Professional Documents
Culture Documents
002 Excavation & Trenchingpdf
002 Excavation & Trenchingpdf
Risk Ratings
Activity : Excavation & Trenching Concerned Department: RAEC Project Department 6-9 High Risk
3-4 Medium Risk
1-2 Low Risk
Likelihood (L)
Severity (S)
Severity (S)
Hazards Effects/
Sl Hazards/ Threat Control Measure Action Status
Consequences
1
and rock direct supervision of competent be
person implemented
4. Only trained operator /worker shall
do the excavation..
1
damage supervision shall be provided
adjoining structure be
5. Follow the safe operating implemented
procedure
nd
Revision – 0 Date – 22 June 2014 Document # AJTC-HSE-RA-96-2013-002 Page 1 of 3
AL JOOD TRADING & CONTRACTION COMPANY LLC
TENDER NO 96-2013, EPC FOR CONSTRUCTION1.OFProper
KHASAB NEW POWER
housekeeping shall be STATION
maintained
2. Open trench shall be barricaded Training shall
and safety sign shall be posted be provided
Human Injury
3 Slip , trip and fall 3. Every day barricading shall be and SOP shall
1
Equipment Damage
inspected by competent person be
4. Toolbox talk shall be conducted by implemented
competent person
1
item or other item 3. Horseplay shall not be allowed be
4. Use proper PPE implemented
1
injury equipment shall be used be
4. Use proper PPE i.e. safety shoes implemented
,coverall hand gloves and hard hat
1
shall be used be
4. Every hour 15 minutes rest to the implemented
working party shall be provided
nd
Revision – 0 Date – 22 June 2014 Document # AJTC-HSE-RA-96-2013-002 Page 2 of 3
AL JOOD TRADING & CONTRACTION COMPANY LLC
TENDER NO 96-2013, EPC FOR CONSTRUCTION OF KHASAB NEW POWER STATION
Assessed by: Mohammed Imteyaz Khan Reviewed & Approved by: Ajesh Chandran
Signature: Signature:
Date: Date:
nd
Revision – 0 Date – 22 June 2014 Document # AJTC-HSE-RA-96-2013-002 Page 3 of 3