The document summarizes key changes between the EAC 2018 and EAC 2021 standards. It lists 3 clauses that saw additions or expansions to requirements. Clause 7.3 now requires reviewing energy consumption of electric vehicle charging and the status of previous Energy Management Options. Clause 7.3.2 expands performance data requirements for chillers. Clause 7.4.1 adds evaluating previous Energy Management Options. Clause 8.1 introduces new information that must be included in energy audit reports, such as comparing current and previous energy usage and evaluating previous Energy Management Options.
The document summarizes key changes between the EAC 2018 and EAC 2021 standards. It lists 3 clauses that saw additions or expansions to requirements. Clause 7.3 now requires reviewing energy consumption of electric vehicle charging and the status of previous Energy Management Options. Clause 7.3.2 expands performance data requirements for chillers. Clause 7.4.1 adds evaluating previous Energy Management Options. Clause 8.1 introduces new information that must be included in energy audit reports, such as comparing current and previous energy usage and evaluating previous Energy Management Options.
The document summarizes key changes between the EAC 2018 and EAC 2021 standards. It lists 3 clauses that saw additions or expansions to requirements. Clause 7.3 now requires reviewing energy consumption of electric vehicle charging and the status of previous Energy Management Options. Clause 7.3.2 expands performance data requirements for chillers. Clause 7.4.1 adds evaluating previous Energy Management Options. Clause 8.1 introduces new information that must be included in energy audit reports, such as comparing current and previous energy usage and evaluating previous Energy Management Options.
Note: The following table gives a list of changes with key wordings shown. Please refer to EAC 2021 for the detailed requirements.
Clause No. EAC 2018 EAC 2021
1) 7.3 - Review of Energy Specified in clause 7.3.1 New requirements of reviewing Consuming Equipment the energy consumption by charging facilities of electric vehicles through separated metering and implementation progress and status of EMO(s) suggested in previous energy audit are introduced in clause 7.3.1 (j) and (m) respectively Specified in clause 7.3.2 Clause 7.3.2 has been expanded by introducing new statements requiring the performance data of chillers and data of total power factor and total harmonic distortion based on any in-situ metering facilities or BMS available data in (d) & (e) 2) 7.4 – Identification of EMO Specified in clause 7.4.1 New requirement of evaluation of the implementation and energy performance of EMOs in respect of previous energy audit(s) is introduced in clause 7.4.1 (g) 3) 8.1 – Information for Specified in clause 8.1 New requirements of information Report to be included in energy audit report, such as: - Comparison of the current EUI with the EUI of previous energy audit - Energy consumption and evaluation of EMO(s) implemented in respect of previous energy audit(s) are introduced in clause 8.1(a), (g) and (m) respectively