SUROJ BUILDCON PVT. LTD.

JOB SAFETY ANALYSIS


PROJECT: Mars, wargal, Telangana. Rev 01
JSA NO.- 46 ACTIVITY NAME : Night Shift Work DATE:05/02/2022
Date:05-02-2022
Sr.
Sequence of Job / Job Steps Potential Hazard Recommended Control Measures Responsibility
No.
1.Ensure thermal screening is done for all at site enterance and the same is recorded

2.Ensure COVID decleration is done by all enterying into the site.


1 COVID-19 Infections 3.Ensure people with symptoms are not allowd to enter the site. All

4.Ensure vaccination data record is maintained and updated on


regular basics.
Mobilization of Manpower & Materials 1. Non compliance of legal requirement 1. Ensure all workforce5.Ensure
undergoneall medical
vehicles fitness
are sanitized priorESI,
certificate, to site entry.
Gov. ID proof and age
2. Physically unfit verification as per MARS manual/Factories act.
3. Without Inducted work force 6.Ensure all comply with the COVID-19 guidelines.
2. Ensure all workforce and operators are following in security check post in project entrance as
4. Untrained operators a precautionary measure of COVID-19.
5. Non compliance of PPE 3. Ensure all work force and operators are checked by breath analyser for any alcohol
6. Alcohol consumption or drug addiction consumption.
workforce and operators 4. Ensure all vehicles having valid documents (RC/FC, Insurance, emission, DL, TPI etc.)
7. Damaged materials or components 5. Ensure all workforce are undergone safety induction training
2 6. Ensure all operators are gone through DDS training. Site PM/Engineer
7. Ensure all workforce and operators are compliance with job specific PPE (safety helmet,
jacket, safety shoe etc.)
8. Ensure vehicles pre-inspection done prior entry at site.
9. Ensure Flagman deployed to escort trucks/dumpers.
Laying of cable and fitting of Electrical Light 1.electrical short circuit. 2.Fire hazard. 1. Proper permit shall be taken prior to start the work. 2.Cable
3.Burn Injuries,Arc Flashes laying should be overhead in construction work area where pedestrain movement area and
above 6metre in vehicle movement area
3. All joints should be( Only Industrial sockets to be used at site for
extension purpose and no bare cable joint s are allowed at site.) Male female socket nature.

4. Adequate and reflective sign boards must be displayde,Warning sign should


placed
5. Ensure lock out system.
6. Use proper & apropriate
handgloves(Rubber hand gloves for electical purpose and 11KV for HT lines), & must wear ppes
as per work requirement.
7. Use danger & warning boards near panel boards.
8. Only authorised person shall work.
3 9.Only authorised Site PM/Engineer
person shall work. 10. Use
standard tools & equipment for electrical work. 11.All electrical
connections shall be made by qualified electrician 12.
Panel boards shall have ELCB and rubber mat must be placed infront of All DB's.

13.Height work permit must be


obtained if required and electrical and LOTO permit must be in Place.
14. Proper access to
work place to be provided. 15.
No flammable material to be Kept near the light such as plastic cover, fuel lines.

16.Ensure competant electrician contact


number is displayed with photo.

17.Ensure maintance procedures are displayed near the DB.


1. Slippery surface,Slip Trip and Fall 1.Errect proper scaffold on levelled base with top rail ,mid rail and and access lader and
2. Uneven ground condition 18.Ensure Fire extinguisher is available at electrical DB.
platform.
3. Lack of illumination 2. Proper access to work place to be provided.
3. Work area shall keep clean and tidy
4. Use proper P P E as per work requirement.
5. No flammable material to be near the light such as plastic cover,
fuel lines.

6. Ensure only competant scaffolders are only deployed in errection and


dismantalling of scaffolding.
7.Ensure work is carried only after reciving the work permit.
4 Scaffolding work during night Site PM/Engineer
8.Esure all operatives who are involved are using SRL fullbody harness while
errecting or dismantling the scaffolding.
9.Ensure adequate anchorage point is made available
for anchoraging the full body harness.
10.Ensure the area is barricated and adequate sign board
are displayed.
11.Ensure spotter is made available while the activity is in progress.

12.Ensure supervision.

13.Ensure housekeeping.
1. Slippery surface,Slip Trip and Fall 1. Dedicated route demarcation for pedestrian and vehicle movement.
2. Uneven ground condition
3. Open pit or trench on access way 2. Restrict Speed limit 15KM/H for vehicles at site.
4. Adjacent structure/Obstruction 3. Ensure barrication for demarcation and signages in pedestrian and vehicles movement area.
6. Sharp object on access way 4. Entry of pedestrian in vehicle access is strictly prohibited.
7. Over head power lines 5. Ensure there is no overhead powerlines or dangling powerlines on ground which could
8. Lack of illumination hindrance for pedestrian and vehicle movement.
9. Lack of signages(speed limit) 6. Ensure sufficient illumination in pedestrian and vehicle movement access way and welfare
areas.
7. Ensure there is no sharp objects and slippery condition on pedestrian and vehicle access way.
8. Ensure there is no open pit and trench on vehicle and pedestrian access way.
10. Ensure the access way shouldn't block without making alternate way.

11.Ensure warning sign are displayed.(Eg:Pedisterian movement,Speed limit,Vehicle


5 Worker Movement in Night Shift movement,etc) Site PM/Engineer
12.Ensure the workers are aware of the pedestrain access.

13.Ensure vehicle movement is controlled by banksman.

14.Ensure signal batton lights are made availabe to signal man for night works.

15.Ensure all crew involved in night shift must use hi-Viz jackets with reflective tapes.

16.Ensure supervision.

17.Illumination levels must be checked at regular intervals and record must be


maintained.

1.) Fall of concrete pipe, 2.) 1.Ensure adeqaute access/egress to work location.
Fall of person Injury to
Person, Property damage 2.Ensure sufficient illumination is maintained at work location and
3) Improper usage of access egress area. 3. Only trained
hand tools 4.) slip /trip & persons allow for erection of pipeline work. 4. Provide close
fall 5.) Concrete supervision during the work.
may come in contact with Skin & eye 5. Provide & ensure use of PPE’s like safety helmet, safety shoes, safety belt,jacket,face
sheild,goggles,ear plugs.
6. Area should barricade.
7. Provide & ensure use of rope for lifting & lowering pipe.
8. Provide proper working platform.
9. Pipe line should be inspected for proper fixing before taking in to use.

10.Pipe SupportsIPipe line stands) must be placed.

11.Ensure the pipe line


6 Concerete work during Night pipes are stacked properly and housekeeping is a maintained.

13.Ensure all people involved in pipe line work are aware of the risks
involved in the activity.
14.Ensure TBT is conducted prior to start of
activity.
15.provide sufficient manpower as per safe lifting
limits.
16.Avoid saging & provide proper manpower to give support.
17.Provide close supervision.
18.In case of spillage of concrete ensure the it is removed at the same time.
19. Ensure the concrete pumps complies
with HSE Prerequestie checklist.

20.Ensure the operator is competent.


21.Ensure the temporary lighting
arrangement is made on the opposite side of the access egress to work location.
1. Improper access at work area 1. TBT should be conducted before start work.
2 Slip, trip & 2. Provide proper access to reach at work area.
3. Access should be free from obstacles.
fall of person 3. 4. Ensure proper illumination during night.
Unauthorized entry at work area 5. Work permit should be taken from client prior to start the work.
4. Hit by 1. Area should inspect & clear for utilities before start the excavation.
rotating part of excavator 6. Provide & ensure use of PPE’s like safety shoes, safety helmet & Safety Jacket.
5. Movement of 7. Prior to excavation the area must be barricaded and adequate sign boards must be
displayed.
Excavator & Vehicles - hit by 8. Display the precautionary SIGN boards.
vehicle, 6. Toppling of 9. Close supervision should be provided during Night work.
vehicle 10. Provide signal man to control the Vehicles.
11. Only license driver operate the vehicles.
12. All excavator & vehicles should have valid documents.
13. Vehicle should have reverse horn.
Exctavation and Back filling work 14. Follow traffic rules & display speed limit boards.
7 15. Don’t allow workers to seat below the vehicles. Site PM/Engineer
during night
16. Provide proper illumination during the night.

17.Ensure reflective sign boards are placed.

18.Ensure flagmans are deployed at various locations to control vehicle and pedestrain
movements along the designated vehile movement area.
19.Ensure vigilient supervision.

20.Ensure the team involved is aware of the emergency


procedures.

.1. Slippery surface,Slip Trip and 1. Provide & ensure use of hand gloves(Cut resistant), shoulder pad,Safety Shoes,Safety
Fall Helmets,Hi Viz Jacket.
2. TBT should be conducted before start the work. 3.Sharp
2. Uneven ground condition edges must be protected.
3. Open pit or trench on access 4. Ensure materials are stacked properely.
way 5.Ensure housekeeping.
4. Adjacent structure/Obstruction
6. Sharp object on access way 6. Provide close supervision during Night work.
7. Lack of illumination 7. Provide proper access during the work.
8. Lack of signages(speed limit) 8. Access should be from obstacles.
9. Provide proper illumination at work location.
5 Ensure materails are stacked properley and secured.
7.Ensure House keeping is maintained at work location during and after the work activity.
8 Shuttering work at night shift Site PM/Engineer
8.Ensure the walkway to rest area and drinking water facility is illluminated.

9.Ensure no workers to move around in dark areas.

10.Dedicated Banks man to be deployed when vehicle movement is in or near to work area.

11.Ensure the temporary lighting arrangement is made on the opposite side of the access
egress to work location.
1. Hit by vehicles 1. Ensure Job specific PPE(safety helmet, safety vest, hand gloves, safety shoe etc.)
2.Improper access at work area – 2. Ensure trained flagman deployed to escort vehicle at site
3. Follow 15KMPH speed limit at site(strictly)
3. Slip, trip & fall of person 4. 4. Don't horseplay(no over speed, no over turn) during driving vehicles at site
Unauthorized entry at work area - 5. Ensure flagman to escort transit mixers/trucks to prevent unauthorised entry on vehicle
5 movement way.
5.Vehicles - hit by vehicle, Toppling 6. Ensure vehicles are parked in designated place. No blocking access way.
of vehicle 7. Use wheel stopper after parking vehicle in designated area.
8. Ensure hand brake pulled while parking.
9. Ensure driver don't leave key on vehicle while leave driving seat.
10. Ensure vehicle lights are switched on during work in night.
11. Ensure sufficient illumination in workplace in case of night work.
12. Ensure good supervision. Site Engineer/Superviosr/
9 Vehicle Movement in Night Shift
13.Ensure adequate warning signages are displayed. Banksman

14.Ensure blinkers are placed for excavtion near the access area.

15.Ensure the drivers are aware of the site routes and emergency procedures.

16.Ensure all drivers comply with site mandatory PPE's.

1. Fall hazards. 1. Night work permit to be taken from concern.


2.Improper access at work area – 2. Ensure proper illumination during dark hours.
3. Route shall be sufficiently illuminated and must be addresed to the
3. Slip, trip & fall of person 4. workers in TBT.
Unauthorized entry at work 4.Ensure the workers do not move in dark areas.
10 Work during dark hours Site Engineer/Superviosr
5.Ensure the rest areas are adequately illuminated.

6.Ensure drinking water is available at work location.

7.Ensure housekeeping.
1. Improper Access. 1. Ensure all are follow site layout plan for safe access 8.Ensure supervision.
2.Slip, trip & fall of person 2.for workers and staff seprate Dinning hall availble with drinking water facility,
illumanation.
3. all food waste kept in dust bin.
4. Toilet availble with illumanation
5. Area illumanation availble and ensure the walk way is adequately illuminated.
11 Welfare Facility HR
6.Ensure all workers take rest in designated location only.

7.Drinking water to be made availabe at work location to prevent movement of workers in


night.
8.Ensure vigilint supervision.
Emergency Procedures 5. Improper housekeeping . 1. Ensure all are follow site emergency layout plan
2. Trainings has to be done to all workers and staff how to act an emergency situation
3. Do not panic
4. Immediate inform to concern site supervisor and in charges in case of emergency
5. Follow emergency routes& signage’s to reach assembly point
6. Rising emergency alarm therefore given alert to everyone.
7. Ensure all access and egress without any obstructions
12 8. Maintained adequate illumination levels at work place and pedistrains access areas. All
9.
Emergency Vehicle availble at site.
10. Emergency contact numbers have been displayed in all levels (Fire/Ambulance/Police etc…).