T7- MASJID EARTHWORK 260820

OSHA

Code Description Quantity UOM Rate SubTotal Factor Total Total

BILL NO. 2 : TRAFFIC MANAGEMENT AND SIGNAGE


TRAFFIC MANAGEMENT & SIGNAGE
Provision and maintenance of adequate safety, traffic a Item 5,000.00 5,000.00
Provide and maintenance of adequate safety, traffic and warning signs and warning lights as stipulated in JKR Specification For Occupational Safety An
Road Works (T.1) 2 no 250.00 500.00 500.00
Awas (T.2) 4 no 250.00 1,000.00 1,000.00
Advance Warning Sign 2 no 250.00 500.00 500.00
Flagman during construction ( 20 weeks) 2 no 10,800.00 21,600.00 21,600.00
Provision and maintenance of traffic control and signage Item 1,500.00 1,500.00
TOTAL BILL NO. 2 : TRAFFIC MANAGEMENT AND SIGNAGE 30,100.00 30,100.00

TOTAL FOR BUILDING 30,100


cation For Occupational Safety And Health For Engineering Construction Works.
T7- MASJID EARTHWORK 260820
ANGGARAN JABATAN 1 of 5 2 of 5 3 of 5 4 of 5 5 of 5
Code Description Quantity UOM Rate SubTotal Rate SubTotal Rate SubTotal Rate SubTotal Rate SubTotal Rate SubTotal

BILL NO. 2 : TRAFFIC MANAGEMENT


AND SIGNAGE
TRAFFIC MANAGEMENT & SIGNAGE

Provision and maintenance of adequate


safety, traffic and warning signs and
warning lights as stipulated in JKR
Specification For Occupational Safety And
Item 5000.00 13,750.00 10,000.00 10,000.00 5,000.00
Health For Engineering Construction
Works for( 20 weeks) Refer to Drawing
Engineer Drawing No:
ATZ2019/MBRP/EW/SD/04

Provide and maintenance of adequate


safety, traffic and warning signs and
warning lights as stipulated in JKR
Specification For Occupational Safety And
Health For Engineering Construction
Works.

Road Works (T.1) 2 no 250.00 500.00 400.00 800.00 550.00 1,100.00 150.00 300.00 550.00 1,100.00 500.00 1,000.00
Awas (T.2) 4 no 250.00 1,000.00 400.00 1,600.00 550.00 2,200.00 150.00 600.00 550.00 2,200.00 500.00 2,000.00
Advance Warning Sign 2 no 250.00 500.00 400.00 800.00 550.00 1,100.00 250.00 500.00 550.00 1,100.00 500.00 1,000.00
Flagman during construction ( 20 weeks) 2 no 10,800.00 21,600.00 15,000.00 30,000.00 6,600.00 13,200.00 10,000.00 20,000.00 7,880.00 15,760.00 5,500.00 11,000.00

Provision and maintenance of traffic


control and signage by competent persons
where site is in close proximity of public
road including provision of flagmen for 20 11,065 Item 1,500.00 5,000.00 18,000.00 5,000.00
weeks as stipulated in JKR Specification
For Occupational Safety And Health For
Engineering Construction Works.

TOTAL 30,100.00 33,200.00 31,350.00 36,400.00 48,160.00 25,000.00