Installation Testing Commisiioning of LPG SYSTEM
Installation Testing Commisiioning of LPG SYSTEM
Risk Rating
Risk Rating
Probability
Probability
QD,QC,E,S
Severity
Severity
L/M/H
L/M/H
NON-C0NFORMANCE / IMPACT/
WHO/WHAT MAY BE EXPOSED CONTROLS
HAZARD
1.LPG Tank handling with crane Injury to personnel s 3 3 9 H Activity must be carried out with 3 1 3 L
Crane/Lifting gears/LPG Tank etc relevant lifting plan
Damage to property Ensure competent/trained/ licensed
operators.
Falling object. Crane failure/
Crane and all lifting gears shall have
Defective lifting gears ,Improper valid 3rd party inspection certificate.
handling, Over loading Lifting gears shall be inspected
before use.
Check the lifting gears for its SWL
Crane outriggers must be fully
extended and to be on firm footing,
using plates.
Assign trained Banks man to control
Vehicle movement.
Ensure pre-use inspection is done
with check list.
Cordon off the area and post
adequate signage for crane lifting.
No personnel shall work or stand
under suspended load
Assign certified riggers for rigging.
Crane operations must be stopped if
wind speed exceeds 20 knots.
Crane should not be left unattended
while in operation.
Tag line shall be attached for longer
loads and guided by the crew to
HDEC-HSE-F004.Risk Assessment Form 1|Page12
HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD.
HAMAD MEDICAL CITY Construction Package CP-300B
Hospital Fit Out Project