Perhitungan Penggunaan Material BCC 240 & BCC 120 YELLOW Green

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

PT.

ENERGI DIAN RAYA


Ruko Derwati mas No 9
JL. Derwati Ciwastra Bandung 40292
Tel : ( 022) 87304502 email : marketing@endira.web.co.id

LIST MATERIAL BCC 240mm2


Date : 27 Mei 2021
Cost Code : -EDR-
Material Type : BCC 240 mm2,
Project : Palu ,Sulsel

TOTAL
NO DESCRIPTION UNIT SPARE
ACTUAL
1 Grid Vertical Meter 970
2 Grid Horizontal Meter 1,034
3 Grid TFT Meter 29
4 Grid GT 2 Meter 203
5 Grid GT 1 Meter 128
6 Grid GT to Rood Meter 40
7 Total Conductor 2,404

LIST MATERIAL BCC 120 mm2 Green Yellow mm2


Date : 27 Mei 2021
Cost Code : -EDR-
Material Type : 120 mm2, Green Yellow
Project : Palu ,Sulsel

TOTAL
NO DESCRIPTION UNIT SPARE
ACTUAL
1 From Grid To Foundation Meter 1,100
2 From Base To Eequipment Meter 482
3 From Grid To Mk Meter 24
4 Fro Grid to All Controll Panel Meter 60
7 Total Conductor 1,666

Note Belum dihitung Spare

Bandung 27 Mei 2021

Requet by
Fanly Kapiso