Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Reserving 2 2.

03
Open Cut Coal
days

PROGRAM DURATION DELIVERY MODULE ID


TRAINING MODULE PROFILE

The Reserving for Open Cut Coal module focuses on the processes and tools required
to design a five strip model for a typical Open Cut Coal mine. The training includes the
initial auditing and modification of Vulcan-formatted structural grids and using those
grids to project a five strip design into an existing pit.
The training covers three different reserving methods:
• Reserving using the surface stacking method
• Boolean reserving method
• Strip line (walls) method.
The second day focuses on the processes and tools required to generate the dump
reserves aligned to the mined reserves created on the first day.

Getting Started Attributes


• Configuring the Layer Control window • Assigning strip line attribute values
• Importing topography and pit extent data • Assigning default attribute values

Design Data Projection Processing


• Designing endwall, block, and strip line projection data • Setting up multiple projection rules
• Generating and modifying face markers • Processing projection rules

Grids Solids
• Importing structural grids • Creating solids and checking results
• Examining grids and creating section slices • Assigning strip attributes and values
• Creating seam solids between surfaces • Interrogating solids
• Grid surface stacking
Plots
• Modifying grids
• Generating layouts (plots) with detailed projection
images

Reserving for Open Cut Coal


Training Pathway

1.01 Deswik.Getting 1.02 Deswik.CAD 2.03 Reserving for


Started Essentials Open Cut Coal

ONLINE 30
minutes
ONLINE 1
day
CLASSROOM 2
days

Prerequisites Recommended
To be done immediately following the
prerequisite modules.

TRAINING
MODULE www.deswik.com
PROFILE training@deswik.com

You might also like