Professional Documents
Culture Documents
Assignment 1 Digital Proto
Assignment 1 Digital Proto
ACADEMIC
2020-21
YEAR
Alandi (D), Pune – 412105 SEM / TRI IV
CLASS &
SCHOOL OF MECHANICAL AND CIVIL SY B.Tech
DIVISION /
ENGINEERING (MECHANICAL C1)
BLOCK
Que. CO BT
Question Description Marks
No. No. Level
DETAILS
SUBMITTED BY
Conceptual Drawing:
A] Free hand Drawing:
No Head Cost/Product
1 Material cost / Product 200
2 Electronic Component cost/Product 1465
3 Packaging Cost/ Product 30
4 Special Process Cost/ Product -
5 Manpower/ Product -
6 Logistics/ Product -
7 Partial expenditure from (other Rent, Electricity etc.) -
8 Marketing cost -
9 Any other cost/ Product (Commissions/Discount) -
Total Making cost 1695
Profit Margin 10%
Taxes (CGST/SGST) 18%
Selling Cost 2199.00
Final Cost of product 2199.00
Stage 2: Development
•After the circuit is designed.
•Start working on the software appearance of the product.
•The product must be designed by keeping ergonomics in the consideration.
•The product should be handy and easy to handle/use.
Stage 3: Testing
•Start designing the circuits.
•Work on the modern tinkercad designs.
•Make a suitable and effective tinkercad circuit for the product and test the circuit using
simulation software.
•The testing must be done in stipulated time.
Stage 4: Launching
•After the completion of the product, work with the marketing team to launch the product.
•Choose a certain platform to launch the product.
Executive Release
Mar
Review Oct
Candidate
10 1
Project Executive Beta Final
Kickoff
Jan Mar
Decision Jun
Release Oct
Release
25 21 30 20
2021
Ja Fe Ma Ap Ma Ju Ju Au Se Oc No De
n b r r y n l g p t v c
Assemble
Resources
Working
Plan Plans Subcontractor
SelectionHelpdesk Planning R2
Content Plan Begin
Performance Test Monitori Phase Load
Test Validation Complete
Integrati ng Integrati Sync
Integratio Balance
on I on II n III
Prototy Alpha
pe Build Development
Phase I
Develop
Development
Phase II
RC Pilot RTW
Deployment Deployment
V2 Development
Begins
Sun, Nov 1, WW Launch
2020 Event
Beta Blog July 4, Gartner Analyst November
Launch
Launch 2020 Review 1, 2020
Press August 2, Public November
Release 2020 Website Live 1, 2020
1. Product Assembly
Enclosure Requirements
Technical Specifications
SMCE, MITAOE, PUNE
FEATURES
Easy to Use
Comfortable
INPUT SPECIFICATIONS
Voltage 12 V DC
Current 3 Amp
Operating Voltage 5V
OUTPUT SPECIFICATIONS
Power Consumption For 5V DC @300-500 mA =1.5 ± 0.5W
GENERAL SPECIFICATIONS
Operating Temp 5 0C to 100 0C
Dimensions (250 X 150 X 80)mm
Color Available in any colour
Weight 450 gm
Competitor Survey
No Head Details Product Photo
Competitor Analysis
Company Cost Graph
Medcenter 2600
Tabtime 1800
Ultmost 2100
Cost
MedQ 5000
E-pill 3500
Our Product 2199
MedQ 9.5
E-pill 9.3
Maintainance(10)
Ultmost Breaking of lid(8)
MedQ Not waterproof(8)
Weak
E-pill
connections(9)
Our Product Not waterproof(8)
Consideration of Product
Aesthetics:
We need to develop a portable hand comfortable medicine reminder with the name of
medicine which will efficiently work for the targeted or dedicated customer.
Ergonomics:
This medicine reminder will be the most comfortable device of same sized as of
smartphone.
Materials:
For the easy and comfortable usage and to develop light weight product we will made
the product of fibre material which will be greater resistant for the humid environment
also.
Manufacture:
For manufacturing process, we will use disciplinary process, advance techniques and
accurate machinery.
Modularity:
As we are developing this by using all electronics components, if some part get fails;
the spare parts will also available to repair that instead of buying new one.
Sustainability
Due to its build quality, it can be a lifelong product for use in good hands. It will
sustain as waterproof at some extent. And can resist in warm environment too. It will
never lose its functionality in small accidents and abnormality in environment.