QUERY FORM

Date: As of January 31, 2022


CIV 0413.1 - Quantity Surveying Laboratory Project
General and Technical Queries
ITEM REFERENCE DESCRIPTION RESPONSE
Doors in the area/s below doesn't have label Measure the door/s in the
or not in the schedule. plans and countercheck from
the door schedule on which
door label/name should be
used.
GROUND & 2ND FLOOR
1
PLAN

A callout in the plans for CB-2 but not No given details for CB-2 in the
included in the given beam details/schedule. plans. Consider CB-1 and CB-2
the same in details and
schedule.

2 STAIRS/STAIR DETAILS
Take-off for items that have
lump sum as corresponding
unit, always use 1.00 as
3 UNITS For LUMP SUM unit/s of an item
quantity. Serves as bonus take-
off for the project.

Mark-up drawings should be


submitted per plans/page of
4 MARK-UP DRAWINGS Inclusion/s and submission of mark-up
take-off.

Project proposal doesn't have


any format. It should have a
heading of your
group/contractor name.
Content should include on why
5 PROJECT PROPOSAL Inclusions of a project proposal your group/contractor should
be awarded of the said project
base on your take-off,
quantities, mark-up drawings
and BOQ.

On or before last day of Final


6 PROJECT SUBMISSION Deadline Exam week, February 7, 2022