2019 Indicator Reference For PCMs

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

DEPARTMENT OF THE INTERIOR AND LOCAL GOVERNMENT

2019 PEACE AND ORDER COUNCIL (POC) PERFORMANCE AUDIT


Guidelines Form 4 (Indicator Reference for PCMs)

INDICATOR REFERENCE FOR PROVINCES, CITIES, AND MUNICIPALITIES

MEANS OF
INDICATORS PARAMETERS POINT SYSTEM REMARKS
VERIFICATION

PILLAR 1 – ORGANIZATION (10%)


1. Organization / a. Conformed to the prescribed members of 1. Executive Order (EO) / Local 5 – Complete Submit all required documents
Creation of the POC Executive Order No. 773, series of 2009: Ordinance on the 0 – Incomplete If one (1) document contains all the parameters, then it
reorganization of the POC shall be considered complied.
Members:
All members of the council must be completely indicated
• Chair – Governor/Mayor in the Executive Order or in the POC Resolution.
• V-Chair – Vice-Governor/ Vice-Mayor
or
• Sangguniang The CSOs shall be appointed by the Chairperson. In the
Panlalawigan/Panlungsod/Pambayan case of Province, it shall have the approval of the
(Committee Chair on Peace and Order Commander of the Infantry Division and RD of PNP; in
and Public Safety) the case of City/Municipality, the representatives shall
• Three (3) representatives from Civil have “appropriate security clearances of the
Society Organizations (CSOs) POC Resolution on the organization.”
composition of the POC (must
• Representatives from DILG, NICA, DND,
be specified) A Justification Letter shall be provided if there is no CSO
DOJ, DA, DAR, DPWH, DSWD, DOH, DTI,
DOTC, DEPED, DENR, PRESS representation in the POC to get a rating of 5.
SECRETARY, DDB, NCIP, OPAPP, PMS,
PIA, PAGC, AFP, PNP, NBI, wherever Civil Society Organization (CSO) refers to a non-state
applicable and non-profit association that works to improve
society and the human condition. Basic types of CSOs
include non-governmental organizations, civic
organizations, cooperatives, social movements,
professional groups, and business groups (DILG MC No.
2019-72).
2. Creation of Special a. POCs should have formed at least 2 SACs, 1. POC Resolution on the 5 – POPS Plan Technical Working Special Action Committee (SAC) is any committee,
Action Committees including the Peace and Order and Public Creation of any Special Action Group (TWG) + Another SAC task force, or institution created under/through the
(SACs) Safety (POPS) Plan Technical Working Group Committee/s (SAC/s) 3 – POPS Plan TWG Only POC. The council may create/establish any other SAC to
(TWG) 1 – 1 SAC Only address and prevent specific peace and order and public
0 – None safety issues and concerns (DILG MC No 2019-143).

3. POC Secretariat a. Secretariat Head: DILG Provincial Director 1. POC Resolution on the 5 – Present A member of the POC Secretariat may perform more
Composition (MC organizational structure and 0 – Absent than 1 function (i.e. Research Analyst may also be the
2019-143)

1
DEPARTMENT OF THE INTERIOR AND LOCAL GOVERNMENT
2019 PEACE AND ORDER COUNCIL (POC) PERFORMANCE AUDIT
Guidelines Form 4 (Indicator Reference for PCMs)

INDICATOR REFERENCE FOR PROVINCES, CITIES, AND MUNICIPALITIES

b. Members: composition of the POC Administrative Staff). If such is the case, it must be
Secretariat or its equivalent specified in the Resolution.
- DILG Staff as Provincial Focal Person
- Regular support staff from the Office of the Clearly indicate in the Resolution the names and specific
P/C/M POC Chair functions of each personnel.
- Research Analyst
- Information Technology (IT) Staff
- Administrative Staff
- Additional personnel, subject to availability
of funds and the usual accounting and auditing
rules and regulations.
PILLAR 2 – MEETINGS (20%)
1. Quarterly Conduct a. Four (4) quarterly meetings conducted 1. Minutes of the Meeting for all 5 – 4 minutes of the meeting If one or more meeting is conducted in a quarter, it shall
of POC Meetings quarters duly signed by the (complete) still be considered as one (1) meeting.
POC Secretariat Head and 3 – 3 minutes of the meeting
attested by the POC 2 – 2 minutes of the meeting Joint and Clustered Meetings are considered as a
Chairperson 1 – 1 minutes of the meeting Quarterly Meeting.
0 – no minutes of the meeting
ExeCom, Emergency, and other Special Meetings is not
2. Attendance sheets for all 5 – 4 attendance sheets (complete) considered as a quarterly meeting.
quarters 3 – 3 attendance sheets
2 – 2 attendance sheets If the quarterly meeting was postponed due to natural
1 – 1 attendance sheet calamities and human-induced hazards and was
0 – no attendance sheet rescheduled outside of the quarter, POCs shall attach
reports supporting the postponement, for the meeting
to be considered as a quarterly meeting.
3. Notice of Meeting / Agenda 5 – 4 notices/agenda (complete) POCs are to attach proof of acceptance /
for all quarters 3 – 3 notices/agenda acknowledgement that the members received the
2 – 2 notices/agenda Notice of Meeting/Agenda for the conduct of the
1 – 1 notice/agenda quarterly meeting. It can be in the form of an email
0 – no notice/agenda screenshot, photo of the text message, or its equivalent.
4. 2019 POC Resolution/s 5 – Present 1 Resolution provided is sufficient
Passed 0 – Absent
5. POC Resolution on the 5 - Present If the quarterly meeting was postponed due to natural
schedule of the POC Meetings 0 - Absent calamities and human-induced hazards and was
for the whole 2019 rescheduled outside of the quarter, POCs shall attach
reports supporting the postponement, for the meeting
to be considered as a quarterly meeting.

2
DEPARTMENT OF THE INTERIOR AND LOCAL GOVERNMENT
2019 PEACE AND ORDER COUNCIL (POC) PERFORMANCE AUDIT
Guidelines Form 4 (Indicator Reference for PCMs)

INDICATOR REFERENCE FOR PROVINCES, CITIES, AND MUNICIPALITIES

2. Attendance of the 1. Minutes of the meeting or 5 – 4 meetings attended (complete) Absence/s caused by emergency shall be accepted and
POC Chairperson to post activity report with 3 – 3 meetings attended considered as justified. (i.e. personal emergencies, force
the 4 POC Quarterly photo/s signifying the 2 – 2 meetings attended majeure), with proof (i.e. medical certificate, etc.)
Meetings attendance of the POC 1 – 1 meeting attended
Chairperson 0 – no meetings attended In case of absence to the RPOC Meeting/s, the RPOC
Chairperson shall provide Justification Letter/s
designating one of the 2 RPOC Vice Chairpersons to
preside the meeting/s.
PILLAR 3 – POLICIES, PLAN, AND BUDGET (25%)
1. 2017-2019 a. Compliance to the prescribed process and 1. POPS Plan Summary Form 5 – Approved POPS Plan with Pages to be uploaded in the system:
Approved Peace and format/template of the POPS Plan using the from the POPSP PCMS (Step K) Appropriations using the prescribed
Order and Public POPS Planning Guidebook format -POPS Plan Summary Form
Safety (POPS) Plan 2. POC Resolution approving 4 – Approved POPS Plan with no - POC Resolution
the POPS Plan for 2017-2019 Appropriations using the prescribed - First page of the Appropriations Ordinance containing
format the Ordinance Number and the total amount to be
3. Annual Appropriations 2 – Absence of one of the 3 required appropriated for the POPS Plan for 2019
Ordinance 2019 documents - Last page of the Appropriations Ordinance containing
0 – no POPS Plan the signatures of key officials and date
2. 2017-2019 POPS 1. POPS Plan Summary Form 5 - Present
Plan encoded in the from the POPSP PCMS (Step K) 0 - Absent
Policy Compliance
Monitoring System
(PCMS)
3. Provision of a. Presence of POC Secretariat Staff 1. Appointment / Contract of 5 - Present POCs may choose to provide 1 MOV indicated.
Support Staff and Service / Designation or its 0 - Absent
Financial Assistance equivalent The document shall NOT come from DILG but from the
to the POC Secretariat office of the POC Chairperson only.
from the Office of the b. Maintenance and Other Operating Expenses 1. Annual Appropriation 5 - Present The document shall NOT come from DILG but from the
POC Chair (MC 2019- (MOOE) Ordinance or Certification 0 - Absent office of the POC Chairperson only.
143) from the Budget Officer
concerning support to POC
Secretariat from the Office of
the POC Chairperson
PILLAR 4 – REPORTS (25%)
1. Submission of a. Timely Submission of Reporting Form 1, 1. Duly accomplished 5 – on-time submission The audit teams shall look for the proof of submission
Reporting Form 1 not later than July 15, 2019 for 1st Semester downloaded copy of the POPSP 3 – late submission (with date) and not the actual RPOC Secretariat Written
(Semestral PCMS Reporting Form 1 – 1st 0 – no submission Report.
Semester duly signed by the

3
DEPARTMENT OF THE INTERIOR AND LOCAL GOVERNMENT
2019 PEACE AND ORDER COUNCIL (POC) PERFORMANCE AUDIT
Guidelines Form 4 (Indicator Reference for PCMs)

INDICATOR REFERENCE FOR PROVINCES, CITIES, AND MUNICIPALITIES

Accomplishment POC Secretariat Head and During the audit proper, the member of the audit team
Reports) attested by the POC from the DILG shall be the one to verify if the report
Chairperson has been submitted to the NPOC Secretariat.
b. Timely Submission on Reporting Form 1, 1. Duly accomplished 5 - submissions until June 30, 2020
not later than June 30, 2020 for 2nd downloaded copy of the POPSP 4 – submissions from July 1 to
Semester PCMS Reporting Form 1 – 2nd December 31, 2020
Semester duly signed by the 3 – submissions from January 1 – April
POC Secretariat Head and 30, 2021
attested by the POC 0 - no submissions / submissions from
Chairperson April 31, 2021 onwards
c. At least 80% of financial target 1. Certification from the 5 – 75% - above
accomplished by 2nd Semester Accountant concerning the 4 – 50%-74%
POPS Plan Financial 2.5 – 25%-49
Accomplishment by second 1 – 1% - 24%
semester of 2019 0 – no utilization
d. At least 80% of physical target 1. POPSP PCMS Data 5 – 75% - above
accomplished for 2nd Semester 4 – 50%-74%
2.5 – 25%-49
1 – 1% - 24%
0 – no utilization
2. Submission of a. Timely Submission of Reporting Form 2 not 1. Duly accomplished 5 - submissions until June 30, 2020
Reporting Form 2 later than June 30, 2020 downloaded copy of the POPSP 4 – submissions from July 1 to
(Annual Progress PCMS Reporting Form 2 duly December 31, 2020
Report) signed by the POC Secretariat 3 – submissions from January 1 – April
Head and attested by the POC 30, 2021
Chairperson 0 - no submissions / submissions from
April 31, 2021 onwards
b. At least 80% of target objectives 1. Appropriate certifications 5 - 75% above
accomplished per objective to support the 3 - 55% - 74%
Reporting Form 2 2 - 45% - 54%
1 - 44% below
0 - no accomplishment
3. Submission of POC a. Submission of 1st Semester report not later 1. 2019 POC Secretariat Report 5 - on-time submission
Secretariat than July 15, 2019 through the POPSP PCMS (1st semester) duly signed by 3 - late submission
Semestral Report the POC Secretariat Head and 0 - no submission
attested by the POC
Chairperson
b. Submission of 2nd Semester report not later 1. 2019 POC Secretariat Report 3 – submissions from January 1 – April
than June 30, 2020 through the POPSP PCMS (2nd semester) duly signed by 30, 2021
the POC Secretariat Head and
4
DEPARTMENT OF THE INTERIOR AND LOCAL GOVERNMENT
2019 PEACE AND ORDER COUNCIL (POC) PERFORMANCE AUDIT
Guidelines Form 4 (Indicator Reference for PCMs)

INDICATOR REFERENCE FOR PROVINCES, CITIES, AND MUNICIPALITIES

attested by the POC 0 - no submissions / submissions from


Chairperson April 31, 2021 onwards
PILLAR 5 – INNOVATION/S (20%)
1. Innovation/s a. Innovation/s related to peace and order 1. For new innovation/s: 5 – Present POCs may provide at least one (1) MOV indicated
and/or public safety 0 – Absent
Approved project proposal Innovation is a pioneering, strategic, effective, high
/activity design, the council impact, and sustainable initiatives that are deliberately
should have adopted the designed to address gaps in peace and order and public
activity through a resolution, safety within the locality. It is something new that was
financial accomplishment, and introduced or something formerly introduced but was
photo documentations. enhanced or improved and the significant change has
been felt in the community (impact).
For an enhanced/improved
innovation/s: (i.e. Framework, Roadmap)

MOVs are narrative report with - It must be introduced within the last 3 years
signature(s) and/or agreement - Cost-cutting measures
of key persons containing - Improvement in internal administrative systems and
background on the internal controls
project/program and how they - Recognized by reputable institutions of learning,
were able to improve/enhance research or policy studies
that specific project or
program, project
proposal/activity design,
resolutions, result of
assessment.

NOTE: If in case a POC in Regions IV-B (MIMAROPA), VI, VII, VIII, X, and XIII (CARAGA)1 is not able to upload a document required for the conduct of the Audit due to the damages brought
about by the Typhoon Odette, they shall submit a notarized certification, attached hereto as Annex E, stating that the documents required for the Audit were damaged by the said
typhoon.

• The said certification shall be submitted in the system in lieu of the damaged and/or unretrievable document.
• The submission of the certification and the scoring of the pillars to which these documents are submitted to are subject to the evaluation of the Audit Team.

1 Regions identified to be severely and adversely affected by Typhoon Odette, and were placed under the State of Calamity pursuant to Proclamation No. 1267.
5

You might also like