Professional Documents
Culture Documents
Career Objectives: 6-Apr-20 4 November2019-To
Career Objectives: 6-Apr-20 4 November2019-To
CAREER OBJECTIVES To make a sound position in corporate world and work enthusiastically
in team to achieve goal of the organization with devotion and hard work
WORK EXPERIENCE
6 April2020 to 15 February Working as Project Manager at Telcon Engineers Pvt Ltd. On ±660 KV HVDV line from
2021 Matiari to Lahore (LOT4)
4 November2019-to Working as junior engineer in TURKPAK International (Private) Limited
6-Apr-20 Engineering and Consultancy services on ±660 KV HVDV line from Matiari to
Lahore through NESPAK.
November 2018- upto Position: Project Engineer at Potential Engineers Pvt Ltd.
May 2019. 500 KV Single Circuit Guddu-Muazaffargarh Transmission line .
November 2018- upto Position: Project Engineer at Potential Engineers Pvt Ltd.
May 2019. 220 KV Double Circuit Twin Bundle Transmission Line Havali Bhadar Shah
to Gojra Grid.
May 2014– up to Position: Project Engineer at Potential Engineers Pvt Ltd.Neelum Jhelum
26 August 2017. 500 KV Double Circuit Quad Bundle Transmission Line
Responsibilities at Stringing:
· Make the plans of pulling according to requirements.
· Inspection of Mid Span joints and Dead End joints of Conductor.
· Managing the Sag Calculations and inspections.
· Checking of Spacers, Dampers and Insulators.
· Controlling the site expenses and managing the team of Foreman.
Feb2014- May 2014 Position: RF Engineer at Ericsson ( Mobilink swap project )
Responsibilities on Job:
· 2G/3G cluster drive test
· Reporting sector swaps found during drive test
· Drive test (analyse speech quality, Rx level, Rx Quality etc.)
· Static testing
Jan 2010- Dec 2012 Position: Electrical Engineer at WATT Engineering Services
Responsibilities on Job:
· Electrification of multi-story buildings.
· Designing of Single line diagram (including breaker selection, wire
gauge,depending upon load)
· Best and cost effective design.
· Normal and Emergency wiring as per client requirement.
· Client communication and correspondence.
· Quality assurance.
· Manpower Controlling and solve the problems.
· Final Documentation & Billing Works.