RiskAssessment For Precast Foundation and Road Marking
RiskAssessment For Precast Foundation and Road Marking
RiskAssessment For Precast Foundation and Road Marking
Ref. No.
Title RISK ASSESSMENT FORP RECAST FOUDATION AND ROAD MARKING WORKS Rev. No. 0
Date: 1/28/2022
Non- routine
Severity Likelihoo Severity Likelihoo
Emergency
d d
Activity, Job Task, Sub Activity / Consequence / [Refer to [Refer to [Refer to [Refer to Residual Responsible
Routine
No. Hazard / Aspects Procedures Training Other Controls
Location Processes Impacts the the Risk Person
the the
RISK
Matrix] Matrix] Matrix]
Matrix]
1 Setting out the Survey as per As X personal injury 4 3 12 A breifing of site layout shall be communicated with Safe system of work 4 1 4
Provision of First Aid facility. Cool drinking water and Ensure the employees are drinking
adequate water and with adequate
Dehydration solution shall be made available at site.
Adverse weather Programs for heat stress prevention on site to be break or rest to reduce the heat
exposure time. Emergency stand by
communicated to all personnel. Wear appropriate vehicle and Provide Male Nurse
clothing loose fitting light weight and sun glasses.
service on site.
Uneven ground
and slippery provide proper barrication and sign board.
surfaces during the Housekeeping on daily basis.
walk
Title RISK ASSESSMENT FORP RECAST FOUDATION AND ROAD MARKING WORKS Rev. No. 0
Date: 1/28/2022
Non- routine
Severity Likelihoo Severity Likelihoo
Emergency
d d
Activity, Job Task, Sub Activity / Consequence / [Refer to [Refer to Excavation safety [Refer to [Refer to Residual Responsible
Routine
No. Hazard / Aspects Procedures Training Other Controls
Location Processes Impacts the the Risk Person
the the
RISK
Matrix] Matrix] Matrix]
Matrix]
Presence of
dust in the
worksite. Periodical water sprinkiling asDust suppression Periodical occupational health
Dust arrangements. Use of dust mask other PPE surveillance of personnel.
Inhalation
Falls into Trench – Mark and barricade the area around proposed
Public/ Personnel / Personal injury excavation and post adequate warning signs, and
Equipments warning lights for night traffic.
Soil Erosion / Cave-in Appropriate shoring / sloping methods shall be Use proper PPE's as required by the
Loose ground adopted, if required to avoid trench collapse. activity & identified Hazards.
Spray water to reduce dust generation due to vehicular Prevent vehicular movements in the
Dust Pollution Inhalation
movement & / or excavated soil handling (shifting). vicinity of excavations.
Equipments used shall be tested & certified by third Daily inspection of tools &
Personal injury party. equipments to ensure they are in
good working order.
Vibration
White finger Take regular breaks and job rotation. Site inspection
AL AFIAH ROADS CONTRACTING LLC
Ref. No.
Title RISK ASSESSMENT FORP RECAST FOUDATION AND ROAD MARKING WORKS Rev. No. 0
Date: 1/28/2022
Non- routine
Severity Likelihoo Severity Likelihoo
Emergency
d d
Activity, Job Task, Sub Activity / Consequence / [Refer to [Refer to [Refer to [Refer to Residual Responsible
Routine
No. Hazard / Aspects Procedures Training Other Controls
Location Processes Impacts the the Risk Person
the the
RISK
Matrix] Matrix] Matrix]
Matrix]
3 Back filling works Soil filling use of X 4 4 16 Site Traffic Rules & 4 1 4
Obtain permit to work prior to start any work at site. Site inspection. Periodical
Vehicle/equipment Follow site traffic rules. Reverse alarm shall be there in maintenance and inspection of heavy
gets struck in the Personal Injury 4
PM / CM, Engineer or
site the vehicle. Amber flashing beacons to be fitted and vehicles and tools to ensure good
working working condition.
Supervisor.
Respiratory
Ground Leveling X problems 3 12 Safe System of Work 3 1 3
Exposure to dust. water spraying on daily basis on site facilities area.
continuous monitoring by a
competent person
Overhead power Fire and Ensure safe clearance is maintained from all over head
lines. Explosion power lines.
Machinery
Chance of Injury to Comply with operating manual instruction. Only Toolbox talks to be conducted prior to
competent person to do the task. Inspect before use all Safe Handling start the work. Provide Third party
personnel due to Compactors
equipment equipment. Ensure the equipment sould be third party Certified Flag man for all construction
handling certified. moving equipment. Defects reporting
Use proper Personal Protective Equipment (Hand procedure
Proper maintenance of equipments
Noise and
Vibration gloves, ear muff and ear plug). Periodical maintenance and machineries. Use of adequate PPE
Use of plant and Personal Injury of equipments and machineries. when operating machinery
equipment Plate X Property
Engineer or Supervisor.
compactor Dust Pollution Damage Site inspection
Spraying water for daily basis. Use approprite
respiratory system.
3 3 9 3 1 3
AL AFIAH ROADS CONTRACTING LLC
Ref. No.
Title RISK ASSESSMENT FORP RECAST FOUDATION AND ROAD MARKING WORKS Rev. No. 0
Date: 1/28/2022
Use of plant and Personal Injury Risk Control Measures Residual Risk
Non- routine
equipment Plate X Property
Emergency
compactor Damage / [Refer to d d
Activity, Job Task, Sub Activity / Consequence [Refer to [Refer to Residual Responsible
Routine
No. Hazard / Aspects [Refer to Procedures Training Other Controls
Location Processes Impacts the the Risk Person
the the
RISK
Matrix] Matrix]
Matrix] Matrix]
Continuous Monitoring by a
Entanglement competent person.
3 3 9 Ensure all rotating parts are properly guarded. 3 1 3
PM / CM, Engineer or
concreting
Follow safe design of the shuttering works. Civil
engineers shall design and inspect the shuttering
Supervisor.
Unsecured system. Assessing the safe load capacity of the
structure. Number of workers on the shutter /form
shutters work / temperory structure shall be minimised to the
Physical injury possible level assessing the safe load capacity of the
(Major/ Minor) structure.
Physical injury
(Major / Minor)
Handling of Appropriate access/egress shall be constructed by site
concrete, cement team prior to start the work.
Dermatitis Maintain the access way free of obstruction Close monitoring monitoring by a
competent supervisor
Fresh concrete has Wear respirators or cover mouth and nose. Concrete
caustic effect due pump while pouring concrete will be kept lower to the
to its alkaline ground level and all the workers involved will be with
nature necessary PPE’s like Helmet, Gum boots, Hand gloves
and Goggles.
Physical injury
AL AFIAH ROADS CONTRACTING LLC
(Major / Minor)
Ref. No.
Title RISK ASSESSMENT FORP RECAST FOUDATION AND ROAD MARKING WORKS Rev. No. 0
Date: 1/28/2022
Fresh concrete has
caustic effect due Risk Control Measures Residual Risk
to its alkaline
Non- routine
Severity Likelihoo Severity Likelihoo
Emergency
Activity, Job Task, Sub Activity / nature Consequence /
d
[Refer to [Refer to
d
[Refer to [Refer to Residual Responsible
Routine
No. Hazard / Aspects Procedures Training Other Controls
Location Processes Impacts the the Risk Person
the the
RISK
Matrix] Matrix] Matrix]
Matrix]
Property
Damage Ensure Competent lifting supervision along the work. Brief the workforce on related
hazards and mitigationary measure
prior starting the activity.
Tool Box Talk / In
house training
AL AFIAH ROADS CONTRACTING LLC
3 5 15 Ref. No.
Title RISK ASSESSMENT FORP RECAST FOUDATION AND ROAD MARKING WORKS Rev. No. 0
Date: 1/28/2022
Non- routine
Severity Likelihoo Severity Likelihoo
Emergency
d d
Activity, Job Task, Sub Activity / Consequence / [Refer to [Refer to [Refer to [Refer to Residual Responsible
Routine
No. Hazard / Aspects Procedures Training Other Controls
Location Processes Impacts the the Risk Person
the the
RISK
Matrix] Matrix] Brief the workforce on related Matrix]
Matrix]
hazards and mitigationary measure
Personnel Fire Safety Plan to be prepared, promulgated and prior starting the activity.
Injury implemented. Tool Box Talk / In
house training
Highly flammable liquids and liquid petroleum gas will All vehicular plant will carry fire
be stored in a designated area and necessary signs extinguishers.
posted. Fire Watcher to be appointed.
6 Duct works Shuttering works X Fall of shuttering Slip, Trip, fall of 3 3 9 Proper access/egress shall be constructed by site team 3 1 3
Unsafe access/
Egress
Accidental 3 3 9 3 1 3
Title RISK ASSESSMENT FORP RECAST FOUDATION AND ROAD MARKING WORKS Rev. No. 0
Date: 1/28/2022
7 Bitumen Coating
Non- routine
foundation Severity Likelihoo Severity Likelihoo
Emergency
d Area to be isolate and provide d
Activity, Job Task, Sub Activity / Consequence / [Refer to [Refer to [Refer to [Refer to Residual Responsible
Routine
No. Application of Hazard / Aspects Procedures Training
MSDS chemical Other Controls
adequate signages. Provide
Location Processes Impacts the
3 the 1 Risk
3 Person
X 4
the 12 3 the
RISK
primer Matrix] Matrix] handling eye wash facility. Ensure First Aider Matrix]
Matrix]
availability.
skin
Use appropriate personal protective equipement.
Contact to skin irritatation/
Allergy Ensuure the availability of First Aider.
AL AFIAH ROADS CONTRACTING LLC
Ref. No.
Title RISK ASSESSMENT FORP RECAST FOUDATION AND ROAD MARKING WORKS Rev. No. 0
Date: 1/28/2022
Non- routine
Severity Likelihoo Severity Likelihoo
Emergency
d d
Activity, Job Task, Sub Activity / Consequence / [Refer to [Refer to [Refer to [Refer to Residual Responsible
Routine
No. Hazard / Aspects Procedures Training Other Controls
Location Processes Impacts the the Risk Person
the the
RISK
Matrix] Matrix] Matrix]
Matrix]
8 Road marking Application of Cold X 4 3 12 Safe system of work 4 1 4
works Paint /
Thermoplastic Paint Follow MSDS Material Safety Data Sheet)Proper PPE
skin exposure to must be worn (use chemical resistant gloves , Conduct Tool Box Talk prior to start
paints. Dermatitis Respirators, gas cartridge type respirator and eye the activity. Ensure trained painter
are assigned. MSDS and COSHH
(Dermatitisproble problems spectacles as per standards ). Follow safe system of assessments shall be made available
ms) work. Use appropriate personal protective equipement
at work area and first aid station.
(catridge type respirator, safety glass).
Continuous monitoring by a
competent supervisor. Supervisor to
ensure all required PPE;s are worn
Use appropriate personal protective equipment. (Respiratory equipement, Eye
Ie.respiratory catridge mask shall be used while protection).
Improper use of working with, handling , storing disposing the chemical
PPE containers full or empty. or refer to MSDS for safety
requirement details. The application area shall be
isolate adequately by appropriate means.
Appropriate fire fighting measures shall be implement. Empty containers and left over
Area must be isolate and provide adequate signage.
Phisical injury Empty containers shall not be welded, cut usings gas chemicals shall be discarded as per
local and federal regulatory
(Minor /Major) cutters or arc weklding, or shall shall not be exposed to
Fire requirements. All Empty containers
Property high temperature at any circumstances. Ensure the and left over chemicals shall be
damage empty container shall not be welded, cut using gas
Title RISK ASSESSMENT FORP RECAST FOUDATION AND ROAD MARKING WORKS Rev. No. 0
Date: 1/28/2022
Non- routine
Severity Likelihoo Severity Likelihoo
Emergency
d d
Activity, Job Task, Sub Activity / Consequence / [Refer to [Refer to [Refer to [Refer to Residual Responsible
Routine
No. Hazard / Aspects Procedures Training Other Controls
Location Processes Impacts the the Risk Person
the the
RISK
Matrix] Matrix] Matrix]
Matrix]
Phisical injury
Competent and effective supervision must be provide
In competent (Minor /Major) all kinds of painting acrtivity. Supervisor conduct daily Site inspection
supervising Property tool box talk for related activity.
damage
Phisical injury
(Minor /Major) Keep working area clean and dry at all times. Maintain good
Slip, trip and fall Housekeeping to be done before commencement of
Property any work. housekeeping.Maintain at all times
damage
9 Working in adverse Exposure to hot X 3 4 12 Programs for heat stress prevention on site to be 3 1 3
Title RISK ASSESSMENT FORP RECAST FOUDATION AND ROAD MARKING WORKS Rev. No. 0
Date: 1/28/2022
10 Equipment Movement of heavy X
Non- routine
Severity Likelihoo Severity Likelihoo
Emergency
d d
Activity, Job Task, Sub Activity / Consequence / [Refer to [Refer to [Refer to [Refer to Residual Responsible
Routine
No. Hazard / Aspects Procedures HeavyTraining
Equipment Other Controls
Location Processes Impacts the the Risk Person
the Operation the
RISK
Matrix] Matrix] Matrix]
Matrix]
3 4 12 3 1 3
Personal
Ensure all drivers, operators , Banks man and flagman Avoid reversing vehicle by using
Injuries/
Fatality must be third party cetified. designated turn out
Reversing
Machineries
Assign certified Banksman and
Traffic All vehicles and heavy equipments shall be fitted with flagmen at site to control all vehicular
Accidents reverse alarms.
movements.
Personal 3 3 9 No heavy machinery movement under fog/ sand storm/
Poor Visibility Injuries rain. Competent monitoring
Engineers.
Continuous monitoring by a competent supervisor. Procedure & Emergency Numbers
Emergency
12 Management x Ensure Assigned a First Aider / Male Nurse full time Emergency Evacuation every Entrance and Exit Areas.
available at site. Maintain “Assembly Point” Properly.
Initiate and maintain good housekeeping. Maintain all
Electrocution Fire Personal Injury access always clean and tidy. Install adequate and
(Major / Minor) appropriate fire extinguishers.
Safety and Health Environment Production and Cost 1 (Rare) 2 (Possible) 3 (Likely) 4 (Often) 5 ( Frequent)
Minor injuries which may require self Insignificant Environmental Impacts. Incident event without causing production los.
1 - Insignificant
administered first Aid. Temporary nuisance from noise, odours, Financial Loss ( compensation, fines, cost to
Insignificant impact to sorrounding dust other air emission, vibration and visual repair, plant damages ) of less that AED 5000.
comunities. impacts.
Result in the generation of non-hazardous
waste.
1 2 3 4 5
Injuries requiring treatment by medical Minor environmental impact due to Incident event without causing production los.
practitioners. contained release of pollutants. Financial Loss ( compensation, fines, cost to
Personnel unable to perform assigned Significant use of water, fuels , energy and repair, plant damages ) of less that AED 10000.
duties. ( Restricted Work Cases) other natural resource. to AED50000
2 - Minor
Minor spillage of Chemical (less than
100 liters) to onshore areas.
Minor spillage of chemical (less than 10litter)
for Offshore.
2 4 6 8 10
Serious injuries requiring Treatment by Incident /event without causing production loos
medical practitioner or immediate Significant short term impact to flora/fauna or delay up to one week.
3 - Moderate
evacuation to hospital. Potential for long and water resources. Financial loss ( compensation, fines, cost to
term or permanent disabling effecf. (e.g. Spillage of Chemical more than 100 liters repair plant damage) of AED 50000to
Fracture, chronic back injuries, sprain, resulting to localised impacts. AED500000
burns, etc). Spillage of chemical more than 10 liters to
Offshore areas. 3 6 9 12 15
Single fatality or permanent toal disability. Continous and serious damage to flora/fauna Production loss or delay fro over one month.
from an accident or occupational Illness and water resources. Financial loss ( compensation, fines, cost to
( Poisoning, cancer) Spillage of chemical resulting to widespred repair plant damage) AED 500000to AED 10M.
4 - Major
contamination.
Major destrcution of significant habitant.
Major environmental impact due to
uncontained release. which required outside 4 8 12 16 20
assistance.
Multiple fatality or permanent total Long term impact to environment Loss of the ability to produce.
5- Catastrophic
disabilities from an accident or occupational(Flora/fauna and ground water resources. Severe financial penalties or legal liabilities.
illness ( Poisoning, Cancer) Spillage of chemical resulting to long term Finacial Loss greater that 10M.
environmental effect.
Widespread distruction to a significant area
of land, rare flora and fauna and or ground
water resources. 5 10 15 20 25
Low 1-4 No action required (ALARP Level), unless escalation of risk is posible.
Risk Medium 5-10 Activity can proceed subject to proper management and/or modification
High 12-25 Activity must proceed unless risk is reduced to acceptable level
CPD/PCD/HSE/003
Rev.:00
Compatibility Report for RISK ASSESSMENT FOR DYNAMIC LOAD TEST
ON WORKING CFA PILES.xls
Run on 7/10/2015 9:41
The following features in this workbook are not supported by earlier versions of
Excel. These features may be lost or degraded when opening this workbook in
an earlier version of Excel or if you save this workbook in an earlier file format.
Some cells or styles in this workbook contain formatting that is not supported 53
by the selected file format. These formats will be converted to the closest
format available.
Version
Excel 97-2003