ABENGOA

INABENSA
DAILY REPORT

Inabensa Abu Dhabi


Office 904, 9th Floor, Silver Wave Tower
Al Mina Street, P.O. Box 106151
Abu Dhabi, United Arab Emirates
Tel: 02 5550801
Fax: 02 5550816

SITE: 400 kV OHL SASN -MOSG (work location T40 - Ckt SASN -MOSG)
DAILY REPORT
REPORT No: DR13 DATE: 12.10.2021
PROJECT: N-18138/B Temperature °C : 39
35 38

LOT.2, LOT.3 AND LOT.4: OHL MODIFICATION AND REMOTE Time: 14:00 h
11:00 h 15:30
END WORKS FOR ESTABLISHING MAHAWE – WATHBA 220KV
OHL CIRCUIT 2 & DISMANTLING OF 220KV OHLS UNPS-MHWG- Humidity (%) : 19%
27% 26%
WATH-RMAG/KHZG/SHME AND 400KV OHL SASN-MOSG
Time: 11:00 h 14:00 h 15:30

Weather conditions:
Sunny

RESOURCES EMPLOYED:

A. MANPOWER B. CONSTRUCTION MACHINERY & C. PLANT & TOOLS


EQUIPMENTS

1. Supervisory: 3. Electrical Labour 1. 3 T winch machine 1 1. Spacer Trolley 2


1.1 Engineers 4 3.1 Linesmen 6 2. Shawal 1 2. Tool box (sets) 2
1.2 Foreman 2 3.2 Workers 6 3. Crane,100T 1 3. PP Ropes 4
1.3 Supervisors 2 3.3 4. Crane,50T 1 4. Lifeline 2
5. 5. Rescue kit 1
2. Civil Labour 4. Mechanical Labour 6. 6. Roller 3
2.1 4.1 Fitter 13 7. 7.
2.2 4.2 Operator 2 8. 8.
2.3 4.3 9. 9.
10. 10.
11. 11.
Progress of Works:

Removal of spacers from T39-41 completed, Roller hoisting for T40 completed, Back stay for tower number: 30 completed and De-stringing of conductor from 30-33 is in
progress

Hold up if any :

Received By Engineer: Signed by Contractor:

Ref: Contract N-18138/B Section 9.doc


Contract Procedure Manual Page 6 of 36 Jun-21
N 18138/B
Lot.2, Lot.3, Lot.4: OHL modification and Remote End works for establishing Mahawe-Wathba 220 kV OHL circuit 2 & Dismantling of 220 kV OHLS UNPS-MHWG-WATH-RAMG/KHZG/SHME and 400 kV SASN-MOSG
Visual Chart

400 MOSG
Location MOSG 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Gantry 1 2
BAT90 BAT60+ BAT60
Tower Type Gantry BAT90-4 DE+6 S+6 AT+0 AT+0 S-4 S-4 S-4 S-4 S-4 S-4 S-4 S-4 BAT90+0 S-4 S+6 S+6 S+6 S+6 S+6 AT+2
/DE-4 6 +6
1 Scaffoldings & Net Installation TL TR
2 De-stringing of conductors
3 De-stringing of OPGW
4 Dismantling of towers & Gantry
BLO BLI BRI BRO
5 De-assembly of towers
1 2
6 Demolition of Foundation pile head
7 Clearing & Levelling of Location
Delivery
SASN of Towers & OHL materials to TRANSCO
8
store TL SASN
TR

Location 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52
BAT60+ BAT60 BAT60
Tower Type AT+2 S+6 S+6 S+6 AT+6 AT-6
2
S-6 S-6 S-6 S-6 S-6 S-6 S-6 S-6 S-6 S-6 S-5 AT+0 AT+2 S+6 S+6 S+6 S+6 S+6 BLO
AT+6 BLI +6 BRI +6 BRO AT+6

1 Scaffoldings & Net Installation


2 De-stringing of conductors
3 De-stringing of OPGW
4 Dismantling of towers & Gantry
5 De-assembly of towers
6 Demolition of Foundation pile head
7 Clearing & Levelling of Location
Delivery of Towers & OHL materials to TRANSCO
8
store

Location 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 G1 PROJECT SUMMARY


BAT60- BAT60- BAT6
Tower Type AT+6 AT+6 S-6 S-6 S-6 AT+0 S+2 AT+6 AT+6 AT-2 S-6 DE+0 GANTRY
6 6 0+3
1 Scaffoldings & Net Installation Activity Legend Total Qty Completed Qty Balance Qty Completion (%)
2 De-stringing of conductors De-stringing of conductors 25.6 km 0 km 25.6 km
3 De-stringing of OPGW
4 Dismantling of towers & Gantry De-stringing of OPGW 25.6 km 0 km 25.6 km
5 De-assembly of towers
6 Demolition of Foundation pile head Dismantling of towers & Gantry 67 Nos 0 Nos 67 Nos
7 Clearing & Levelling of Location
Delivery of Towers & OHL materials to TRANSCO 0 67
8 De-assembly of towers 67 Nos Nos Nos
store

Demolition of Foundation pile head 67 Nos 0 Nos 67 Nos