Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

THE LINK ROAD FROM MOJO TO ARBA MINCHI PROJECT

BSc. PROJECT
BY
GROUP-SIX

JANUARY, 2022
ADDIS ABEBA, ETHIOPIA
THE LINK ROAD FROM MOJO TO ARBA MINCHI PROJECT

BY
GROUP-THREE

A THESIS SUBMITTED TO THE FACULTY OF CIVIL ENGINEERING, SCHOOL OF


UNDER GRADUATE STUDIES, LABU-LAFTO CAMPUS, RIFT VALLEY UNIVERSITY IN
PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE DEGREE OF BACHLER
OF SCIENCE IN CIVIL ENGINEERING
DECLARATION
I hereby declare that this BSc. Project is our original work and has not been presented for a degree
in any other university, and all sources of material used for this Project have been duly
acknowledged.

Name of group member’s ID numbers Sign


1. Abraham Ifa 0003/16
2. Mandefiro Teshoma 0041/16
3. Bilisumma Defaru 0101/16
4. Tura Tolani 0094/16
5. Tadele Geleta 0086/16
RIFT VALLEY UNIVERSITY
ADVISORS’ RESEARCH SUBMISSION APPROVAL SHEET
This is to certify that the thesis entitled “Link Road from Mojo to Arba Minchi Project” Submitted
to Civil Engineering, and has been carried out by group three under my supervision. Therefore I
recommend that the student has fulfilled the requirements and hence hereby can submit the thesis
to the department for defense.

__________________________ ________________ ______________


Name of advisor Signature Date
EXAMINERS’ APPROVAL PAGE
Approved by: We the examiners’ board approve that this thesis has passed through the defense
and review process

_____________________ ___________________ ________________


Chairperson Signature Date

_____________________ ___________________ ________________


Examiner Signature Date

_____________________ ___________________ ________________


Advisor Signature Date

_____________________ ___________________ ________________


Faculty Dean Signature Date

You might also like