SUROJ BUILDCON PVT.

LTD
JOB SAFETY ANALYSIS
PROJECT: MARS, VARGAL, Telangana.
JSA NO.- 04 ACTIVITY NAME : UNLOADING OF MATERIAL
Sr. ACTIVITY HAZARD RISK INVOLVED
No

1 COVID-19 Virus infection Infections

1. Non compliance of 1. Non compliance of PPE


legal requirement 2. Alcohol consumption or
2. Physically unfit drug addiction workforce and
3. Without Inducted work operators
force 3. Damaged materials or
4. Untrained operators components

Mobilization of
2 Manpower &
Materials

Improper access -Fall of Injury to person, Property


person, Toppling of damage.
Vehicle

Improper working Injuries to person & damage of


platform -Fall of person, materials.
Fall of material

Unloading of
3 material at Stock
Sharp edges, Caught in serious cut Injury to Person
between material

Unloading of Inadequate manpower Health issue,injury to person


3 material at Stock -Fall of material/overload
yard by Vehicle to person

Unauthorized entry of Injury to person


person - Struck by
Vehicle

Overloading of material , Property damage,


Improper stacking of Injury to person
material ,Fall of material ,
hit to
person

Steel Collision, Property damage,


(Reinforcemet) Suspended load
offload by Hydra mechanically failure
from trailer to Topple
stacking yard Overhead power lines
Adjacent structure
Insufficient illumination
Personnel injuries Injury to
Defective tools and person
tackles
Electrocution
Unskilled or untrained
crew team
Horseplay

4
Emergency 1. Slip/Trip 1.Improper Access
Procedures 2. Hit by vehicles. 2.Improper housekeeping .
3. Fall hazards

Prepared By Reviewed By
SUROJ BUILDCON PVT. LTD.
JOB SAFETY ANALYSIS
ROJECT: MARS, VARGAL, Telangana. Rev :-01
ACTIVITY NAME : UNLOADING OF MATERIAL DATE:24/01/2022

CONTROL MEASURES RESPONSIBILITY REMARKS


1.Ensure thermal screening is done for all at site enterance.

2.Ensure
COVID decleration is done by all enterying into the site.

3.Ensure people with


symptoms are not allowd to enter the site. All
4.Ensure vaccination data
record is maintained and updated on regular basics.

5.Ensure all vehicles are sanitized prior to site


entry.
1. Ensureall
6.Ensure allcomply
workforce
withundergone medical
the COVID-19 fitness certificate, ESI,
guidelines.
Gov. ID proof and age verification as per MARS manual/Factories
act.
2. Ensure all workforce and operators are following in security
check post in project entrance as a precautionary measure of
COVID-19.
3. Ensure all work force and operators are checked by breath
analyser for any alcohol consumption.
4. Ensure all vehicles having valid documents (RC/FC, Insurance,
emission, DL, TPI etc.)
5. Ensure all workforce are undergone safety induction training
6. Ensure all operators are gone through DDS training.
7. Ensure all workforce and operators are compliance with job Site PM/Engineer
specific PPE (safety helmet, jacket, safety shoe etc.)
8. Ensure vehicles pre-inspection done prior entry at site.
9. Ensure Flagman deployed to escort trucks/dumpers.

1. Only licenses operator should operate vehicle.


2. Provide proper access. Site Engineer/ Site
3. Access should be free from obstacles. Supervisor/store in
charge

1. Provide proper working platform.


2. TBT should be conducted for material handling.
3. Provide close supervision during work. Site Engineer/ Site
Supervisor
1. Provide close supervision during work.
2. Provide & ensure use of safety shoes, hand gloves. Site Engineer/ Site
Supervisor

1.provide sufficient manpower as per safe lifting limits.


2.Avoid saging & provide proper manpower to give support.
3.Provide close supervision Site Engineer/ Site
Supervisor

1. Area should be barricaded.


2. Restrict unauthorized entry.
3. Ensure reverse horn while reversing vehicle. Site Engineer/ Site
4. Don’t allow to seat person below the vehicle. Supervisor

1. Material not to be exceed safe working load of the vehicle.


2. Ensure proper stacking of material.
3. Material should not come out of body of Vehicle. Site Engineer/ Site
4. Material should tie securely Supervisor/store in
charge

Follow permit to work system (Lifting and general)


Ensure deployed competent persons for this activity
Ensure 100% PPE compliance
Ensure the area is cordoned off with barrication and signage's
Ensure job specific training conducted prior start of the activity.
Ensure inspection done of all lifting tools and tackles prior start of
the operation.
Ensure there is no man movement below suspended load.
Ensure there is no obstruction of adjacent structure or tree
brunches for lifting operation.
Ensure crane has been inspected as per checklist prior lifting
operation.
Ensure there are no overhead power lines in lifting area else
maintain minimum 2m. away from overhead power lines.
Ensure the ground level is even and compacted for crane set up.
Ensure there is no hidden trench or pit in location of crane set up.
Ensure signal man/flag man provided during lifting operation. Site Engineer/ Site
Ensure prior lifting the weight has been judged. Supervisor
Ensure two guide rope fixed with load to control suspended load
during lifting operation.
1. Ensure all are follow site emergency layout plan
2. Trainings has to be done to all workers and staff how to act an
emergency situation
3. Do not panic
4. Immediate inform to concern site supervisor and in charges in
case of emergency
5. Follow emergency routes& signage’s to reach assembly point
6. Rising emergency alarm therefore given alert to everyone.
7. Ensure all access and egress without any obstructions
8. Maintained adequate illumination levels at work place and All
pedistrains access areas.
9. Emergency contact numbers have been displayed in all levels
(Fire/Ambulance/Police etc…).

Reviewed By Approved By