Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 5

FACULTY OF ENGINEERING

Test 1
First Semester of 2021/2022

COURSE NAME : POWER GENERATION AND UTILISATION

CODE : EEE 3327

PROGRAMME : BACHELOR OF ELECTRICAL AND ELECTRONIC ENGINEERING


WITH HONOURS

LECTURER : ASSOCIATE PROFESSOR IR DR NORHAFIZ BIN AZIS

DATE : 23 NOVEMBER 2021 VENUE : ONLINE

TIME : 9:00 AM – 10:30 AM DURATION : 2 HOURS

INSTRUCTIONS :

1. Answer ALL questions

Name :

Matric no : Programme :

Seat No : Signature :

This paper consists of _5_ pages including the cover page.

UPM All rights reserved


AKU JANJI PELAJAR
PEPERIKSAAN AKHIR DALAM TALIAN

HONOR PLEDGE
ONLINE TEST

Saya mengaku bahawa saya tidak memberi atau menerima apa-apa pertolongan yang tidak
dibenarkan dalam peperiksaan ini, dan semua kerja yang diserahkan adalah daripada saya
sendiri.

Saya faham bahawa jika saya didapati melanggar etika, saya boleh dikenakan tindakan
tatatertib di bawah Kaedah-Kaedah Universiti Putra Malaysia (Tatatertib Pelajar- Pelajar) 2005
dan mengikut Perkara Akademik Prasiswazah 2014.

I affirm that I have not given or received any unauthorized help on this examination, and that
all work is my own.

I understand that if I am found to be in violation of ethics, I will be subjected to appropriate


disciplinary action under the Universiti Putra Malaysia (Discipline of Students) Rules 2005 and
in accordance with the Undergraduates Academic Matter 2014.

Nama :

Tandatangan : (secara digital)

No. Matrik :

Kursus :

Tarikh :
ANSWER ALL QUESTIONS
Question 1
a. Based on initial assessment, there are 3 possible river locations that have
been listed as suitable for development of the dam and hydroelectric water
plant as shown in Table 1. Based on the information below, design and
identify the best location for placement of hydroelectric power plant based
on the generated power.
Table 1: Information on the river location

Location Water head Average Cross- Cost of


possible after Velocity of sectional building dam
dam placed flowing water area of water (RM)
(m) (m/s) flow (m2)
Location 1 1.8 2.3 8.8 2 million

Location 2 1.7 1.9 8.5 1.7 million

Location 3 2.2 2.1 9.1 2.1 million

Location 4 1.6 2.2 8.9 1.8 million

(3 marks)

Answer:

b. Using similar information from Table 1, compose the energy the


hydroelectric plant would produce in one year at each location if the
efficiency of the turbine is 92.3%. Given the plant need to produce 6500
kWh of energy for 350 end users. Which location should be recommended
based on cost and compliance with minimum energy requirement?
(4 marks)

Answer:
Question 2
a. Coal power generation could produce different types of by-products, which
can be harmful to human and environment. Identify the technology that can
be used to remove fine particles. With the aid of diagrams, compile the
details each of the components involved. (3 marks)

Answer:

b. Nuclear power generation can be obtained through fission process of


uranium. Compose the approach that can be carried out to obtained steady
operation of the fission process. (3 marks)

Answer:

Question 3
a. Solar power generation is currently gaining attention due to its advantage as
renewable source. Devise the solar power generation that is based on the
storage concept. (3 marks)

Answer:

b. Boiler is the key aspect in the power generation. Devise the type of boiler that
is vulnerable to the operation. Propose the mitigation actions with valid
justification to minimize the issue. (4 marks)

Answer:

(Total Marks: 20)

You might also like