AL JOOD TRADING & CONTRACTION COMPANY LLC

TENDER NO 96-2013, EPC FOR CONSTRUCTION OF KHASAB NEW POWER STATION

Risk Ratings
Activity : Driving and Transportation Concerned Department: RAEC Project Department 6-9 High Risk
3-4 Medium Risk
1-2 Low Risk

Risk Rating Score Residual Risk

Risk Rating (R=SxL)

Risk Rating (R=SxL)


Likelihood (L)

Likelihood (L)
Severity (S)

Severity (S)
Hazards Effects/
Sl Hazards/ Threats Control Measure Action Status
Consequences

1. Pedestrian ways shall be marked


and segregated
2. Vehicle shall not exceed a
maximum speed of 30 KMPH within Training shall
the site are and their surrounding be provided
Over Speeding/Speed Road Traffic Accident, 3. The specified speed limit by the
1 and SOP shall
3

1
limit not prescribed Property Damage, ROP in all the areas shall be be
followed implemented
4. Only authorized person shall drive
the company vehicle

nd
Revision – 0 Date – 22 June 2014 Document # AJTC-HSE-RA-96-2013-007 Page 1 of 5
AL JOOD TRADING & CONTRACTION COMPANY LLC
TENDER NO 96-2013, EPC FOR CONSTRUCTION1.OFMaintain
KHASAB the NEW
vehiclePOWER STATION
at road worthy
condition always
2. Check the vehicle every day Training shall
Human injury, delay in morning by using the form no be provided
2 Mechanical/E,E failure journey or reporting to work (AJTC-HSE-F-10) for early detection and SOP shall

1
site of any fault be
3. Vehicle service shall be carried on implemented
time prescribe in the (AJTC-AD-OP-
01)

1. Prior to handing over the company


vehicle to any of the drivers or
staffs an under taking letter shall be
obtained detailing that all the
requirements of ROP and company
policy shall be followed all the Training shall
time. be provided
RTA, PD, Human Injury
3 Carelessness of Driver 2. Prior to start the vehicle it shall be and SOP shall

1
Equipment Damage
checked by the driver be
3. Seat belt shall be used implemented
4. Don’t use the telephone while
driving
5. Follow the speed limits
6. Don’t allow the overloading

nd
Revision – 0 Date – 22 June 2014 Document # AJTC-HSE-RA-96-2013-007 Page 2 of 5
AL JOOD TRADING & CONTRACTION COMPANY LLC
TENDER NO 96-2013, EPC FOR CONSTRUCTION1.OFPedestrian
KHASABshall
NEW
use POWER
only the STATION
demarked walkways
2. Never go through the middle of the
road not specified as pedidestrain
road Training shall
3. Follow the safety signs and be provided
Carelessness of barricade
4 Human injury, fatality and SOP shall

1
pedestrian 4. Don’t use the headphone while be
crossing the road implemented
5. High visibility jacket shall be worn
while working during the night or in
less lighting

1. Only authorized driver with valid


ROP license shall drive the vehicle
2. Vehicle with running engine shall Training shall
RTA, materials damage, not be left unattended be provided
Driving by
5 injury to public, legal 3. Vehicle shall not be swiped or and SOP shall

1
unauthorized person
consequences handed over to other without prior be
approval and concerned with the implemented
authorised person for the same.

nd
Revision – 0 Date – 22 June 2014 Document # AJTC-HSE-RA-96-2013-007 Page 3 of 5
AL JOOD TRADING & CONTRACTION COMPANY LLC
TENDER NO 96-2013, EPC FOR CONSTRUCTION1.OFOnly
KHASAB NEWand
experienced POWER STATION
with all the
valid legal documents drivers shall
be used for materials
transportation of materials
2. Entry test for drivers shall be
conducted prior to appointment of Training shall
Violation of traffic
new drivers be provided
rules/use of RTA, fatality, Material
6 3. Speed limit and all the traffic rules and SOP shall

1
inexperienced driver Damage, Legal consequences
shall be followed be
for transportation
implemented
4. Drivers requirements in accordance
with the (AJTC-HSE-ML-01) shall be
strictly followed
5. No telephone call shall be
entertained by drivers while driving

1. No journey shall be allowed if


drivers found under the influenced Training shall
of alcohol be provided
Influence of Alcohol
7 RTA, Fatality, Human Injury 2. Consumption of alcohol is strictly and SOP shall

1
while driving
prohibited while working on duty be
3. Random dope test may be carried implemented
out

1. Heavy equipment working in the


vicinity must have banks man
2. Place traffic controllers on site if
feasible (flagman) Training shall
Other 3. Post adequate safety signs such as be provided
Human Injury, Property
8 vehicle/equipment speed limit, way to pedestrian, way and SOP shall
2

1
damage
working in the vicinity to heavy vehicle and equipment be
4. Conduct awareness training implemented
5. Follow the site safety rules
6. Maintain the barricade and signage

nd
Revision – 0 Date – 22 June 2014 Document # AJTC-HSE-RA-96-2013-007 Page 4 of 5
AL JOOD TRADING & CONTRACTION COMPANY LLC
TENDER NO 96-2013, EPC FOR CONSTRUCTION OF KHASAB NEW POWER STATION
Assessed by: Mohammed Imteyaz Khan Reviewed & Approved by: Ajesh Chandran

Position: Head of HSE Position: Project Manager

Signature: Signature:

Date: Date:

nd
Revision – 0 Date – 22 June 2014 Document # AJTC-HSE-RA-96-2013-007 Page 5 of 5