Terminal 2: E48 E50 E53 E55 E49 E52 E51 E54
Terminal 2: E48 E50 E53 E55 E49 E52 E51 E54
N GENERAL NOTES
E48 E49 E50 E51 E52 E53 E54 E55 7. SPEAKER CABLE SHALL BE 2C x 1.5 Sqmm, FIRE RESISTANCE
ARMOURED CABLE.
MATCHLINE
KIA-B03-L&T-R_
FA-L1-SPD-1184
SEE: 1 /
MATCHLINE
KIA-B03-L&T-R_
FA-L1-SPD-1164
SEE: 1 /
5x2C 1.5 SQ.MM FIRE RESISTANCE ARMOURED CABLE FROM ADDRESSABLE DEVICE LOOP.
FACP_06 MACHINE ROOM 0T75-16
L1-FACP_07-AMP-2-Z175-SPEAKER CIRCUIT SOM India LLC
15. HCP FOR FIRE TELEPHONE CIRCUIT SHALL BE CONNECTED WITH 14 Wall Street, New York, NY 10005
L1-PSU-93-TELEPHONE POWER CIRCUIT SEPARATE DEVICE LOOP FROM FACP.
L1-PSU-48-ZONE AREA-12-STROBE CIRCUIT
MEPF ENGINEER BAGGAGE CONSULTANT
DEVICE LOOP CABLE FROM FACP_03 L1-TELECOM ROOM 1T54-09 16. THE LOCATION OF PROPOSED FIRE ALARM
5x2C 1.5 SQ.MM FIRE RESISTANCE ARMOURED CABLE TO 1TPA-02 3455 m² CONTROL PANEL IS FROM LEVEL - 1 ELECTRICAL CLOSET (1T73-11) ARUP LTD. BNP Associates
FACP_03 L3-MECHANICAL EQUIPMENT CLOSET 3T64-36 EAST PIER DOM AND MECHANICAL EQUIPMENT CLOSET (1T76-12). 77 Water Street P.O. Box 32746
L1-FACP_05-Z183-SPEAKER CIRCUIT ARRIVAL CIRC
J New York, NY 10005 Abu Dhabi, UAE
17. TOTAL 03 SPEAKERS/STROBES FOR FACP - 07 (AMP-2), ZONE - 175
TOTAL 04 SPEAKERS/STROBES FOR FACP - 09 (AMP-3), ZONE - 172 LIGHTING CONSULTANT LANDSCAPE
5x2C 1.5 SQ.MM FIRE RESISTANCE ARMOURED CABLE TO
TOTAL 02 SPEAKERS/STROBES FOR FACP - 09 (AMP-3), ZONE - 174
FACP_06 L0-MACHINE ROOM 0T75-16
TOTAL 02 STROBES CONNECTED IN PSU - 43
BPI Grant Associates
TOTAL 04 STROBES CONNECTED IN PSU - 44 302 5th Ave, 12th FL 22 Milk Street
F
PSU-48-ST_C-05
F
PSU-47-ST_C-05 TOTAL 04 STROBES CONNECTED IN PSU - 45 New York, NY 10001 Bath, UK BA1 1UT
TOTAL 02 STROBES CONNECTED IN PSU - 47 IT / SECURITY / PA / FAS SIGNAGE / WAYFINDING
11000 6300 TOTAL 03 STROBES CONNECTED IN PSU - 48
N19 AS PER DRAWING MBII MSD
S
B
S
B
S
B 18. AS PER THE FINAL APPROVED RCP LAYOUT THE BELOW FALSE
44 Mobile Drive 2 Young Place
CORECUT CEILING SERVICES SHOULD BE CO-ORDINATED. Toronto, ON M4A 2P2 East Kilbride, GLA G75 0TD
100mm x 400mm
150MM X 400MM
REFERENCE DRAWING: BIAL DESIGN
CHECKED BY APPROVED BY
1TPA-02 3455 m²
1. FOR TYPICAL INSTALLATION DETAILS REFER DWG: NO:
KIA-B03-L&T-R_GD-XX-SPD-0002.
I EAST PIER DOM
9000
ARRIVAL CIRC
2. FOR TYPICAL INTERFACING DETAILS REFER DWG: NO:
11800
11700
KIA-B03-L&T-R_GD-XX-SPD-0003.
ARCHITECTS & ENGINEERS:
Nos. 01
False ceiling mounted.
B
EOL S
Evacuation Speaker cum Strobe (2 watt ) - 00
Nos.
H F
PSU-48-ST_C-06 PSU-47-ST_C-06
F
True ceiling mounted.
B
S FIRE CONTRACTOR:
Evacuation Speaker (4 watt ) - True ceiling 00
11000 6400 Nos.
mounted.
Siemens Ltd.,
1TPA-02 3455 m²
#49,Ground Floor, Jyothi Mahal,
EAST PIER DOM Evacuation Speaker cum Strobe (2 watt ) - ST.Marks Road, Bangalore -560001,
ARRIVAL CIRC S Nos. 08
Wall Mounted. P:+91(080) 33299154
B
9000
B
00
S
CIRCULATION Evacuation Strobe - Wall Mounted. Nos.
1000
B
S
1100
1100
F KEYPLAN
13000
S FACP_07-AMP-2-Z175-ESSW-04 Evacuation Strobe - Ceiling Mounted. Nos. 15
G B
1300
N21 1T74-08 9 m² T00 T10 T20 T30 T40 T50 T60 T70 T80
6300
FACP_07-AMP-2-Z175-ESSW-06 01
6500
FAMILY TOILET
Phone Jack - Wall Mounted. Nos.
1T74-11 13 m² T01 T11 T21 T31 T41 T51 T61 T71 T81
1T74-15 12 m²
CHASE FACP_07-AMP-2-Z175-ESSC-05 PSU
CHASE Power Supply Unit. Nos. 00 T02 T12 T22 T32 T42 T52 T62 T72 T82
F
1T74-13 7 m²
1T74-09 26 m² CHASE 1T74-14 27 m² MM T03 T13 T23 T33 T43 T53 T63
T73
T83
Analogue Addressable Monitor Module. Nos. 00
WOMEN'S
MEN'S TOILETS
TOILETS T04 T14 T24 T34 T44 T54 T64 T74 T84
EOL F HCP
F PSU-44-ST_C-01 Intelligent Control Point Device Nos. 01
T05 T15 T25 T35 T45 T55 T65 T75 T85
2600 1800
9000
2200
2000
T06 T16 T26 T36 T46 T56 T66 T76 T86
230VAC UPS Power Outlet (Spur Outlet) Nos. 00
PSU-44-ST_C-04 FACP_03-TPS-03-TJ-06
2C x 1.5 Sqmm Fire T07 T17 T27 T37 T47 T57 T67 T77 T87
resistance Armoured cable APPROX
PSU-48-ST_C-07
F
Mtrs.
FACP_03-TPS-03-HCP-06 (Speaker) Zone cable 200
T08 T18 T28 T38 T48 T58 T68 T78 T88
F
2C x 1.5 Sqmm Fire
APPROX
resistance Armoured cable Mtrs.
400
(Strobe) Power cable
2C x 1.5 Sqmm Fire
resistance Armoured cable APPROX
FACP_09-AMP-3-Z174-ESSW-06 Mtrs.
(Telephone) Loop cable 300
PSU-45-ST_C-07
F
1T74-07 27 m²
(Telephone) Communication cable
SUBMISSION
MAITENANCE/ 2C x 1.5 Sqmm Fire
STORAGE
resistance Armoured cable APPROX
1T74-05 178 m² Mtrs. CHECKED BY SIGN DATE CHECKED BY SIGN DATE
350
12100
NON PUBLIC
(FACP to FACP) Loop cable
ARCHITECTURE FPS
CIRCULATION
EOL CIVIL & STRUCTURAL PIPING
APPROX ELECTRICAL
Total PHE
E FACP_09-AMP-3-Z174-ESSW-07 1600
S
B
ELV SYSTEM AIRPORT SYSTEM
9000
1TPA-02 3455 m²
HVAC VHT
EAST PIER DOM
ARRIVAL CIRC
Revision Schedule
L1-PSU-43-ZONE AREA-11-STROBE CIRCUIT
4500
Revision
9000
L1-FACP_09-AMP-3-Z172-SPEAKER CIRCUIT Revision Date Issued by Issued to
Number Revision Description
0 FOR REVIEW 17 OCT SIEMENS L&T
2020
N23
F
PSU-45-ST_C-06
FACP DETAILS:
S S S
B B B
PSU-45-ST_C-05
EOL PANEL NO. PANEL LOCATION ZONES PART PLANS
15600 18000
D F
12200
L1-FACP_09-AMP-3-Z174-SPEAKER CIRCUIT FACP - 3 L1 - TELECOM ROOM 54, 64, 71, 72, 73, 74,
ZONE 3 75, 76, 77, 78, 80, 81,
(TPS) (1T54-09)
83, 84, 85, 86, 87
1TPA-02 3455 m²
TELEPHONE COMMUNICATION CABLE L1-SLC-FACP_03-TPS-ZONE-8
EAST PIER DOM TELEPHONE COMMUNICATION CABLE L1-SLC-FACP_03-TPS-ZONE-8
L1-PSU-43-ZONE AREA-11-STROBE CIRCUIT
FA-L1-SPD-1184
FA-L1-SPD-1164
ARRIVAL CIRC
KIA-B03-L&T-R_
KIA-B03-L&T-R_
DEVICE LOOP CABLE TO FACP_03 L1-TELECOM ROOM 1T54-09 L1 - TELECOM ROOM 64, 65, 74, 75
DEVICE LOOP CABLE TO FACP_03-TPS-03-HCP-07 PSU - 43 (1T75-10)
MATCHLINE
MATCHLINE
C PSU-43-ST_C-02 PSU-43-ST_C-01
7800 7800 1900
DEVICE LOOP CABLE FROM FACP_03-TPS-03-HCP-10
N24
1300
L1 - TELECOM ROOM
74, 75
SEE: 1 /
SEE: 1 /
PSU - 44 (1T75-10)
5x2C 1.5 SQ.MM FIRE RESISTANCE ARMOURED CABLE TO
2900
F F
PSU-45-ST_C-04
F
FACP_09A L1-MECHANICAL EQUIPMENT CLOSET 1T76-12
1300
1T74-05 178 m²
L1-FACP_09-AMP-3-Z172-SPEAKER CIRCUIT
L1 - TELECOM ROOM
1900
F
1T75-03
BAGGAGE
16 m²
SEE: 1 / CLOSET (1T73-11)
KIA-B03-L&T-R_
F
RECONCIL.
F
KIA-B03-L&T-R_
FA-L1-SPD-1175 FA-L1-SPD-1175 L1 - TELECOM ROOM
PSU - 48 73, 74
(1T73-10)
DRAWING TITLE
EVACUATION SYSTEM - T2 -
LEVEL 1 -ARRIVAL
MEZZANINE - PART PLAN
LEVEL 1 - ARRIVALS MEZZANINE - T2 PART PLAN - 74
A 1 SCALE 1 : 100
74_SHEET -2 OF 2
DRAWING NUMBER
KIA-B03-L&T-R_FA-L1-SPD-1174
SCALE: 1:100 SHEET SIZE - A0