242.25 50.39 35.39 416.67 176.59 176.59 At site 9mm

19 1179.49 1180.08 DN 8750 60 60 60 9 263.68 40.31 31.31 833.33 239.50 239.50 Okay

BBL Yd. 1181.26 1181.63 DN 8750 60 60 60 9 263.68 40.31 31.31 833.33 239.50 239.50 There is no curve

BBL Yd. 1181.84 1182.18 DN 8750 60 60 60 9 263.68 40.31 31.31 833.33 239.50 239.50 There is no curve

22 1191.42 1191.83 DN 6850 60 60 60 9 233.30 51.50 42.50 833.33 176.48 176.48 Okay

23 1192.7 1193.13 DN 6850 60 50 50 15 239.64 51.50 36.50 416.67 171.25 171.25 At site 9mm

Compound Curve At site


24 1210.4 1211.67 DN 3500 100 120 100 33 184.21 100.79 67.79 378.79 184.40 184.21
21mm and 33 mm

25 1211.67 1211.97 DN 2350 100 120 100 65 168.13 150.11 85.11 192.31 146.87 146.87 PSR 120kmph At site 50mm

26 1212.6 1213.02 DN 6850 60 60 60 15 239.64 51.50 36.50 500.00 205.50 205.50 PSR 110kmph At site 9mm
Details of Curves in the Section SSE/PW/FZD under ADEN/FZD
Rate of change of Cannt =
35mm/sec
Transition Length Speed on TL Speed on TL
Location TL Vm (Based on Ca) (Based on
Cd) Remark Remark from SSE Section
Actual Equilibrium Permitted
Actual Cd
Curve No. UP/DN Radius Min TL Cannt Cannt utilised Min TL HWH End Speed on
HWH Ca 0.27(((Ca+C Ce Curve
From Km. To Km. DLI End
End d)*R)^0.5)
(125*TL)/Ca (125*TL)/Cd

1 1220.98 1221.24 DN 6250 60 60 60 10 223.87 56.44 46.44 750.00 161.50 161.50

2 1221.24 1221.56 DN 7145 60 60 60 10 239.37 49.37 39.37 750.00 190.50 190.50

3 1222.25 1222.46 DN 6250 50 50 50 12 225.90 56.44 44.44 520.83 140.64 140.64

4 1222.46 1222.67 DN 5000 60 60 60 12 202.05 70.55 58.55 625.00 128.09 128.09

5 1228.62 1229.36 DN 6250 80 80 80 12 225.90 56.44 44.44 833.33 225.02 225.02

6 1229.82 1230.06 DN 10000 50 50 50 8 280.59 35.28 27.28 781.25 229.14 229.14

7 1230.11 1230.33 DN 10000 50 50 50 8 280.59 35.28 27.28 781.25 229.14 229.14

9 1232.86 1233.08 DN 8383 60 60 60 10 259.27 42.08 32.08 750.00 233.79 233.79

10 1233.13 1233.36 DN 8383 60 60 60 10 259.27 42.08 32.08 750.00 233.79 233.79

11 1240.31 1240.64 DN 2273 120 120 120 60 162.83 155.19 95.19 250.00 157.57 157.57

12 1240.72 1241.03 DN 2273 120 120 120 60 162.83 155.19 95.19 250.00 157.57 157.57

13 1241.11 1241.38 DN 2273 120 120 120 60 162.83 155.19 95.19 250.00 157.57 157.57

14 1241.44 1241.75 DN 2273 120 120 120 60 162.83 155.19 95.19 250.00 157.57 157.57

You might also like