TOP OF RIDGE TOP OF RIDGE

8 @ 200 c/c
8 @ 200 c/c

F F

B(O.Ln.ite)l
EL(+)8.650 EL(+)8.65 B(O.Ln.ite)l
T(O.C). T(O.C).

HEIGHT OF

HEIGHT OF
WINDOW
DOOR
EL(+)7.40 EL(+)7.40
LNITELLEVEL LNITELLEVEL
B(O.C). B(O.C).

FOR DOOR FOR WINDOW


EL(+)5.185
EL(+)4.750 EL(+)4.80 T(O.S.).
T(O.C). F(L.).
SECTIONAL DETAILS OF SLOPE CHAJJA
EL(+)3.990
B(O.S.).
EL(+)3.350
LNITELLEVEL
B(O.C).

EL+(.7)50
FF.L.
E EL(+)0.750 EL(+)0.750 E
F(L.). F(L.).
EL(±)0.00 EL(±)0.00
F(G.L.) F(G.L). EL.(+)150
±(0)0.0
FG.L.

m
6 5 4 3 2 1

()n.i
D C B A A' PN
LITH
SECTION E-E SECTION F-F BEAM

TOP OF RIDGE TOP OF RIDGE

TYP. DET. OF FLOORING, PLINTH PROTECTION & SURFACE DRAIN

D D

EL(+)8.650 EL(+)8.65 EL+(.7)50


T(O.C). T(O.C). FF.L.

EL(+)7.40
LNITELLEVEL
B(O.C). FF.L.

±(0)0.0
FG.L.
EL(+)5.185
EL(+)4.80 EL(+)4.80
PE SLO
P
EL(+)4.750 T(O.S.).
DET. OF PUFF PANEL
F(L.). SLO 2 1: E T(O.C). F(L.).
1: M.S
2
EL(+)3.990 PN
LITH
ET BEAM
S HE SH
EE B(O.S.).
M. S T EL(+)3.350
LNITELLEVEL
B(O.C).
DET. OF STEPS FOR DOORS

EL(+)0.750 EL(+)0.750 EL+(.7)50


C F(L.). F(L.). C
FF.L.
EL(±)0.00 EL(±)0.00
X
F(G.L.) F(G.L).
RAMP S
LOPE (
1:5)

±(0)0.0
FG.L.
6 5 4 3 2 1 D C B A A'
ELEVATION 'A' ELEVATION 'D' PN
LITH
BEAM NG
.L.
TOP OF RIDGE TOP OF RIDGE
BW
k.lal

X
TYP. DET. OF RAMP

B B

EL(+)8.650 EL(+)8.65
T(O.C). T(O.C).
NOTES:-
EL(+)7.40
LNITELLEVEL FOR GENERAL NOTES REFER Sh 1 of 2
B(O.C).

EL(+)5.185 02 03.12.2021 FIRST ISSUE


BW
k.lal
EL(+)4.80 EL(+)4.750 T(O.S.). EL(+)4.80
01 26.10.2021 SECOND ISSUE
F(L.). T(O.C). F(L.).
EL(+)3.990 00 19.10.2021 FIRST ISSUE
B(O.S.). REV DATE DESCRIPTION
EL(+)3.350
LNITELLEVEL PIA REC POWER DEVELOPMENT & CONSULTANCY LIMITED
B(O.C). SECTION X - X OWNER LADAKH POWER DEVELOPMENT DEPARTMENT (LPDD)

LEAD JV TECHNO ELECTRIC & ENGG. CO. LTD.


PARTNER (LEAD PARTNER TECHNO ELECTRIC JV WITH HYOSUNG INDIA)

EL(+)0.750 EL(+)0.750 JV PARTNER HYOSUNG T&D INDIA Pvt. Ltd.


A F(L.). F(L.). A
NOA-I: SUPPLY RECPDCL/PIA/LPDD/GIS/SS-03: Pkg-02/2021-22/NOA I/521 Dated: 18-06-2021
EL(±)0.00 EL(±)0.00
F(G.L.) F(G.L). NOA-II: SERVICE RECPDCL/PIA/LPDD/GIS/SS-03: Pkg-02/2021-22/NOA II/522 Dated: 18-06-2021
Turnkey Contract Package of Design, Manufacturing, Supply, Erection, Testing &
Commissioning of 220/33 kV, 50MVA GIS Substation at Diskit (Nubra) including Staff
PROJECT Quarters & associated facilities along with 220kV Line Bay at PGCIL's existing GIS
Substation at Phyang; associated with Strengthening of Transmission System of
LPDD(erstwhile JKPDD) under PMDP Scheme-15
SUBSTATION 220/33 kV (GIS) DISKIT SUBSTATION
1 2 3 4 5 6 A' A B C D
DRG. TITLE ARCHITECTURE PLAN SECTION & ELEVATION OF CONTROL ROOM BUILDING
DRG. NO. : 0770DI_DSKT_SUBS_SWYD_C_DRG_CRB_06_001
ELEVATION 'C' ELEVATION 'B'
SCALE : NTS JOB NO: 0770DI SHEET 2 OF 2