Govt. of West Bengal P.W. (Roads) Directorate: WITH EFFECT FROM 30.04.2012
Govt. of West Bengal P.W. (Roads) Directorate: WITH EFFECT FROM 30.04.2012
OF WEST BENGAL
P.W. (ROADS) DIRECTORATE
The aforesaid table including the earlier corrigenda and addenda is replaced by the following table.
Department)
1 2 3 4 5 6
1. Cement :
(1) Rates furnished in column
– 4 for item 1 & 2 are the
PPC / PSC / OPC 33 MT 7050.00 6420.00
Issue Rates of the materials
OPC (43/53 Grade) MT 7720.00 at Departmental Stack yards /
7030.00
Go downs. In case of misuse
2. Steel materials : Kolkata / Siliguri or loss of the materials from
Durgapur the Contractor’s custody, the
cost is to be recovered from
(i) Mild Steel rods. MT 54000.00 49300.00 50300.00 the Contractor’s bill or other
(Fe 250 ,conforms to IS: 432) dues as specified in P. W.
Department Order No. 2809
(ii)Tor Steel rods/HYSD MT 54000.00 49300.00 50300.00 (3)-A dated 24.07.1971.
bars/TMT bars.
(Fe 415 /Fe 500 /Fe 500D , (2) For Sub-items of Item No.
conforms to IS: 1786) 2, the Basic Prices, exclusive
of contractor’s profit but
(iii)TISCON-CRS 42 or any MT 62500.00 57250.00 58250.00 inclusive of all taxes & duties,
other approved brand. are given in column 5. To
arrive at the complete rate,
(iv) Strands TATA SSL / MT 64400.00 59000.00 60000.00
USHA Martin or any a) Add contractor’s profit
other approved brand. @ 10% on Basic price of
(conforms to IS6006 / IS14268) steel.
Page 1 of 24
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012
Unit
Department)
1 2 3 4 5 6
Kolkata / Siliguri
Durgapur
2. (vi) High tension Steel plates MT - 55000.00 56000.00 b) Add cost of carriage
( E 410 conforms to IS:2062- from outlet to site
2006)thickness upto 20mm including necessary
loading unloading and
(vii) Structural steel (MS) stacking.
angles, joists, channels, flats
etc. (3) The rate of the items
( E 250 conforms to IS:2062 & involving use of cement
808) supplied by the contractor
shall be evaluated as per
(a) up to 200mm size. MT 48530.00 44200.00 45200.00 Format – C of 4th
Corrigenda
(b) above 200mm and MT 51530.00 47000.00 48000.00
up to 400 mm size.
(c) Above 400 mm MT - 56250.00 57250.00
size.
Superintending Engineer
Bridge Planning Circle
P.W.(Roads)Directorate
Page 2 of 24
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012
2.TABLE NO. I-2 (EX-OUTLET PRICES OF BITUMEN ) OF SCHEDULE OF RATES OF P. W. (ROADS) DIRECTORATE – 2008-09.
The aforesaid table including the earlier corrigendum and addendum is replaced by the following table.
.
Superintending Engineer
Bridge Planning Circle
P.W.(Roads)Directorate
Page 3 of 24
A. 3. TABLE II – 1 : SUPPLY OF DIFFERENT MATERIALS AS PER APPROVED SPECIFICATION OF SCHEDULE OF RATES OF P. W.
(ROADS) DIRECTORATE – 2008-09. (The following items of the aforesaid table have been replaced as follows)
Kolkata / 24 Parganas
Darjeeling plains
West Medinipur
East Medinipur
N & S Dinajpur
Murshidabad
Coochbehar
Jalpaiguri &
Burdwan
Birbhum
Bankura
Purulia
(N & S)
Malda
Nadia
Sl.
Description of Item Unit Remarks
No.
244 66 Deleted
Howrah / Hooghli
West Midnapur
N & S Dinajpur
East Midnapur
Haldibari P.S.
Murshidabad
Burdwan
Remarks
Birbhum
Bankura
Kolkata
Maldah
Purulia
Nadia
Page Sl.
Unit
Description of Items
No. No
(b) In 1 : 4 proportion. m3 5277 4862 4279 4279 5277 5219 5161 4551 4953 4953 4920 4882 4854 4891 6563
(c) In 1 : 6 proportion. m3 4947 4532 3949 3949 4947 4889 4831 4221 4623 4623 4590 4551 4524 4561 6233
291 5 Brick pavement with 1st
class / picked jhama bricks
……….
(a) When laid with a
cushion of sand below
including cost thereof:
(i) One brick flat m2 372 338 294 294 372 366 359 313 349 349 345 340 337 341 475
pavement.
(ii) One brick on m2 553 504 436 436 553 545 538 467 515 515 511 506 503 507 703
edge pavement.
(iii) One brick on m2 563 514 446 446 563 555 548 478 526 526 521 516 513 518 714
edge pavement
laid in herring
bone bond
pattern.
Howrah / Hooghli
West Midnapur
N & S Dinajpur
East Midnapur
Haldibari P.S.
Murshidabad
Burdwan
Remarks
Birbhum
Bankura
Kolkata
Maldah
Purulia
Nadia
Page Sl.
Unit
Description of Items
No. No
side as well.
(i) One brick flat m2 411 376 331 331 411 404 396 351 387 387 383 378 375 379 516
pavement.
(ii) One brick on m2 592 543 475 475 592 585 577 506 555 555 551 545 542 547 745
edge pavement.
Page 7 of 24
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012
All districts of
West Bengal and
Page Item Darjeeling hill
Description of Items Unit Darjeeling plain Remarks
No. No. area
of Siliguri Sub-
division
Page 8 of 24
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012
All districts of
West Bengal and
Page Item Darjeeling hill
Description of Items Unit Darjeeling plain Remarks
No. No. area
of Siliguri Sub-
division
Section (B) In Base / Binder Course using
4.7 3.4 % binder content by weight of
total mix as per approved
specification, grading and
compacted density of the mix.
Page 9 of 24
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012
All districts of West
Page Item Bengal and Darjeeling hill
Description of Items Unit Remarks
No. No. Darjeeling plain of area
Siliguri Sub-division
Section 35 Laying Dense Bituminous
4.7 Macadam layer (as base / binder
course) by Hot Mix Plant using
coarse aggregate, fine aggregate,
filler and binder as per design Job
Mix Formula, conforming Marshall
Method as per specification, over
prepared surface coated with tack
coat, including screening, cleaning of
chips and preparing a uniform and
quality mix in Hot Mix Plant and
ensuring a homogenous mix, in which
all particles of the mineral aggregates
are coated uniformly, carrying the hot
premixed materials by means of
tipper truck, spreading the mixed
materials at specified laying
temperature over the prepared
surface by means of a suitable paver
finisher, tamping and finishing the mix
to specified grade, line and cross
section, through rolling with suitable
power rollers for break down, inter -
mediate and finished rolling to
achieve the desired density of at least
98% of that of Laboratory Marshall
specimen, hand packing and pinning
to give an even surface including cost
and carriage of bitumen/CRMB,
course and fine aggregates and filler
materials and hire charges of Hot Mix
Plant and all other machines, Add cost of
equipments for construction and materials and
quality control as per IRC carriage as per
specification, fuels, and lubricants consumption
and wages of operational staff chart to get the
complete excluding the cost of final
applying Tack coat. consolidated
item rate.
(a) 50mm compacted thickness:
Page 10 of 24
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012
All districts of West
Page Item Bengal and Darjeeling hill
Description of Items Unit Remarks
No. No. Darjeeling plain of area
Siliguri Sub-division
(ii) Using Drum mix type HMP of m2 73.70 76.80
minimum capacity 60-90 TPH.
(iii) Using Drum mix Type HMP of m2 84.90 88.60
minimum capacity 40-60 TPH.
Page 11 of 24
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012
All districts of
West Bengal
Page Item Darjeeling hill
Description of Items Unit and Darjeeling Remarks
No. No. area
plain of Siliguri
Sub-division
machineries, pay of operators, cost of
fuel and lubricants and all other
incidental charges complete
excluding cost of applying tack coat.
Page 12 of 24
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012
All districts of
West Bengal
Page Item Darjeeling hill
Description of Items Unit and Darjeeling Remarks
No. No. area
plain of Siliguri
Sub-division
desired density of at least 98% of that
of Laboratory Marshall specimen,
including the cost and carriage of
aggregates, filler and binder, heating
the binder, preheating the
aggregates, and filler to the specified
temperature, including the hire Add cost of
charges of Hot Mix Plant and other materials and
machineries, pay of operators, cost of carriage as per
fuel and lubricants and all other consumption
incidental charges complete chart to get the
excluding cost of applying tack coat. final
consolidated
(a) 25 mm compacted thickness: item rate.
Page 13 of 24
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012
All districts of
West Bengal
Page Item Darjeeling hill
Description of Items Unit and Darjeeling Remarks
No. No. area
plain of Siliguri
Sub-division
Sectio 38 Providing & Laying 20 mm thick
n 4.7 open graded Premixed Carpet by
Hot Mix Plant using 13.2 mm (@
0.18 m3/m2) and 11.2 mm (@ 0.09
m3/m2) size stone aggregates,
including thorough cleaning of the
surface, applying tack coat, screening
cleaning and pre-heating stone chips
and fully pre-coating the same with
hot matrix @ 54 kg/m3 of aggregate
mix, carrying the mixture by tipper
trucks or by any other suitable
arrangements, laying the mixture
uniformly over the surface with paver
finisher, including manual operations
as and when required for proper
level, grade and camber, thoroughly
rolling by power roller, including the
cost and carriage of stone chips and
matrix, heating the matrix, preheating
the aggregates to required
temperature and including the hire
charges of Hot Mix Plant and other
machineries, pay of operators, cost of
fuel and lubricants etc. all complete
excluding cost of applying tack coat.
Page 14 of 24
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012
including screening and cleaning the
aggregates as necessary, preheating,
pre-coating the same in Hot Mix Plant
with hot matrix, carrying the mixture
by tipper trucks or any other suitable
arrangements, laying premixed
materials uniformly with paver
finisher, including manual operations
as and when required, compacting
with power roller including the cost
and carriage of aggregates and
matrix, cost for heating the matrix and
aggregates, including hire charges of
Hot Mix Plant and other machineries,
pay of operators, cost of fuel and
lubricants etc. including all incidental
charges complete excluding cost of
applying Tack coat.
(a) Type – A : Using 2.2 kg
bitumen per square meter.
Page 15 of 24
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012
All districts of
West Bengal and
Page Item Darjeeling hill
Description of Items Unit Darjeeling plain Remarks
No. No. area
of Siliguri Sub-
division
Section 1 Narrow Filter Sub-Surface Drain : RM 260.00 268.00
4.11 Construction of a narrow filter sub-
surface drain consisting of porous or
perforated pipe laid in narrow trench
surrounded by a geotextile filter fabric,
with a minimum of 450 mm overlap of
fabric and installed as per clause 702.3
and 309.3.5 of MoRTH Specifications
for Road & Bridge Works including
excavation and backfilling & removal of
excess earth. Using geosynthetic pipe
of 150 mm dia.
Section 2 Laying Paving Fabric Beneath a m2 104.00 105.00
4.11 Pavement Overlay :
Providing and laying paving fabric with
physical requirements as per table 704-
2 of MoRTH Specifications for Road &
Bridge Works over a tack coat of paving
grade Bitumen 80-100 penetration, laid
at the rate of 1 kg per sqm over
thoroughly cleaned and repaired
surface to provide a water resistant
membrane and crack retarding layer.
Paving fabric to be free of wrinkling and
folding and to be laid before cooling of
tack coat, brooming and rolling of
surface with pneumatic roller to
maximise paving fabric contact with
pavement surface.
Page 16 of 24
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012
All districts of
West Bengal and
Page Item Darjeeling hill
Description of Items Unit Darjeeling plain Remarks
No. No. area
of Siliguri Sub-
division
Section 3 Laying Boulder Apron in Crates of m3 730.00 737.00
4.11 Synthetic Geogrids: Providing, Note:
preparing and laying of geogrid crated Construction
apron 1 m x 5 m, 600 mm thick wing shall
including excavation and backfilling with add cost of
baffles at 1 metre interval, made with 1.15 cum
Stones with
geogrids having characteristics as per
minimum size
clause 704.2 of MoRTH Specifications of 200 mm &
for Road & Bridge Works, joining sides 0.15 cum of
with connectors/ring staples, top Stones spall
corners to be tie tensioned, placing of for filling
suitable cross interval ties in layers of voids to
300 mm connecting opposite side with arrive at the
lateral braces and tied with polymer consolidated
braids to avoid bulging, constructed as rate.
per clause 704.3 of MoRTH
Specification. filled with stone with
minimum size of 200 mm and specific
gravity not less than 2.65, packed with
stone spalls, keyed to the foundation
recess in case of sloping ground and
laid over a layer of geotextile to prevent
migration of fines, all as per clause 704
and laid as per clause 2503.3 of
MoRTH Specifications for Road &
Bridge Works and approved design.
Page 17 of 24
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012
Page 18 of 24
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012
Notes :
1. Construction wing should add the cost of Drainage arrangement including filter media as per approved design and drawings.
2. The specification and construction details to be adopted shall be as per section 3100 of MoRTH Specification.
3. Length of reinforcing strips will vary with the height of wall and will be as per approved design and drawings.
4. The type of reinforcing elements to be adopted shall be as per approved design and specifications.
5. The rate provided is for estimation purpose only, the actual market rate for supply of reinforcing elements and their accessories
are to be ascertained from reputed firms in the field of earth reinforcement.
6. The earth fill material shall be clean, free draining, granular with high friction and low cohesion, non-corrosive, coarse grained with
not 10 per cent of particles passing 75 micron sieve, free of any deleterious matter, chlorides, salts, acids, alkalies, mineral oil,
fungus and microbes and shall be of specified PH value.
7. Capping beam is to be priced separately as per approved design. The rate for cement concrete shall be taken from section 4.4 of
Departmental Schedule of Rates.
Superintending Engineer
Bridge Planning Circle
P.W.(Roads)Directorate
Page 19 of 24
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012
All districts of
West Bengal and
Page Item
Description of Items Unit Darjeeling plain Darjeeling hill area Remarks
No. No.
of Siliguri Sub-
division
Note :
1. In case earth is not available
from Govt. land,
compensation for earth will
be required. The position is
required to be clearly stated
and considered in the cost
estimate.
2. Cost of Flyash has not been
considered as same will be
available free of cost. Only
carriage of Flyash has been
provided.
3. Lime + Flyash has been taken
as 20 per cent of total mass
and ratio of lime and Flyash
as 1:4 for estimating
purposes. Total quantities
will be as per approved
design.
Page 20 of 24
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012
All districts of West
Page Item Bengal and Darjeeling Darjeeling hill
Description of Items Unit Remarks
No. No. plain of Siliguri Sub- area
division
Section
4.4 116 Construction of Temporary Island
upto 1.25 m height by sand / dry Note :
soil filled cement / polytheline
bags and removal of the same It is assumed
after main construction activity. that earth will
be available
(i) Area of Island between 100 m² to Each 15645.00 15983.00 within the
120 m² working
space of
(ii) Area of Island between 120 m² to Each 17871.00 18280.00 crane with
140 m² grab bucket.
(iii) Area of Island between 140 m² to Each 20232.00 20719.00
160 m²
Page 21 of 24
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012
All districts of
West Bengal and
Page Item
Description of Items Unit Darjeeling plain Darjeeling hill area Remarks
No. No.
of Siliguri Sub-
division
Page 22 of 24
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012
All districts of
West Bengal
and
Item Darjeeling
Page No. Description of Items Unit Darjeeling Remarks
No. hill area
plain of
Siliguri Sub-
division
Section 4.7 18A Providing and laying Premixed Seal Coat m2 Note: Add cost of
(Type C) with approved quality stone chips materials and
and hot bitumen binder @ 6.5 kg per 10 carriage as per
sqm on thoroughly cleaned black top specification to
surface coated with tack coat including get the final
heating & mixing cleaned stone aggregates consolidated item
using 0.09 m³/10 m² of 5.6 mm size (100% rate.
passing through 9.5 mm sieve and retained
on 2.36 mm sieve) in suitable pan / Mixer
Machine / Mobile Hot Mix Plant (Light duty),
laying and spreading the mix at an uniform
rate using suitable means, brushing the
surface, if necessary, to ensure uniformity,
followed by rolling with power roller
including the cost and carriage of binder
and aggregates, cost of heating the binder
and aggregates and all other incidental
charges, cost of fuel and lubricants,
including hire charges of machineries, tools
& plants required for construction and
quality control complete. excluding cost of
applying tack coat.
Superintending Engineer
Bridge Planning Circle
P.W.(Roads)Directorate
Page 23 of 24
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012
Superintending Engineer
Bridge Planning Circle
P.W.(Roads)Directorate