Engineering Department
Monthly Report
FMD
April Monthly Report
Supply the bioreactors with desired pipes and connection for first use
of N2 gas.
Fixing the clean Area access control doors.
Design a safety circuit for vaccum tester input signals and mounting it
on the production line with proximity sensor.
Fixing the broken trolleys.
Routine production work.
Routine maintenance work.