GOVT.

OF WEST BENGAL
P.W. (ROADS) DIRECTORATE

7TH. CORRIGENDA, ADDENDA & ERRATA


OF
SCHEDULE OF RATES FOR
ROAD & BRIDGE WORKS, 2008-2009 OF
P.W. (ROADS) DIRECTORATE
APRIL, 2012

WITH EFFECT FROM 30.04.2012

Office of the Superintending Engineer


Bridge Planning Circle, P.W. (Roads) Directorate
Bhabani Bhawan, Alipore, Kolkata – 700 027
Ph.(Fax) No. (033) 2439 8327, e-mail : se_bpc@ yahoo.co.in

Price Rs. 120/-


7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012

A. CORRIGENDA OF SCHEDULE OF RATES OF P.W.(ROADS) DIRECTORATE 2008-09

1. Annexure -I, Table. I-1: of Schedule of Rates of P. W. (Roads) Directorate – 2008-09.


( Issue Rates of Cement & Steel Materials )

The aforesaid table including the earlier corrigenda and addenda is replaced by the following table.

TABLE I - 1 : ISSUE RATES OF CEMENT & STEEL MATERIALS

Item Description of Items Issue Rate Basic Price Remarks


No. (Supplied by (Supplied by Contractor)
Unit

Department)

1 2 3 4 5 6
1. Cement :
(1) Rates furnished in column
– 4 for item 1 & 2 are the
PPC / PSC / OPC 33 MT 7050.00 6420.00
Issue Rates of the materials
OPC (43/53 Grade) MT 7720.00 at Departmental Stack yards /
7030.00
Go downs. In case of misuse
2. Steel materials : Kolkata / Siliguri or loss of the materials from
Durgapur the Contractor’s custody, the
cost is to be recovered from
(i) Mild Steel rods. MT 54000.00 49300.00 50300.00 the Contractor’s bill or other
(Fe 250 ,conforms to IS: 432) dues as specified in P. W.
Department Order No. 2809
(ii)Tor Steel rods/HYSD MT 54000.00 49300.00 50300.00 (3)-A dated 24.07.1971.
bars/TMT bars.
(Fe 415 /Fe 500 /Fe 500D , (2) For Sub-items of Item No.
conforms to IS: 1786) 2, the Basic Prices, exclusive
of contractor’s profit but
(iii)TISCON-CRS 42 or any MT 62500.00 57250.00 58250.00 inclusive of all taxes & duties,
other approved brand. are given in column 5. To
arrive at the complete rate,
(iv) Strands TATA SSL / MT 64400.00 59000.00 60000.00
USHA Martin or any a) Add contractor’s profit
other approved brand. @ 10% on Basic price of
(conforms to IS6006 / IS14268) steel.

(v) Steel plates :


( E 250 conforms to IS:2062-
2006)
(a) 6 – 10 mm. MT - 45320.00 46320.00
(b) 10 – 20 mm. MT - 47040.00 48040.00
(c) 25 – 40 mm. MT - 48820.00 49820.00

Page 1 of 24
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012

Item Description of Items Issue Rate Basic Price Remarks


No. (Supplied by (Supplied by Contractor)

Unit
Department)

1 2 3 4 5 6
Kolkata / Siliguri
Durgapur

2. (vi) High tension Steel plates MT - 55000.00 56000.00 b) Add cost of carriage
( E 410 conforms to IS:2062- from outlet to site
2006)thickness upto 20mm including necessary
loading unloading and
(vii) Structural steel (MS) stacking.
angles, joists, channels, flats
etc. (3) The rate of the items
( E 250 conforms to IS:2062 & involving use of cement
808) supplied by the contractor
shall be evaluated as per
(a) up to 200mm size. MT 48530.00 44200.00 45200.00 Format – C of 4th
Corrigenda
(b) above 200mm and MT 51530.00 47000.00 48000.00
up to 400 mm size.
(c) Above 400 mm MT - 56250.00 57250.00
size.

(viii) Supply of approved MT - 59300.00 -


brand zinc rich cold
galvanized coated
reinforcement (Fe 415
grade) conforming to the
specification given in the
appendix 1000/2 of
Specifications for Road &
Bridge Works of MORT&H (
draft ) and work on the
principle of composite action
of sacrificial and barrier
protection of corrosion
process.

Superintending Engineer
Bridge Planning Circle
P.W.(Roads)Directorate

Page 2 of 24
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012

A. CORRIGENDA TO THE SCHEDULE OF RATES, P. W. (ROADS) DIRECTORATE – 2008-09

2.TABLE NO. I-2 (EX-OUTLET PRICES OF BITUMEN ) OF SCHEDULE OF RATES OF P. W. (ROADS) DIRECTORATE – 2008-09.
The aforesaid table including the earlier corrigendum and addendum is replaced by the following table.

TABLE NO. I-2 EX-OUTLET PRICES OF BITUMEN

Rates at outlets (Rs.)


Sl. No. Description of item Unit
At Haldia At Kolkata
1. Bitumen (Bulk) :VG-10 (80/100) MT 40471.00 ***

2. Bitumen (Packed) :VG-10 (80/100) MT 44160.00 ***

3. Bitumen (Bulk) :VG-30 (60/70) MT 41423.00 ***

4. Bitumen (Packed) :VG-30 (60/70) MT 45112.00 ***

5. Bitumen (Bulk) :VG-40 (30/40) MT 44267.00 ***

6. Bitumen (Packed) :VG-40 (30/40) MT 47956.00 ***

7. Bituminous Emulsion (Bulk) MS Type MT 30249.00

8. Bituminous Emulsion (Packed) MS Type MT *** 41903.00

9. CRMB – 55 (Bulk) MT 41542.00 ***

10. CRMB – 55 (Packed) MT 45409.00 ***

11. CRMB – 60 (Bulk) MT 41506.00 ***

12. CRMB – 60 (Packed) MT 45373.00 ***

Note : I,II,III,IV remain same as that of 4th Corrigenda

.
Superintending Engineer
Bridge Planning Circle
P.W.(Roads)Directorate

Page 3 of 24
A. 3. TABLE II – 1 : SUPPLY OF DIFFERENT MATERIALS AS PER APPROVED SPECIFICATION OF SCHEDULE OF RATES OF P. W.
(ROADS) DIRECTORATE – 2008-09. (The following items of the aforesaid table have been replaced as follows)

Kolkata / 24 Parganas

Darjeeling Hill Area


Howrah / Hooghli

Darjeeling plains
West Medinipur
East Medinipur

N & S Dinajpur
Murshidabad

Coochbehar

Jalpaiguri &
Burdwan

Birbhum
Bankura

Purulia
(N & S)

Malda
Nadia
Sl.
Description of Item Unit Remarks
No.

7 Bricks / Jhama / Bats sorted


& stacked at site
a. 1st Class bricks.
1000 Nos. 8000 8000 7300 8000 8000 6700 6100 6100 7300 7300 7300 7300 7300 7300 10300
b. Picked Jhama bricks.
1000 Nos. 8000 8000 7200 7800 7800 6500 5700 5700 7200 7200 7200 7200 7200 7200 9700
c. Jhama metal.
m3 1650 1650 1150 1150 1600 - - 1150 1150 1150 1100 1100 1100 1100 -
d. Brick bats.
m3 1150 1150 950 1100 1150 800 800 800 950 850 950 1000 1000 1000 2200
9 Hume Pipe : (Ex – outlet)
a. 600 dia NP3 m 2112 2112 2112 2112 2112 2112 2112 2112 2112 2112 2112 2112 2112 2112 2112 Note:
b. 600 dia NP4 m 2652 2652 2652 2652 2652 2652 2652 2652 2652 2652 2652 2652 2652 2652 2652 These
c. 900 dia NP3 m 3787 3787 3787 3787 3787 3787 3787 3787 3787 3787 3787 3787 3787 3787 3787 rates are
d. 900 dia NP4 m 4798 4798 4798 4798 4798 4798 4798 4798 4798 4798 4798 4798 4798 4798 4798 inclusive of
e. 1000 dia NP3 m 4359 4359 4359 4359 4359 4359 4359 4359 4359 4359 4359 4359 4359 4359 4359 all taxes
f. 1000 dia NP4 m 5846 5846 5846 5846 5846 5846 5846 5846 5846 5846 5846 5846 5846 5846 5846 and
g. 1200 dia NP3 m 6349 6349 6349 6349 6349 6349 6349 6349 6349 6349 6349 6349 6349 6349 6349 contractor’s
h. 1200 dia NP4 m 8669 8669 8669 8669 8669 8669 8669 8669 8669 8669 8669 8669 8669 8669 8669 profit.
10 Collar : (Ex – outlet)
a. 600 dia NP3 each 463 463 463 463 463 463 463 463 463 463 463 463 463 463 463
b. 600 dia NP4 each 521 521 521 521 521 521 521 521 521 521 521 521 521 521 521
c. 900 dia NP3 each 807 807 807 807 807 807 807 807 807 807 807 807 807 807 807
d. 900 dia NP4 each 818 818 818 818 818 818 818 818 818 818 818 818 818 818 818
e. 1000 dia NP3 each 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950
f. 1000 dia NP4 each 980 980 980 980 980 980 980 980 980 980 980 980 980 980 980
g. 1200 dia NP3 each 1613 1613 1613 1613 1613 1613 1613 1613 1613 1613 1613 1613 1613 1613 1613
h. 1200 dia NP4 each 2094 2094 2094 2094 2094 2094 2094 2094 2094 2094 2094 2094 2094 2094 2094
Note:Other items of the aforesaid table remain unchanged.
Superintending Engineer
Bridge Planning Circle
P.W.(Roads)Directorate
A. CORRIGENDA OF SCHEDULE OF RATES OF P.W.(ROADS) DIRECTORATE 2008-09
4.
All districts of
West Bengal and
Page Item Darjeeling
Description of Items Unit Darjeeling plain Remarks
No. No. hill area
of Siliguri Sub-
division
190 29 Supplying, testing and installation of (Payment of this
1.0-2.0 m wide Woven Jute Geotextile item will be made
724gm/sqm for strengthening of sub- on the finished
grades, having minimum tensile strength area of jute
geotextile)
of 25 KN/m with a porometry range of
150 to 400 micron, duly secured to sub-
grade by u-shaped M.S. staples (11
gauge) at an interval of 750 mm or as per
direction of Engineer-in-Charge. The jute
fabric should be laid with an overlap of
150 mm cross-wise and 300 mm
longitudinally as per direction of the
Engineer-in-Charge.

Using Untreated Woven Jute Geotextile


(Grey) m2 54.60 57.60

243 64 Performing lateral load test on two piles


or two groups of piles by ……... Each 13000.00 13000.00

243 65 Vertical Load Test (Compression) by


hydraulic jacks on pile/piles with 1.5 times
the design load ……..as per IS-2911 (Part-
4) 1985.
N.B. This item is
On single pile : applicable for
a) both work pile
i) Testing load up to 100 T Each 45000.00 45000.00 and test pile.
ii)Testing load between 100 Tand150 T. Each 55000.00 55000.00 Test should be
iii)Testing load between 150 T and 200 T. Each 80000.00 80000.00 carried out as
iv)Testing load between 200 T and 250 T. Each 100000.00 100000.00 per IS 2911 part
v)Testing load between 250 T and 300 T Each 125000.00 125000.00 IV 1985.
.
b) Deleted

244 66 Deleted

300 32 Providing and applying road markings m2 513.00 513.00


over bituminous surface using hot
applied thermoplastic compound ……
Jalpaiguri / plains of Siliguri
Sub-division / Haldibari P.S.

Darjeeling excluding plains


of Siliguri Sub-division
Coochbehar excluding
24 Parganas (N & S)

Howrah / Hooghli

West Midnapur

N & S Dinajpur
East Midnapur

Haldibari P.S.
Murshidabad
Burdwan

Remarks
Birbhum

Bankura
Kolkata

Maldah
Purulia

Nadia
Page Sl.

Unit
Description of Items
No. No

217 23. First class brick work in


cement sand mortar
..………
(a) In 1 : 3 proportion. m3 5550 5138 4556 4556 5550 5493 5437 4828 5226 5226 5194 5157 5131 5166 6830

(b) In 1 : 4 proportion. m3 5277 4862 4279 4279 5277 5219 5161 4551 4953 4953 4920 4882 4854 4891 6563

(c) In 1 : 6 proportion. m3 4947 4532 3949 3949 4947 4889 4831 4221 4623 4623 4590 4551 4524 4561 6233
291 5 Brick pavement with 1st
class / picked jhama bricks
……….
(a) When laid with a
cushion of sand below
including cost thereof:
(i) One brick flat m2 372 338 294 294 372 366 359 313 349 349 345 340 337 341 475
pavement.

(ii) One brick on m2 553 504 436 436 553 545 538 467 515 515 511 506 503 507 703
edge pavement.

(iii) One brick on m2 563 514 446 446 563 555 548 478 526 526 521 516 513 518 714
edge pavement
laid in herring
bone bond
pattern.

(b) When laid in cement


mortar (1:6) on the under
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012

Jalpaiguri / plains of Siliguri


Sub-division / Haldibari P.S.

Darjeeling excluding plains


of Siliguri Sub-division
Coochbehar excluding
24 Parganas (N & S)

Howrah / Hooghli

West Midnapur

N & S Dinajpur
East Midnapur

Haldibari P.S.
Murshidabad
Burdwan

Remarks
Birbhum

Bankura
Kolkata

Maldah
Purulia

Nadia
Page Sl.

Unit
Description of Items
No. No

side as well.
(i) One brick flat m2 411 376 331 331 411 404 396 351 387 387 383 378 375 379 516
pavement.

(ii) One brick on m2 592 543 475 475 592 585 577 506 555 555 551 545 542 547 745
edge pavement.

(iii) One brick on


edge pavement m2 606 556 488 488 606 598 590 519 568 568 564 559 555 560 759
laid in herring
bone bond
pattern.

Page 7 of 24
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012

All districts of
West Bengal and
Page Item Darjeeling hill
Description of Items Unit Darjeeling plain Remarks
No. No. area
of Siliguri Sub-
division

Section 34 Laying Bituminous Macadam of


4.7 specified grade Hot Mix Plant (HMP)
and using approved aggregates
conforming to specified grading and
bitumen over prepared surface,
including carrying the hot premixed
materials by means of tipper truck,
spreading, the mixed material at
specified laying temperature over the
prepared surface by means of a
suitable paver finisher, tamping and
finishing the mix to specified grade,
line and camber, thorough rolling with
suitable power rollers for break down,
inter-mediate and finished rolling as
per specification, hand packing and
pinning to give an even surface
including cost and carriage of stone
materials & bitumen, and hire
charges of HMP and all other Add cost of
machines and equipments, cost of materials and
fuels and lubricants and wages of carriage as per
operational staff, quality control as consumption chart
per IRC Specification all complete to get the final
excluding cost of applying tack coat. consolidated item
(A) In Profile Corrective Course rate.
using 3.0% binder content by
weight of total mix as per
approved specification,grading
and compacted density of the mix.

(i) Using Batch type HMP of m3 1351.00 1411.00


minimum capacity 100-120
TPH.

(ii) Using Drum mix type HMP m3 1335.70 1395.00


of minimum capacity 60-90
TPH.
m3 1543.00 1613.00
(iii) Using Drum mix type HMP
of minimum capacity 40-60
TPH.

Page 8 of 24
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012

All districts of
West Bengal and
Page Item Darjeeling hill
Description of Items Unit Darjeeling plain Remarks
No. No. area
of Siliguri Sub-
division
Section (B) In Base / Binder Course using
4.7 3.4 % binder content by weight of
total mix as per approved
specification, grading and
compacted density of the mix.

(a) 40mm compacted thickness:

(i) Using Batch Type HMP m2 54.80 57.20


of minimum capacity
100-120 TPH.
(ii) Using Drum mix type m2 53.90 56.30
HMP of minimum
capacity 60-90 TPH.
(iii) Using Drum mix type m2 62.40 65.20
HMP of minimum
capacity 40-60 TPH.

(b) 50mm compacted thickness:

(i) Using Batch Type HMP m2 68.50 71.40


of minimum capacity
100-120 TPH.
(ii) Using Drum mix type m2 67.40 70.30
HMP of minimum
capacity 60-90 TPH.
(iii) Using Drum mix Type m2 78.10 81.50
HMP of minimum
capacity 40-60 TPH.

(c) 75mm compacted thickness:

(i) Using Batch Type HMP m2 102.70 107.20


of minimum capacity
100-120 TPH.
(ii) Using Drum mix type m2 101.10 105.50
HMP of minimum
capacity 60-90 TPH.
(iii) Using Drum mix Type m2 117.10 122.30
HMP of minimum
capacity 40-60 TPH.

Page 9 of 24
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012
All districts of West
Page Item Bengal and Darjeeling hill
Description of Items Unit Remarks
No. No. Darjeeling plain of area
Siliguri Sub-division
Section 35 Laying Dense Bituminous
4.7 Macadam layer (as base / binder
course) by Hot Mix Plant using
coarse aggregate, fine aggregate,
filler and binder as per design Job
Mix Formula, conforming Marshall
Method as per specification, over
prepared surface coated with tack
coat, including screening, cleaning of
chips and preparing a uniform and
quality mix in Hot Mix Plant and
ensuring a homogenous mix, in which
all particles of the mineral aggregates
are coated uniformly, carrying the hot
premixed materials by means of
tipper truck, spreading the mixed
materials at specified laying
temperature over the prepared
surface by means of a suitable paver
finisher, tamping and finishing the mix
to specified grade, line and cross
section, through rolling with suitable
power rollers for break down, inter -
mediate and finished rolling to
achieve the desired density of at least
98% of that of Laboratory Marshall
specimen, hand packing and pinning
to give an even surface including cost
and carriage of bitumen/CRMB,
course and fine aggregates and filler
materials and hire charges of Hot Mix
Plant and all other machines, Add cost of
equipments for construction and materials and
quality control as per IRC carriage as per
specification, fuels, and lubricants consumption
and wages of operational staff chart to get the
complete excluding the cost of final
applying Tack coat. consolidated
item rate.
(a) 50mm compacted thickness:

(i) Using Batch Type HMP of m2 74.90 78.00


minimum capacity 100-120 TPH.

Page 10 of 24
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012
All districts of West
Page Item Bengal and Darjeeling hill
Description of Items Unit Remarks
No. No. Darjeeling plain of area
Siliguri Sub-division
(ii) Using Drum mix type HMP of m2 73.70 76.80
minimum capacity 60-90 TPH.
(iii) Using Drum mix Type HMP of m2 84.90 88.60
minimum capacity 40-60 TPH.

(b) 75mm compacted thickness:

(i) Using Batch Type HMP of minimum m2 112.30 117.00


capacity 100-120 TPH.
(ii) Using Drum mix type HMP of m2 110.60 115.30
minimum capacity 60-90 TPH.
(iii) Using Drum mix Type HMP of m2 127.40 132.90
minimum capacity 40-60 TPH.
Section 36 Providing & laying Semi-dense
4.7 Bituminous Concrete (SDBC) as
wearing coarse by Hot Mix Plant,
using coarse aggregates, fine
aggregates, filler materials and binder
of required specification and grading
as per approved job mix formula, over
thoroughly cleaned surface coated
with tack coat, including screening,
cleaning of aggregates, mixing the
components as per approved Job Mix
Formula with hot binder, carrying the
mixture by tipper truck or any other
approved suitable arrangements,
laying the mixture uniformly,
maintaining the specified laying
temperature, thorough rolling with
power roller with necessary hand
packing and pinning to give an
uniform surface to achieve the Add cost of
desired density of at least 98% of that materials and
of Laboratory Marshall specimen, carriage as per
including the cost and carriage of consumption
aggregates, filler and binder, heating chart to get the
the binder, preheating the final
aggregates, and filler to the specified consolidated
temperature, including the hire item rate.
charges of Hot Mix Plant and other

Page 11 of 24
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012
All districts of
West Bengal
Page Item Darjeeling hill
Description of Items Unit and Darjeeling Remarks
No. No. area
plain of Siliguri
Sub-division
machineries, pay of operators, cost of
fuel and lubricants and all other
incidental charges complete
excluding cost of applying tack coat.

(a) 25mm compacted thickness: 37.50 42.10


(i) Using Batch Type HMP of m2
minimum capacity 100-120 TPH.
(ii)Using Drum mix type HMP of m2 36.80 41.30
minimum capacity 60-90 TPH.
(iii)Using Drum mix Type HMP of m2 42.40 47.70
minimum capacity 40-60 TPH.
(b) 40mm compacted thickness:
(i) Using Batch Type HMP of m2 59.30 66.70
minimum capacity 100-120 TPH.
(ii) Using Drum mix type HMP of m2 58.20 65.40
minimum capacity 60-90 TPH.
(iii) Using Drum mix Type HMP of m2 67.00 75.50
minimum capacity 40-60 TPH.
Section 37 Providing & laying Bituminous
4.7 Concrete (BC) as wearing coarse
by Hot Mix Plant, using coarse
aggregates, fine aggregates, filler
materials and binder of required
specification and grading as per
approved job mix formula, over
thoroughly cleaned surface coated
with tack coat, including screening,
cleaning of aggregates, mixing the
components in required proportion
with hot binder, carrying the
mixture by tipper truck or any other
approved suitable arrangements,
laying the mixture uniformly,
maintaining the specified laying
temperature, thorough rolling with
power roller with necessary hand
packing and pinning to give an
uniform surface to achieve the

Page 12 of 24
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012
All districts of
West Bengal
Page Item Darjeeling hill
Description of Items Unit and Darjeeling Remarks
No. No. area
plain of Siliguri
Sub-division
desired density of at least 98% of that
of Laboratory Marshall specimen,
including the cost and carriage of
aggregates, filler and binder, heating
the binder, preheating the
aggregates, and filler to the specified
temperature, including the hire Add cost of
charges of Hot Mix Plant and other materials and
machineries, pay of operators, cost of carriage as per
fuel and lubricants and all other consumption
incidental charges complete chart to get the
excluding cost of applying tack coat. final
consolidated
(a) 25 mm compacted thickness: item rate.

(i) Using Batch type HMP of m2 38.30 42.90


minimum capacity 100-120
TPH.
(ii) Using Drum mix Type HMP m2 37.60 42.10
of minimum capacity 60-90
TPH.
(iii) Using Drum mix type HMP m2 43.10 48.40
of minimum capacity 40-60
TPH.

(b) 40 mm compacted thickness:

(i) Using Batch type HMP of m2 62.50 69.90


minimum capacity 100-120
TPH.
(ii) Using Drum mix Type HMP m2 61.40 68.60
of minimum capacity 60-90
TPH.
(iii) Using Drum mix type HMP m2 70.20 78.70
of minimum capacity 40-60
TPH.

Page 13 of 24
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012

All districts of
West Bengal
Page Item Darjeeling hill
Description of Items Unit and Darjeeling Remarks
No. No. area
plain of Siliguri
Sub-division
Sectio 38 Providing & Laying 20 mm thick
n 4.7 open graded Premixed Carpet by
Hot Mix Plant using 13.2 mm (@
0.18 m3/m2) and 11.2 mm (@ 0.09
m3/m2) size stone aggregates,
including thorough cleaning of the
surface, applying tack coat, screening
cleaning and pre-heating stone chips
and fully pre-coating the same with
hot matrix @ 54 kg/m3 of aggregate
mix, carrying the mixture by tipper
trucks or by any other suitable
arrangements, laying the mixture
uniformly over the surface with paver
finisher, including manual operations
as and when required for proper
level, grade and camber, thoroughly
rolling by power roller, including the
cost and carriage of stone chips and
matrix, heating the matrix, preheating
the aggregates to required
temperature and including the hire
charges of Hot Mix Plant and other
machineries, pay of operators, cost of
fuel and lubricants etc. all complete
excluding cost of applying tack coat.

(i)Using Batch type HMP of minimum m2 Add cost of


capacity 100-120 TPH. 19.30 20.10
materials and
(ii)Using Drum mix type HMP of carriage as per
m2 18.80 19.60
minimum capacity 60-90 TPH. consumption
(iii)Using Drum mix type HMP of chart to get the
m2 21.50 22.40
minimum capacity 40-60 TPH. final consolidated
item rate.
Sectio 39 Providing & Laying 20 mm thick Mix
n 4.7 Seal Surfacing (MSS) by Hot Mix
Plant using 0.27 m3 of approved
variety mineral aggregates (coarse
and fine) per 10 m2 of surface as per
specification and approved job mix
formula, over thoroughly cleaned
surface coated with tack coat,

Page 14 of 24
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012
including screening and cleaning the
aggregates as necessary, preheating,
pre-coating the same in Hot Mix Plant
with hot matrix, carrying the mixture
by tipper trucks or any other suitable
arrangements, laying premixed
materials uniformly with paver
finisher, including manual operations
as and when required, compacting
with power roller including the cost
and carriage of aggregates and
matrix, cost for heating the matrix and
aggregates, including hire charges of
Hot Mix Plant and other machineries,
pay of operators, cost of fuel and
lubricants etc. including all incidental
charges complete excluding cost of
applying Tack coat.
(a) Type – A : Using 2.2 kg
bitumen per square meter.

(i) Using Batch type HMP of m2 26.50 29.20 Add cost of


minimum capacity 100-120 materials and
TPH. carriage as per
(ii) Using Drum mix type HMP m2 26.90 29.30 consumption
of minimum capacity 60-90 chart to get the
TPH. final consolidated
(iii) Using Drum mix type HMP m2 31.20 34.10 item rate.
of minimum capacity 40-60
TPH.

(b) Type – B : Using 1.9 kg


bitumen per square meter.

(i) Using Batch type HMP of m2 26.00 28.70


minimum capacity 100-120
TPH.
(ii) Using Drum mix type HMP m2 26.30 28.80
of minimum capacity 60-90
TPH
(iii) Using Drum mix type HMP m2 30.70 33.50
of minimum capacity 40-60
TPH.

Page 15 of 24
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012

B. ADDENDA OF SCHEDULE OF RATES OF P. W. (ROADS) DIRECTORATE – 2008-09 :

4.11 GEOSYNTHETICS AND REINFORCED EARTH

All districts of
West Bengal and
Page Item Darjeeling hill
Description of Items Unit Darjeeling plain Remarks
No. No. area
of Siliguri Sub-
division
Section 1 Narrow Filter Sub-Surface Drain : RM 260.00 268.00
4.11 Construction of a narrow filter sub-
surface drain consisting of porous or
perforated pipe laid in narrow trench
surrounded by a geotextile filter fabric,
with a minimum of 450 mm overlap of
fabric and installed as per clause 702.3
and 309.3.5 of MoRTH Specifications
for Road & Bridge Works including
excavation and backfilling & removal of
excess earth. Using geosynthetic pipe
of 150 mm dia.
Section 2 Laying Paving Fabric Beneath a m2 104.00 105.00
4.11 Pavement Overlay :
Providing and laying paving fabric with
physical requirements as per table 704-
2 of MoRTH Specifications for Road &
Bridge Works over a tack coat of paving
grade Bitumen 80-100 penetration, laid
at the rate of 1 kg per sqm over
thoroughly cleaned and repaired
surface to provide a water resistant
membrane and crack retarding layer.
Paving fabric to be free of wrinkling and
folding and to be laid before cooling of
tack coat, brooming and rolling of
surface with pneumatic roller to
maximise paving fabric contact with
pavement surface.

Page 16 of 24
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012

All districts of
West Bengal and
Page Item Darjeeling hill
Description of Items Unit Darjeeling plain Remarks
No. No. area
of Siliguri Sub-
division
Section 3 Laying Boulder Apron in Crates of m3 730.00 737.00
4.11 Synthetic Geogrids: Providing, Note:
preparing and laying of geogrid crated Construction
apron 1 m x 5 m, 600 mm thick wing shall
including excavation and backfilling with add cost of
baffles at 1 metre interval, made with 1.15 cum
Stones with
geogrids having characteristics as per
minimum size
clause 704.2 of MoRTH Specifications of 200 mm &
for Road & Bridge Works, joining sides 0.15 cum of
with connectors/ring staples, top Stones spall
corners to be tie tensioned, placing of for filling
suitable cross interval ties in layers of voids to
300 mm connecting opposite side with arrive at the
lateral braces and tied with polymer consolidated
braids to avoid bulging, constructed as rate.
per clause 704.3 of MoRTH
Specification. filled with stone with
minimum size of 200 mm and specific
gravity not less than 2.65, packed with
stone spalls, keyed to the foundation
recess in case of sloping ground and
laid over a layer of geotextile to prevent
migration of fines, all as per clause 704
and laid as per clause 2503.3 of
MoRTH Specifications for Road &
Bridge Works and approved design.

Page 17 of 24
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012

All districts of West


Page Item Bengal and Darjeeling
No. No.
Description of Items Unit
plain of Siliguri Sub-
Darjeeling hill area Remarks
division

Section 4 Reinforced Earth Structures :


4.11
Reinforced earth Structures have four
main components as under:

a) Excavation for foundation (to be cum 45.00 48.00


executed as per Item No. 1, Page
203 of Departmental Schedule of
Rates).
b) Foundation concrete and cement cum
concrete grooved seating in the
foundation for facing elements (to be
executed as per Item No. 32 (b) / (c)
/ (d) / (e), Page 222 & 223 of
Departmental Schedule of Rates
and in accordance with the
approved design & drawing).
c) Providing, carriage, hoisting and Sqm 1345.00 1478.00
placement of Facia element (180
mm thick) of RCC (M35) with
dimension and reinforcement as per
provision of clause 703.4 of MORTH
Specifications for Road & Bridge
Works inclusive of reinforcement,
shuttering, curing, transporting,
placing, fixing all complete.
d) Providing assembling, joining with
facing elements and laying of the
reinforcing elements as per
provision of Clause 703.4 of
MORT&H Specification.

I. With reinforcing element of M 568.00 569.00


Galvanised carbon steel strips
of 60 mm wide and 5 mm thick
as per clause 3102 of MORTH
Specifications for Road &
Bridge Works and as per
approved design and
specifications.
II. With reinforcing elements of Sqm 104.00 104.00
synthetic geogrids as per
clause 3102.8 and approved
design and specifications.

Page 18 of 24
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012

All districts of West


Page Item Bengal and Darjeeling hill
Description of Items Unit Remarks
No. No. Darjeeling plain of area
Siliguri Sub-division
e) Earth fill with granular material cum (Rate to be
which is to be retained by the wall. taken from
Granular material will be as per Item No. 7,
Clause 3103 and placement & Page 193 of
compaction as per clause 3105.5 of Departmental
MORTH Specifications for Road & Schedule of
Bridge Works. Rates.)

Notes :

1. Construction wing should add the cost of Drainage arrangement including filter media as per approved design and drawings.
2. The specification and construction details to be adopted shall be as per section 3100 of MoRTH Specification.
3. Length of reinforcing strips will vary with the height of wall and will be as per approved design and drawings.
4. The type of reinforcing elements to be adopted shall be as per approved design and specifications.
5. The rate provided is for estimation purpose only, the actual market rate for supply of reinforcing elements and their accessories
are to be ascertained from reputed firms in the field of earth reinforcement.
6. The earth fill material shall be clean, free draining, granular with high friction and low cohesion, non-corrosive, coarse grained with
not 10 per cent of particles passing 75 micron sieve, free of any deleterious matter, chlorides, salts, acids, alkalies, mineral oil,
fungus and microbes and shall be of specified PH value.
7. Capping beam is to be priced separately as per approved design. The rate for cement concrete shall be taken from section 4.4 of
Departmental Schedule of Rates.

Superintending Engineer
Bridge Planning Circle
P.W.(Roads)Directorate

Page 19 of 24
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012
All districts of
West Bengal and
Page Item
Description of Items Unit Darjeeling plain Darjeeling hill area Remarks
No. No.
of Siliguri Sub-
division

Section 30 Construction of Sub-base using m³ 369.00 369.00


4.1 lime - fly ash admixture with Initial lead of
granular soil, free from organic 1 Km. for soil
matter/ deleterious material or and fly ash
clayey silts and low plasticity has been
clays having PI between 5 and 20 considered.
and liquid limit less than 25 and
commercial dry lime, slaked at Construction
wing should
site or pre-slaked with CaO
add cost of
content not less than 50 per cent, extra carriage
Flyash to conform to gradation as beyond 1 Km
per clause 4.3 of IRC: 88-1984, from source
lime + Flyash content ranging to work site
between 10 to 30 per cent, the both for soil
minimum un-confined and fly ash as
compressive strength and CBR per actual
value after 28 days curing and 4 lead.
days soaking to be 7.5kg/sq, cm
and 25 per cent respectively, all
as specified in IRC: 88-1984.

Note :
1. In case earth is not available
from Govt. land,
compensation for earth will
be required. The position is
required to be clearly stated
and considered in the cost
estimate.
2. Cost of Flyash has not been
considered as same will be
available free of cost. Only
carriage of Flyash has been
provided.
3. Lime + Flyash has been taken
as 20 per cent of total mass
and ratio of lime and Flyash
as 1:4 for estimating
purposes. Total quantities
will be as per approved
design.

Page 20 of 24
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012
All districts of West
Page Item Bengal and Darjeeling Darjeeling hill
Description of Items Unit Remarks
No. No. plain of Siliguri Sub- area
division
Section
4.4 116 Construction of Temporary Island
upto 1.25 m height by sand / dry Note :
soil filled cement / polytheline
bags and removal of the same It is assumed
after main construction activity. that earth will
be available
(i) Area of Island between 100 m² to Each 15645.00 15983.00 within the
120 m² working
space of
(ii) Area of Island between 120 m² to Each 17871.00 18280.00 crane with
140 m² grab bucket.
(iii) Area of Island between 140 m² to Each 20232.00 20719.00
160 m²

117 Construction of Temporary Island


by construction of outer annular
layer with two rows of bullahs,
suitable spaced, of dia not less
than 150 mm, driven atleast half of
the total length, properly tied,
braced and supported and filling
the annular space with sand / soil
filled bags, protected by drum
sheet walling on both side and
filling the core portion with localy
available materials including the
dismantling, removing and
cleaning the site of the
construction of main component of
the structure.

(i) Area of Island between 100 m² to


120 m²

a) Height above bed level upto Each 187307.00 189862.00


2.25 m.

b) Height above bed level upto Each 265432.00 269186.00


3.25 m.

c) Height above bed level upto Each 341346.00 346169.00


4.25 m.

Page 21 of 24
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012
All districts of
West Bengal and
Page Item
Description of Items Unit Darjeeling plain Darjeeling hill area Remarks
No. No.
of Siliguri Sub-
division

(ii) Area of Island between 120 m² to


140 m²

a) Height above bed level upto Each 207367.00 210286.00


2.25 m.

b) Height above bed level upto Each 291187.00 295341.00


3.25 m.

c) Height above bed level upto


Each 375002.00 380390.00
4.25 m.

(iii) Area of Island between 140 m² to


160 m²

a)Height above bed level upto Each 225550.00 228767.00


2.25 m.

b) Height above bed level upto Each 316663.00 321241.00


3.25 m.

c) Height above bed level upto Each 407782.00 413721.00


4.25 m.

118 Providing and constructing m 1295.00 1319.00


service road of width 4 m to
reach island location from one pier
location to another pier location
with height upto 1 m.
Performing Laboratory Test of
California Bearing Ratio on
Disturbed /Remoulded soil
Section 15
samples as per IS 2720,Part
4.3 D
XVI
i) Un soaked Each 1380.00 1500.00
ii) soaked Each 1740.00 1900.00
Providing and applying retro
Section
36 reflective road marking paint m2 361.00 361.00
4.8
(cold applied).

Page 22 of 24
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012
All districts of
West Bengal
and
Item Darjeeling
Page No. Description of Items Unit Darjeeling Remarks
No. hill area
plain of
Siliguri Sub-
division

Section 4.7 18A Providing and laying Premixed Seal Coat m2 Note: Add cost of
(Type C) with approved quality stone chips materials and
and hot bitumen binder @ 6.5 kg per 10 carriage as per
sqm on thoroughly cleaned black top specification to
surface coated with tack coat including get the final
heating & mixing cleaned stone aggregates consolidated item
using 0.09 m³/10 m² of 5.6 mm size (100% rate.
passing through 9.5 mm sieve and retained
on 2.36 mm sieve) in suitable pan / Mixer
Machine / Mobile Hot Mix Plant (Light duty),
laying and spreading the mix at an uniform
rate using suitable means, brushing the
surface, if necessary, to ensure uniformity,
followed by rolling with power roller
including the cost and carriage of binder
and aggregates, cost of heating the binder
and aggregates and all other incidental
charges, cost of fuel and lubricants,
including hire charges of machineries, tools
& plants required for construction and
quality control complete. excluding cost of
applying tack coat.

(a) Using suitable mixing pan / Mixture


9.90 10.30
Machine
(b) Using Mobile Hot Mix Plant (Light duty) 12.80 14.40

Superintending Engineer
Bridge Planning Circle
P.W.(Roads)Directorate

Page 23 of 24
7th Corrigenda , Addenda & Errata of SOR of
P.W. (Roads) Directorate 2008 – 2009
April, 2012

C. ERRATA OF SCHEDULE OF RATES OF P. W. (ROADS) DIRECTORATE – 2008-09 :

Page Item Description of Unit


In place of Read as Remarks
No. No. Items
Rate of All Darjeeling hill Rate of All Darjeeling hill
259 5(b)
districts of area districts of area
W.B.and W.B.and
Coarse Graded
Darjeeling Darjeeling
GSB
plain of Siliguri plain of
Sub-division Siliguri Sub-
division
Grading-I m3 258.40 258.70 127.10 127.40
(i)
Grading-II m3 256.30 256.50 125.00 125.20
(ii)
Grading-III m3 224.80 225.10 122.20 122.50
(iii)

Superintending Engineer
Bridge Planning Circle
P.W.(Roads)Directorate

Page 24 of 24