076551C 000D QCP 1500 001 0A 2/4
TECNICASREUNIDAS SAMSUNG ENGINEERING
APPLICABLE
CHECK AND QCF SITE INSPECTION EXTENT
Nr. SPEC. & NOTES
TEST DESCRIPTION CODE
CODES SUBCONTRACTOR CONTRACTOR OWNER
A FIELD INSTRUMENT
C LOOP CHECK
MISCELLANEOUS INSPECTION
D W12 (1)
FORM
(1): Split of site inspection responsibilities depends from the type of the inspection performed and the Contract
requirements
General note: Impulse line tightness test shall be performed and recorded during “System” tightness test
TTSJV W.L.L. – Riffa AlHajiyat – Blk. 939, Rd. 3901, Bldg 98, Flt. 33 – Kingdom of Bahrain
Project N° Unit Document Code Serial N° Rev. Page
076551C 000D QCP 1500 001 0A 3/4
TECNICASREUNIDAS SAMSUNG ENGINEERING
QC STEP:
in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use.
TTSJV W.L.L. – Riffa AlHajiyat – Blk. 939, Rd. 3901, Bldg 98, Flt. 33 – Kingdom of Bahrain
Project N° Unit Document Code Serial N° Rev. Page
076551C 000D QCP 1500 001 0A 4/4
TECNICASREUNIDAS SAMSUNG ENGINEERING
APPLICABLE
CHECK AND QCF SITE INSPECTION EXTENT
Nr. SPEC. & NOTES
TEST DESCRIPTION CODE
CODES SUBCONTRACTOR CONTRACTOR OWNER
A FUNCTIONAL TEST
MISCELLANEOUS INSPECTION
B W12 (1)
FORM
(1): Split of site inspection responsibilities depends from the type of the inspection performed and the Contract
requirements
R = REVIEW of QC FORMS
N.A. = NOT APPLICABLE
A = DOCUMENT APPROVAL
QC STEP:
Attachment:
- 000-J-PQP-50001-001 - Attachment 1 (set of Pre-Commissioning QCF as defined in the
above PRECOMMISSIONING QUALITY CONTROL FORMS List).
TTSJV W.L.L. – Riffa AlHajiyat – Blk. 939, Rd. 3901, Bldg 98, Flt. 33 – Kingdom of Bahrain
BAPCO MODERNIZATION PROGRAM
OWNER: BAPCO
CONNECTING
CONNECTION
LABELING &
DIRECTION
EARTHING
TAGGING
STAMP
SLOPE
DRAIN
WITNESSING
FLUID
LINE
THIRD
SUBCONTR. CONTRACTOR OWNER
PARTY
NOTE
QCF ACCEPTANCE
INSPECTORS SUBCONTRACTOR CONTRACTOR OWNER
NAME
SIGNATURE
DATE
BAPCO MODERNIZATION PROGRAM
OWNER: BAPCO
NOTE
(1) Verify as minimum:
a) Tag
b) Stamp for direction
c) Material
d) Internal diameter
e) Geometrical dimensions (Internal & external diameter; thickness)
QCF ACCEPTANCE
INSPECTORS SUBCONTRACTOR CONTRACTOR OWNER
NAME
SIGNATURE
DATE
BAPCO MODERNIZATION PROGRAM
TECNICASREUNIDAS SAMSUNG ENGINEERING
OWNER: BAPCO
ITEM:_________________ MR/PO:__________________________________________________
OPERATING CONDITION
WITNESSING
REQUIRED CHECKS REMARKS DATE
SUBCONTRACTOR CONTRACTOR OWNER THIRD PARTY
OPERATING PRESSURE
RESET PRESSURE
BUBBLE TEST
NOTE:
QCF ACCEPTANCE
INSPECTORS SUBCONTRACTOR CONTRACTOR OWNER
NAME
SIGNATURE
DATE
BAPCO MODERNIZATION PROGRAM
OWNER: BAPCO
QUALITY CONTROL FORM 1500.P55 PROJ. No.: 076551 REV. 0A SH. _1__ OF _1__
PRECOMMISSIONING ACTIVITIES: SUBCONTRACTOR: TTIP/SECL/TR 1500.P54 N° ______
FIELD INSTRUMENTS – LOOP CHECK FORM
GENERAL DATA
Unit: System: LOOP No:
N.A
N.A
N.A
N.A
N.A
Instrument Range /
N.A
Eng. Units Check
Hart Items Check N.A
Hart Tag N.A
CHECKS PERFORMED ON THE RELEVANT LOOP
A-Type of check Accepted
Confirm the Correct Reading/ Deviation or Action as Required
Step Activity YES NA
Input signal (AI-1)
0% 50% 100%
0- 50 -100%
Input signal (AI-2)
A1 0% 50% 100%
0- 50 -100%
Input signal (AI-3)
0% 50% 100%
0- 50 -100%
Output signal
Energise to Open Energise to Close
SOV (DO)
A2 Failure position Open Close Stay put
Valve (DI) Open in Close in
Open Close Sec: ………… Sec: ………..
limit switches
Valve position TX
0% 50% 100%
(AI)
Press, Flow, H:
HH: L: LL:
A3 Level, Temp NC :
NC : NO NC : NO NC : NO
Switch (DI) NO
A4. Aux (DO) ON OFF
A5 Aux (DI) NC NO
Notes:
REMARKS : CHECK THE TAG HART IN ACCORDANCE WITH THE PROJECT DOCUMENTS AND POSITION OF INSTRUMENT
NOTE
QCF ACCEPTANCE
INSPECTORS SUBCONTRACTOR CONTRACTOR OWNER
NAME
SIGNATURE
DATE
BAPCO MODERNIZATION PROGRAM
OWNER: BAPCO
INSPECTION FORM
TEST
3. TYPE OF INSPECTION ____________________________________ EXAMINATION
CHECK
NOT CONFORMING
WITH REMARKS
5. REMARKS
_______________________________________________________________________________
_______________________________________________________________________________
QCF ACCEPTANCE
INSPECTORS SUBCONTRACTOR CONTRACTOR OWNER
NAME
SIGNATURE
DATE
BAPCO MODERNIZATION PROGRAM
TECNICASREUNIDAS SAMSUNG ENGINEERING
OWNER: BAPCO
EFFECT IN
CAUSE & CAUSE EFFECT WITNESSING
ACCORDANCE
POS CAUSE & EFFECT (REAL OR (REAL OR NOTES
WITH C&E
EFFECT No. (SL N°) SIMULATED) SIMULATED)
(YES/NO)
NOTE
QCF ACCEPTANCE
INSPECTORS SUBCONTRACTOR CONTRACTOR OWNER
NAME
SIGNATURE
DATE
BAPCO MODERNIZATION PROGRAM
TECNICASREUNIDAS SAMSUNG ENGINEERING
OWNER: BAPCO
INSPECTION FORM
TEST
3. TYPE OF INSPECTION ____________________________________ EXAMINATION
CHECK
NOT CONFORMING
WITH REMARKS
5. REMARKS
_______________________________________________________________________________
_______________________________________________________________________________
QCF ACCEPTANCE
INSPECTORS SUBCONTRACTOR CONTRACTOR OWNER
NAME
SIGNATURE
DATE