Genta GRASINDO Sarana

BILL OF QUOTATION

CCTV & ACCES POINT CABLING INSTALLATION

PROJECT : KAMAJAYA DAAN MOGOT TANGERANG

Company : PT. DYNAMIX CIPTA SOLUSI Date : 15 Desember 2021


Grand Slipi Tower Lt.9 Unit 0 CHR Office No Ref : 50/pnw-GGS/XII/2021
Jl. S.Parman Kav.22-24 - Jakarta Barat Project Name : Kamajaya Daan Mogot TNG
Attn : Bp. Dian
Product Description Unit Qty Unit Price Amount
Mfg. IDR IDR
A. DATA CABLING MATERIAL
1 Belden UTP Cable Cat.6 Rool 3 2,150,000 6,450,000
2 Belden RJ45 Connector Ea 30 17,500 525,000
B. MATERIAL SUPPORT
1. Boss Hight Impact Conduit 20mm + Socket Ea 250 23,500 5,875,000
2. Boss Flexible Conduit 20mm Ea 1 465,000 465,000
3. n/a Small Material ( Cable Ties & Etc ) Lot 1 650,000 650,000
4. n/a Breket Gantungan Ea 8 375,000 3,000,000
5. n/a Rental Scaffolding Lot 1 1,950,000 1,950,000
6. Supreme NYM 3 x 2,5mm Electrical Cable Roll 1 1,450,000 1,450,000
7. Boss Stop Contack + Outbow Ea 1 75,000 75,000
C. PULLING CABLE & TERMINATION -
1. CCTV Pulling Cable & Termination Node 7 375,000 2,625,000
2. Acces Point Pulling Cable & Termination Node 7 375,000 2,625,000
3. Acces Point Point to Point Node 2 375,000 750,000
4. Stop Contack Pulling Cable & Termination Node 1 450,000 450,000
D, SETTING & INSTALL CCTV & ACCES POINT -
1. CCTV Setting & Installation Node 7 125,000 875,000
2. Acces Point Setting & Installation Node 7 125,000 875,000
3. Acces Point Setting & Installation Node 2 125,000 250,000
Total 28,890,000

Discount 0% -

Total 28,890,000

PPN 10% 2,889,000

GRAND TOTAL 31,779,000

Hormat kami,